Project overview

Dlh Kesley is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800002310. Dlh Kesley is located at Lthbsqomckzkfg2zc39f9g==. This is a Ongoing being developed by Dlh Pansn Developers Llp.

Dlh Kesley has 2 BHK Apartments with carpet areas ranging from 573 to 741 Sq.ft. Carpet. The Project has total 95 of which 1 are currently available for sale.

Dlh Kesley is being developed on a total land area of 22004 Sq.ft. out of which 3301 Sq.ft. i.e 15% is reserved for recreational purposes. Dlh Kesley has 2 Wings / Towers Dlh Kesley Wing A,Dlh Kesley Wing B

ProjectDeveloperLocationPossession
Mahalaxmi Prasad BuildingSudheer Dadarkar4Awaxrq7yzwd9q5lokd6pa==31-12-2018 00:00:00
Om SamarpanK Mehta And Company+Uqdatqq02brjolymxnkr3lttugfltghgmgs9rljvi0=31-07-2019 00:00:00
Veena Signature Veena Developers+Lkewewbgnofioov6jia6nzscxzrgp08mrns6/9Oeda=31-12-2019 00:00:00
Supreme MadhukarSupreme EnterprisePeh0rb68lyw/P/Clh+Vnbko8kslupxsjw3yxezl8eqgenlw45afl1teambgycfor/Rhroxdxwuww5whmgrn7dhxrnfjboo16fuphtafjkka=05-01-2025 00:00:00
Borivali Padam ChslAmisha Constructions Private LimitedVkjxlk7ram1q9lc2x7nr4s30zxb9qiwtevzgcndvmuu=30-06-2025 00:00:00
Manek Terrace Chs LtdK T GroupMumbai Suburban, 40009228-02-2017 00:00:00
Rajal - Veer Abhimanyu Chs LtdNisar Properties Pvt. Ltd.Y4bloabstw6mevk2jk7rvanjskwirkwcc+Mxjhjne/A=30-06-2023 00:00:00
Borivali Neelkanth Nagar Chs LtdMahavir InfrastructureYdhr4fsuj+7Byghyw2yfrodabfikvt4tj+Yp26o4vpwuknkswd0nvbosm0hx1jpn31-12-2020 00:00:00
VrindavanDinesh Amrutlal ThakkarNciqn0e0lyhnfovfzvsymw==31-12-2025 00:00:00
OmkareshwarTriumph VenturesLn/U3za3tme5ntec4so27g==31-12-2024 00:00:00
Mehta Premiere-ResidentialAsiatic Trading And Construction CompanyZmbpqw4w0phlkhn0qnbzr6tjewwulbmvsmvskcgghfy=31-12-2025 00:00:00
Casa RareGeopreneur Corp Pvt LtdVixn1njzx8tt8ilbh+9Ydq==31-03-2019 00:00:00
Luminaire GoldYash DevelopmentAht8uen77gej3vkjstnruxxbouor/Kfbojynvxuz5sm=30-12-2022 00:00:00
Rite AspireRite Developers Pvt. Ltd.K0+Vf0fzpjs2cslebgkrww==30-06-2021 00:00:00
Om Sarjan ChslGlasswood Realty Private LimitedS9enuv1vhiacwso9y5l5y0oag3rnv1xfv5plmxj4cac=31-12-2019 00:00:00
Madhuban HeightsWadhwana Housing Development And Infrastructure CoMr7gfpfibxc3wn06xrp4za==31-08-2018 00:00:00
Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd.Kaustubh Construction Private LimitedW1uctr/Wqtozxf9hv8eega==31-12-2018 00:00:00
VrindavanRight Channel Construction Pvt LtdCarter Road No 331-12-2017 00:00:00
Kcd RidgewoodKcd Heritage Pvt LtdBorivali, 400092, Mumbai Suburban29-02-2020 00:00:00
Neelkamal HeightsOsho DevelopersNf29p/Ysv6pvovtywscrfw==31-12-2017 00:00:00
Rashmi VasudeoModi's Navnirman LimitedTotziradavajcmsoeizv5g==11-08-2025 00:00:00
Kasturi MilanH Rishabraj Realty+Rh7nunxssnnqaw2ppi7wq==28-02-2025 00:00:00
Shraddha ParadiseShraddha Prime Projects LimitedPp5wyv8nhamja7wycq9rilfg7/H+Aerux2fby84fxys=31-12-2028 00:00:00
Rishabraj Park VistasH Rishabraj RealtyMorxh9esfwykp2n9n3/Ezg==31-12-2025 00:00:00
Anjani TirthGeeta Space RealtorsVrzjq5fysmd3amvbjrodzpxyrlw3fssw28reuy0g7dc=31-12-2024 00:00:00
Auris Business CentreDev Pooja Builders Pvt LtdCu5b0fb2nzes96gktfdr1q==31-12-2024 00:00:00
Orchid TowerShree Laxmi Estate Pvt. Ltd.Wghra9fonmcak01tbhciuzlcoe4bsz8vimwj90trrgc=31-03-2026 00:00:00
AureateNext Space Realty LlpOhchb6psvfj/En2idpcl4em2tb4el7sr57gzd8qsush+9A8eokb4cocprz1lxtd+Scc4oee7npieigze+Vuyi6gi7lhb/Bbrkmzar3xi3u4x/Siirv6m1gp+Iasycvwa30-06-2027 00:00:00
Ananda ResidencyParadigm Ambit BuildconNhfxqbot8wbhmecajmbirxggtwijr03fskytxgjeg8s=31-12-2019 00:00:00
Sakshat NavkarNavkar Infra Projects4Ftzuz95iazeikpjlkzhpxgu/3Gdk1xd0tqiz1pnwss=30-09-2019 00:00:00
Sajag ChsNavkar Infra Projects5S6snxgjtjt3dgklkx6bmw==24-06-2019 00:00:00
Gautam PrabhuH Rishabraj RealtyNypezzhkdrtqoptt/Qxboq==30-04-2027 00:00:00
Alliance EternisAlliance City Developers Realtors Pvt LtdBbqmsplyj2zf7c4vhhn6ig==30-04-2027 00:00:00
Dollars Avenue ChslM/S Hirani RealtorsWdo3hbdvzglkjxpv7pziyw==02-11-2027 00:00:00
Rustomjee PinnacleKeystone Realtors LimitedTrhrq1qevvvlgmgvnylxyq==31-12-2018 00:00:00
Borivali Ranjee ChsAditya Developers400092, Mumbai Suburban27-12-2018 00:00:00
Adinath ChsAditya Developers400092, Mumbai Suburban22-04-2020 00:00:00
Shiv AaradhanaBrightmen Buildspaces Llp7Jamtfw/Rdpu3yhhqqbqgw==30-12-2023 00:00:00
Pushp Vinod-3Vas Infrastructure Ltd.Mumbai Suburban, 40009215-12-2015 00:00:00
Modispaces AmazonModispaces Real Estate Pvt Ltd2Ogqhyhyfohnm10l4pmnhluxorumaso5ujrfud1tem0=31-12-2019 00:00:00
New Anamika Triveni FortuneTriveni DevelopersMumbai Suburban, 40009230-09-2017 00:00:00
Dps AishwaryaBp Infra Kalindi DevelopersWivydwdc2lrqrzymyqkpxcz1izban2kmdct9xjltnuu=28-02-2022 00:00:00
Ankur PalaceOsho Developers6+Zboysub/Z3mqeckaqfbg==15-08-2019 00:00:00
SwashrayShanti EnterpriseLa9isq7/Ymgz1utqeg05va==30-05-2022 00:00:00
SamtaGreen Tree Lifescapes LlpEf8olezrxhxcsnr+Mmfhjq==01-08-2022 00:00:00
Ramkrupa ChslKosmos&Amp;T-CreationL T Road30-03-2024 00:00:00
Ajmera ManorAjmera Manor Private LimitedLoxnpde8y8i2c6e4hwy2uzhz6y/Ujtjehwd7gxngt4qge2turucvzhchpekftbpf31-12-2025 00:00:00
Anamika Niwas ChslltdAnamika Niwas Chs Ltd5Inqwywnmihmpaqjocgw8a==31-03-2024 00:00:00
MahirrShree Balaji EnterpriseDuezwocs3vf4adbaa7ytuv8fa2qn0es2p4f+Manpxl4=31-12-2026 00:00:00
Satra ParkShreenivas Developers9Cai4tmnfwz7i1kmnhlukw==30-12-2021 00:00:00
Pushp Vinod - 15Vas Infrastructure Ltd.Mmv5sj/+Wzraxz4wviucya==30-12-2021 00:00:00
Sunrise Orlem 2A Phase 1Dhaval Housing AopYnvaqyy3owvs1ftssnxsyx7rxlalmoo3/Cy9gumntnq8/Q9gnyenqguf0zrdevdi31-12-2019 00:00:00
Kedar DarshanKosmos Developers+K7uqcknddbtfpuxbnlolq==11-04-2027 00:00:00
The Jambli Galli Chs LtdMahavir Corporations5Iyewjzapmayblkx9vbwgq==31-03-2024 00:00:00
Maya MamtaGreenbuilding Lifescapes LlpXg9ydromzadlfey8cid30w==07-10-2025 00:00:00
Proposed Red On Plot Bearing Fp No 40 Of Tps Iii Village Borivali West MumbaiSurbhi Midas ConstructionC8bjqxgwo1fvz2enmax3sq==31-05-2025 00:00:00
Rishabraj AradhanaH Rishabraj RealtyY5sxysqg5zdsk0rjndpmpg==31-07-2026 00:00:00
Redevelopment Of Lakshman Tower ChslPranav Constructions LimitedHuocmcvfsmizzx0yqdejua==13-03-2027 00:00:00
Daivi EterneetyYash DevelopmentP//Rsptc7m9nt3d98fxxeq==31-12-2026 00:00:00
Rishabraj RameshwarH Rishabraj Realty+Vwoh6hxo7a/Vjxzufl9sq==31-08-2024 00:00:00
Supreme ImperialSupreme Real Estate DeveloperK7nflpkp4xjkewpwty6edsab4cy6d1fztujtl3xvnji=30-04-2025 00:00:00
SiddhivinayakTriumph Ventures0F6qnzdzeajed7+Kubynjq==30-06-2021 00:00:00
Sky HeightsCrystal ConstructionsPpqlx/Wsktiupfjh8xqnzxcf+Sakycymrexypvo5cyk=30-12-2021 00:00:00
Lotus PrestigeEssen Builders And DevelopersNzpqnx8yamy3cy0tzraszhtrirpj2maaafy2qbuguubtr89cjqsxaqhgbepvqvsf31-12-2017 00:00:00
Meghalok HeightsS S Landmark Private LimitedQw2twsb5a9yzwpm50pvrkw==31-12-2025 00:00:00
Vir EnclaveJkd Engineers And Infrastructure Private LimitedAlopr7c+8Dhxnrab5knlfa==30-06-2025 00:00:00
Preesha ParadiseVastu Realtors And DevelopersMlhmjwgmcni5mg0ujpmpqg==31-12-2025 00:00:00
Fortune Avirahi Wing AFortune ConstructionsXdxuagp4+Pjlndvykxvbkkjtrblhqjyap/13X7iqiw4=30-12-2022 00:00:00
Ostwal TowerUnnati Builders5M3kmkuaxv2ehz7qd9x0pg==31-12-2018 00:00:00
Mayur Pankh Chs Ltd.Brightmen Buildspaces LlpOdltdaghukpxcdmkngovwa==30-12-2022 00:00:00
OliveAbdul Hamid Mapkhan Shah4Pn0gxls4olc2qrdy6onsaz4uj72mvf5gp2je05ixgvvke0xr1r/Xhvoh2g/Hsu/31-12-2027 00:00:00
SwastikReliance CorporationDxcyhwmruvmzh2l9bqfvqg==30-09-2026 00:00:00
Anmol ResidencyB B EnterpriseNe2gbhrptgulmii1ocepyg==31-12-2028 00:00:00
Anjani ShikharGeetaspans Realtors Private Limited1Kx3kwz3nd1gs73m5wlhxg==31-12-2027 00:00:00
House Of Shreeji SharanMiles Infra Llp5C2fi473ncghad8z314zla==30-09-2026 00:00:00
Shreeji FioraShreeji Sharan Realtors LlpOk0e0adrszwifk6tamqytlq95gvdv0kug4evclnpamc6f1pctdgjo3e2v0udsq/5Kfigf5z0896ah2pj1zuir7lfbv3nqodjow2/Rx0sdya=31-12-2027 00:00:00
Brahma AashirvadM/S Brahma RealtorsL4fw/Xb/Bde+Esmzgx5ywg==26-02-2026 00:00:00
Triguni HeightsTriguni Builders & Developers Pvt LtdEjrceqgs/Pl0eioys+T9dg==31-12-2027 00:00:00
Zen PristineKonark Shakti Group Of CompanyBx/Ic+Ygfnc7f2cnmgfj5w==31-12-2028 00:00:00
Ruparel ZinniaAmi Modispaces Llp9H1gxtvmidufbhzfyt9n7beop5rovf0qeunby/2Wtckszrtwqus49xf0lt7r+Nlnoasdgvupje5ur2o7ljfhf9kskuztuxjxqrrhu8xuvwhjjwmcaen1k2fwntnm3zh/30-06-2028 00:00:00
TreviAshirwad Nice Developers1Bhxkrolxvxgicmpwczdgstiiqamtmutvici0x+R5rw=31-12-2025 00:00:00
New Abhiram Chs LtdPeerless Constructions Pvt. Ltd.Ejrceqgs/Pl0eioys+T9dg==30-06-2025 00:00:00
Trilogy Vithal Co-Operative Housing Society LimitedTrilogy Infra Private LimitedQbo06p1sngkgd0+Uoqymow==31-12-2027 00:00:00
Om Satyam Niwas Chs LtdGreenfield Developers & Realtors LlpRkq6f7lurgk/Q6vmvhkblccij6f0c4oldzxtbfzqtfmmjgierg+K9uqqjirkytwprpfq8evst/Xmkbr3n2ojkw==31-07-2020 00:00:00
Dlh KesleyDlh Pansn Developers LlpLthbsqomckzkfg2zc39f9g==31-03-2019 00:00:00
Rishabraj MangaleshRishabraj Infra LlpJnogpjz9e00iq1tf8jaxgw==31-12-2026 00:00:00
Pratap AdinathJpv Realtors Private LimitedVi/+1Hgqp0r5a4g5ogvh8sht0afzbwfzpwo2vnz2cj4=31-12-2027 00:00:00
ArhamDsd Realty 31-03-2030 00:00:00
Ganesh Siddhi 2Shanti Enterprise400092, Mumbai Suburban08-01-2018 00:00:00
Avenue 641Dimple CreationsSruqowqkfvv7osl5nz739mloa9jr3whsyw5vxnqgcfq=30-09-2020 00:00:00
Jessika Chs.Ltd.Vinayak DevelopersPa/Neqil66m+54Atxxa7ow==30-12-2020 00:00:00
Krishna KoynaJkd Engineers And Infrastructure Private LimitedWyt5uaziopfpm1/Unmtwygzdue7n0qoy6gd+Pcfozto=15-05-2024 00:00:00
AtulyaPhoenix Developers/2Iy8ztmc4wnu4ewskljea==31-12-2026 00:00:00
GiirnarMahavir Land Developer31-12-2029 00:00:00
Rbies Jaidatta ChslRbies Jaidatta ChslO5bnrb2zlbe2nbygomxozg==31-12-2023 00:00:00
Ebhaan EnclaveSawant Constructions31-05-2027 00:00:00
ChaitanyaOvk Co-Operative Housing Society Limited31-12-2027 00:00:00
Gold LeafShelaji Horizon Llp31-12-2029 00:00:00
Jpc VeloraAquarius Realty Private Limited31-12-2032 00:00:00
One ReserveNeminath And Disha Realtors31-12-2030 00:00:00
Manorama JewelM/S Manorama Corporation31-08-2028 00:00:00
Rishabraj AetheriaRishabraj Estate Developers Pvt Ltd31-12-2032 00:00:00
Rishabraj AnujaH Rishabraj Developers30-06-2028 00:00:00
The CrimsonI M Builtkon Private Limited30-12-2030 00:00:00
Shimpoli Sai SmrutiShaurya Realty31-12-2027 00:00:00
Project Details
  • Project:
    Dlh Kesley
  • Location:
  • Lthbsqomckzkfg2zc39f9g==
  • Const. Stage:
    Ongoing
  • Possession:
    31 Mar 2019
Developer Details

