Project overview

Dignity Bayview is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900048008. Dignity Bayview is located at 438Pt 597Pt 612Pt613 614 615 616Pt 617 618Pt 619Pt 620Pt 649Pt 650Pt. This is a New being developed by Dignity Realty And Housing.

Dignity Bayview has 1 BHK & Shop Apartments with carpet areas ranging from 141 to 381 Sq.ft. Carpet. The Project has total 171 of which 97 are currently available for sale.

Dignity Bayview is being developed on a total land area of 25742 Sq.ft. out of which 2060 Sq.ft. i.e 8% is reserved for recreational purposes. Dignity Bayview has 2 Wings / Towers Dignity Bayview,Shree Bhairavnath Heights

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Dignity Bayview
  • Location:
  • 438Pt 597Pt 612Pt613 614 615 616Pt 617 618Pt 619Pt 620Pt 649Pt 650Pt
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Dignity Realty And Housing
  • Phone:
  • Address:
  • Bhagwan Bhuwan
Project RERA Details
MAHA REARA No: P51900048008
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 07 Dec 2022
Last Retrived 26 Jul 2025
Dignity Bayview QR Code
Dignity Bayview
MahaRERA - P51900048008
Apartment Details & Configuration
TypeArea
2 BHK65.38 Sq.mts. ( 704 Sq.ft. )
2 BHK65.4 Sq.mts. ( 704 Sq.ft. )
2 BHK65.49 Sq.mts. ( 705 Sq.ft. )
2 BHK68.5 Sq.mts. ( 737 Sq.ft. )
2 BHK68.81 Sq.mts. ( 741 Sq.ft. )
2 BHK72.87 Sq.mts. ( 784 Sq.ft. )
2 BHK72.93 Sq.mts. ( 785 Sq.ft. )
3 BHK95.82 Sq.mts. ( 1031 Sq.ft. )
3 BHK97.69 Sq.mts. ( 1052 Sq.ft. )
3 BHK99.96 Sq.mts. ( 1076 Sq.ft. )
1 BHK32.47 Sq.mts. ( 350 Sq.ft. )
1 BHK33.72 Sq.mts. ( 363 Sq.ft. )
1 BHK34.9 Sq.mts. ( 376 Sq.ft. )
1 BHK35.35 Sq.mts. ( 381 Sq.ft. )
Shop13.1 Sq.mts. ( 141 Sq.ft. )
Shop13.55 Sq.mts. ( 146 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Dignity Bayviewlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Approved Plan
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Approved Plan
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Approved Plan
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Approved Plan
Solid Waste Management And Disposal
As Per Approved Plan
Storm Water Drains
As Per Approved Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
As Per Approved Plan
Water Conservation, Rain water Harvesting
As Per Approved Plan
Water Supply
As Per Approved Plan
Buildings / Wings in Dignity Bayview
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Dignity Bayview by Dignity Realty And Housinglast updated on 26 Jul 2025 as per information obtained from MARA RERA.

25742 Sq. ft.

Project Area

2060 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

171 apartments in total
Total
171
Booked
74
Available
97

Saleable Area Statistics (Sq. ft.)

87526 Total
Total
87526
Booked
39477
Available
48049
Total 171 apartments in project. 74 apartments booked. 43% apartments booked.
Total 87526 Sq.ft. saleable area. 39477 saleable area booked.
45% area booked.

Dignity Bayview

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Dignity BayviewDec 20261410100104
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK65.38 Sq.mts. ( 704 Sq.ft. )19
5 Booked26% Booked
26% Booked
2 BHK65.4 Sq.mts. ( 704 Sq.ft. )18
2 BHK65.49 Sq.mts. ( 705 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK68.5 Sq.mts. ( 737 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK68.81 Sq.mts. ( 741 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK72.87 Sq.mts. ( 784 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK72.93 Sq.mts. ( 785 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK95.82 Sq.mts. ( 1031 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHK97.69 Sq.mts. ( 1052 Sq.ft. )4
None Booked0% Booked
0% Booked
3 BHK99.96 Sq.mts. ( 1076 Sq.ft. )1
1 Booked100% Booked
100% Booked
61 total apartments / 28 apartments booked. 45% apartments booked.
Work Description in Building Dignity BayviewCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress42% done
42% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress35% done
35% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress20% done
20% Booked

Shree Bhairavnath Heights

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shree Bhairavnath HeightsDec 2026291010046
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.47 Sq.mts. ( 350 Sq.ft. )25
1 BHK33.72 Sq.mts. ( 363 Sq.ft. )28
17 Booked60% Booked
60% Booked
1 BHK34.9 Sq.mts. ( 376 Sq.ft. )27
11 Booked40% Booked
40% Booked
1 BHK35.35 Sq.mts. ( 381 Sq.ft. )28
12 Booked42% Booked
42% Booked
Shop13.1 Sq.mts. ( 141 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.55 Sq.mts. ( 146 Sq.ft. )1
1 Booked100% Booked
100% Booked
110 total apartments / 46 apartments booked. 41% apartments booked.
Work Description in Building Shree Bhairavnath HeightsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress55% done
55% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Dignity Realty And Housing
for Project
Dignity Bayview
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation