Project overview

Discover Condos is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000006498. Discover Condos is located at 73/2, 73/4, 73/1D, 74/0. This is a Ongoing being developed by Silvex Realty Private Limited.

Discover Condos has Studio & Studio plus Loft Apartments with carpet areas ranging from 5533 to 9483 Sq.ft. Carpet. The Project has total 209 of which 33 are currently available for sale.

Discover Condos is being developed on a total land area of 263341 Sq.ft. out of which 26910 Sq.ft. i.e 10% is reserved for recreational purposes. Discover Condos has 7 Wings / Towers A,B,C,E,F,G,H

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Discover Condos
  • Location:
  • 73/2, 73/4, 73/1D, 74/0
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jul 2018
Developer Details

  • Developer:
    Silvex Realty Private Limited
  • Phone:
  • Address:
  • Silvex House
Project RERA Details
MAHA REARA No: P52000006498
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Rahul Agaj
Funding Bank HDFC BANK
Proposed Possession 30 Jul 2018
Revised Possession 30 Jul 2018
Extended Possession
Litigations No Litigations
Last Modified 14 Aug 2017
Last Retrived 28 Jul 2025
Discover Condos QR Code
Discover Condos
MahaRERA - P52000006498
Apartment Details & Configuration
TypeArea
Studio501 Sq.mts. ( 5393 Sq.ft. )
Studio plus Loft832 Sq.mts. ( 8956 Sq.ft. )
Studio508 Sq.mts. ( 5468 Sq.ft. )
Studio plus Loft910 Sq.mts. ( 9795 Sq.ft. )
1 BHK757 Sq.mts. ( 8148 Sq.ft. )
1 BHK773 Sq.mts. ( 8321 Sq.ft. )
2 BHK1271 Sq.mts. ( 13681 Sq.ft. )
2 BHK1286 Sq.mts. ( 13843 Sq.ft. )
Studio514 Sq.mts. ( 5533 Sq.ft. )
Studio plus Loft881 Sq.mts. ( 9483 Sq.ft. )
Studio plus Loft883 Sq.mts. ( 9505 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Discover Condoslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Fully Developed Alongwith Swimming Pool
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Seperate Transformer And Meter Room For Each Build
Energy management100% completed
95% Complete
Led Lights Key Tac System Installed
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Fire Extinguisher Installed As Per Requirement
Landscaping & Tree Planting100% completed
95% Complete
Gardening And Tree Plantation
Open Parking100% completed
95% Complete
Provided As Per Requirement
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Sewerage Chamber Line And Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Strom Water Drainage Line
Street Lighting100% completed
95% Complete
Street Lights Installed At Site
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rain Water Is Harvested In Rwh Pit
Water Supply100% completed
95% Complete
Bore Well River Water Liftedin Overhead Water Tank
Buildings / Wings in Discover Condos
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Discover Condos by Silvex Realty Private Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

263341 Sq. ft.

Project Area

26910 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

209 apartments in total
Total
209
Booked
176
Available
33

Saleable Area Statistics (Sq. ft.)

1507617 Total
Total
1507617
Booked
1310582
Available
197035
Total 209 apartments in project. 176 apartments booked. 84% apartments booked.
Total 1507617 Sq.ft. saleable area. 1310582 saleable area booked.
87% area booked.

A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AJan 19003100060
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Studio501 Sq.mts. ( 5393 Sq.ft. )18
6 Booked33% Booked
33% Booked
Studio plus Loft832 Sq.mts. ( 8956 Sq.ft. )9
9 Booked100% Booked
100% Booked
27 total apartments / 15 apartments booked. 55% apartments booked.
Work Description in Building ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
BJan 19003100060
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Studio508 Sq.mts. ( 5468 Sq.ft. )17
17 Booked100% Booked
100% Booked
Studio plus Loft910 Sq.mts. ( 9795 Sq.ft. )9
8 Booked88% Booked
88% Booked
26 total apartments / 25 apartments booked. 96% apartments booked.
Work Description in Building BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
CJan 19003100050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK757 Sq.mts. ( 8148 Sq.ft. )14
14 Booked100% Booked
100% Booked
1 BHK773 Sq.mts. ( 8321 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK1271 Sq.mts. ( 13681 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK1286 Sq.mts. ( 13843 Sq.ft. )2
2 Booked100% Booked
100% Booked
24 total apartments / 24 apartments booked. 100% apartments booked.
Work Description in Building CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
EJan 19003100060
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Studio514 Sq.mts. ( 5533 Sq.ft. )21
21 Booked100% Booked
100% Booked
Studio plus Loft881 Sq.mts. ( 9483 Sq.ft. )11
11 Booked100% Booked
100% Booked
32 total apartments / 32 apartments booked. 100% apartments booked.
Work Description in Building ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
FJan 19003100060
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Studio514 Sq.mts. ( 5533 Sq.ft. )21
20 Booked95% Booked
95% Booked
Studio plus Loft881 Sq.mts. ( 9483 Sq.ft. )11
11 Booked100% Booked
100% Booked
32 total apartments / 31 apartments booked. 96% apartments booked.
Work Description in Building FCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
GJan 19003100060
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Studio514 Sq.mts. ( 5533 Sq.ft. )24
24 Booked100% Booked
100% Booked
Studio plus Loft883 Sq.mts. ( 9505 Sq.ft. )12
11 Booked91% Booked
91% Booked
36 total apartments / 35 apartments booked. 97% apartments booked.
Work Description in Building GCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
HJan 19003100060
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Studio514 Sq.mts. ( 5533 Sq.ft. )21
5 Booked23% Booked
23% Booked
Studio plus Loft881 Sq.mts. ( 9483 Sq.ft. )11
9 Booked81% Booked
81% Booked
32 total apartments / 14 apartments booked. 43% apartments booked.
Work Description in Building HCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Silvex Realty Private Limited
for Project
Discover Condos
last updated on 28 Jul 2025 as per information obtained from MARA RERA.