  • Developer:
    Dlh Pansn Developers Llp
  • Phone:
  • Address:
  • Dev Plaza
Project RERA Details
MAHA REARA No: P51800002310
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Bhavin Hemal Architects
Funding Bank PUNJAB NATIONAL BANK
Proposed Possession 31 Mar 2019
Revised Possession 31 Mar 2019
Extended Possession
Litigations No Litigations
Last Modified 31 Jul 2017
Last Retrived 13 Feb 2026
Dlh Kesley QR Code
Dlh Kesley
MahaRERA - P51800002310
Apartment Details & Configuration
TypeArea
1 BHK40.6 Sq.mts. ( 437 Sq.ft. )
2 BHK48.03 Sq.mts. ( 517 Sq.ft. )
2 BHK50.82 Sq.mts. ( 547 Sq.ft. )
2 BHK54.63 Sq.mts. ( 588 Sq.ft. )
2 BHK54.76 Sq.mts. ( 589 Sq.ft. )
2 BHK55.65 Sq.mts. ( 599 Sq.ft. )
2 BHK55.74 Sq.mts. ( 600 Sq.ft. )
2 BHK62.82 Sq.mts. ( 676 Sq.ft. )
2 BHK64.58 Sq.mts. ( 695 Sq.ft. )
2 BHK65.59 Sq.mts. ( 706 Sq.ft. )
2 BHK67.28 Sq.mts. ( 724 Sq.ft. )
2 BHK67.38 Sq.mts. ( 725 Sq.ft. )
2 BHK68.78 Sq.mts. ( 740 Sq.ft. )
2 BHK71.4 Sq.mts. ( 769 Sq.ft. )
2 BHK71.41 Sq.mts. ( 769 Sq.ft. )
2 BHK72.48 Sq.mts. ( 780 Sq.ft. )
3 BHK124.29 Sq.mts. ( 1338 Sq.ft. )
2 BHK53.23 Sq.mts. ( 573 Sq.ft. )
2 BHK53.32 Sq.mts. ( 574 Sq.ft. )
2 BHK54.62 Sq.mts. ( 588 Sq.ft. )
2 BHK54.64 Sq.mts. ( 588 Sq.ft. )
2 BHK64.83 Sq.mts. ( 698 Sq.ft. )
2 BHK66.08 Sq.mts. ( 711 Sq.ft. )
2 BHK67.35 Sq.mts. ( 725 Sq.ft. )
2 BHK67.4 Sq.mts. ( 725 Sq.ft. )
2 BHK68.8 Sq.mts. ( 741 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Dlh Kesleylast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Wip
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Wip
Landscaping & Tree Planting100% completed
95% Complete
Wip
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Wip
Solid Waste Management And Disposal
0
Storm Water Drains100% completed
95% Complete
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Wip
Water Supply
0
Buildings / Wings in Dlh Kesley
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Dlh Kesley by Dlh Pansn Developers Llplast updated on 13 Feb 2026 as per information obtained from MARA RERA.

22004 Sq. ft.

Project Area

3301 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

95 apartments in total
Total
95
Booked
94
Available
1

Saleable Area Statistics (Sq. ft.)

60642 Total
Total
60642
Booked
59917
Available
725
Total 95 apartments in project. 94 apartments booked. 98% apartments booked.
Total 60642 Sq.ft. saleable area. 59917 saleable area booked.
99% area booked.

Dlh Kesley Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Dlh Kesley Wing AMar 20191910112147
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.6 Sq.mts. ( 437 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK48.03 Sq.mts. ( 517 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK50.82 Sq.mts. ( 547 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK54.63 Sq.mts. ( 588 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK54.76 Sq.mts. ( 589 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK55.65 Sq.mts. ( 599 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK55.74 Sq.mts. ( 600 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK62.82 Sq.mts. ( 676 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK64.58 Sq.mts. ( 695 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK65.59 Sq.mts. ( 706 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK67.28 Sq.mts. ( 724 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK67.38 Sq.mts. ( 725 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK68.78 Sq.mts. ( 740 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK71.4 Sq.mts. ( 769 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK71.41 Sq.mts. ( 769 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK72.48 Sq.mts. ( 780 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK124.29 Sq.mts. ( 1338 Sq.ft. )1
1 Booked100% Booked
100% Booked
50 total apartments / 50 apartments booked. 100% apartments booked.
Work Description in Building Dlh Kesley Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Dlh Kesley Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Dlh Kesley Wing BMar 20191710112032
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.23 Sq.mts. ( 573 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK53.32 Sq.mts. ( 574 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK54.62 Sq.mts. ( 588 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK54.63 Sq.mts. ( 588 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK54.64 Sq.mts. ( 588 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK55.74 Sq.mts. ( 600 Sq.ft. )10
10 Booked100% Booked
100% Booked
2 BHK64.83 Sq.mts. ( 698 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK66.08 Sq.mts. ( 711 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK67.35 Sq.mts. ( 725 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK67.4 Sq.mts. ( 725 Sq.ft. )5
4 Booked80% Booked
80% Booked
2 BHK68.8 Sq.mts. ( 741 Sq.ft. )1
1 Booked100% Booked
100% Booked
45 total apartments / 44 apartments booked. 97% apartments booked.
Work Description in Building Dlh Kesley Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Dlh Pansn Developers Llp
for Project
Dlh Kesley
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation