Project overview

Dhoot Adi Residency-Shree Adi House Chsl is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800008557. Dhoot Adi Residency-Shree Adi House Chsl is located at 938, 938/ 1 To 7. This is a Ongoing being developed by Dhoot Developers Pvt. Ltd..

Dhoot Adi Residency-Shree Adi House Chsl has 1 BHK, 2 BHK, 3 BHK & 4 BHK Apartments with carpet areas ranging from 1081 to 948 Sq.ft. Carpet. The Project has total 23 of which 1 are currently available for sale.

Dhoot Adi Residency-Shree Adi House Chsl is being developed on a total land area of 9527 Sq.ft. Dhoot Adi Residency-Shree Adi House Chsl has 1 Wings / Towers Shree Adi House Chsl

ProjectDeveloperLocationPossession
Godrej PrimeGodrej Redevelopers (Mumbai) Pvt. Ltd.Cts Nos.53/Pt And 52/Pt30-05-2023 00:00:00
Satra HarmonyRrb Realtors Pvt Ltd.831 -Pt31-12-2019 00:00:00
Runwal Forest Tower 1-4Wheelabrator Alloy Castings LimitedPt.596-598, 602/1-9, 606/1-83, 605/1-17, 607A607d596/1-6, 601-606, 599A/1-81, 607/1-3130-04-2022 00:00:00
Krishvi ResidencyShagun Chembur (Aop)176031-12-2019 00:00:00
Stella Sapphire B WingVaibhavlaxmi Builders And Developers51 Part31-12-2018 00:00:00
Little Malabar HillPardis Construction Llp267/1 And 267/2, Cts No 267 Part30-09-2020 00:00:00
Pure GoldSudhir Vasu Shetty119 And 119 131-03-2018 00:00:00
Tulsi ElanzaMetro Capital11A 11B S No 504 50331-12-2019 00:00:00
EdificeBuildproCts 302 Plot No 3431-12-2017 00:00:00
Godrej CentralGodrej Landmark Redevelopers Private LimitedCts 49/Pt, 5630-03-2021 00:00:00
PanoramaEkta Shubham VentureCts No 1746/2131-12-2019 00:00:00
Lucky Chs LtdDsd Infrastructure Pvt. Ltd.1417, 1417/1 To 631-03-2019 00:00:00
Central ParkShree Ganesh Enterprises552/1 To 9 /14-A, 55231-12-2019 00:00:00
Midas-Bhakti MeadowsIrene Edwyn Dmello4530-06-2019 00:00:00
Poonam EnclavePrakash PatelMumbai Suburban, 40007131-12-2015 00:00:00
Harvest MoonCalvin PropertiesCts No 1389 Plot No 460 Chembur31-12-2019 00:00:00
Shweta ChsAtharva DevelopersChembur Village, C T S No 56 Pt, Building No. 8 Of Sahakar Nagar -131-12-2018 00:00:00
Trishabh SignetDimension Housing Realty Llp129531-12-2019 00:00:00
Vishnubhuvan Chs LtdShree S S Developers Private Limited222Pt30-12-2022 00:00:00
Vandana ArtemisThree Towers Lifespace Llp54 Part30-12-2021 00:00:00
Building On Plot Bearing Cts No 833 Pt At Mhada Layout As Rna Continental Subhash Nagar Mumbai 71G A Builders Pvt Ltd.833 Pt At Mhada Layout As Rna Continental Subhash Nagar Chembur East Mumbai 40007131-01-2021 00:00:00
Vishwas ChsSiroya Yug Realtors400071, Mumbai Suburban15-08-2018 00:00:00
Marvel Gold - Phase ISwaroop Constructions Private Limited408 Part 408/1 To 3 412 Part 412/2 To 10 412/18 412/20 To 5430-12-2021 00:00:00
Rite SkyluxeRite Developers Pvt. Ltd.Cts No 831-Pt 831-59 To 7031-12-2018 00:00:00
Shree Saraswati Chsl Plot 8 ANav Durga Construction CompanyCts No 8 A31-12-2018 00:00:00
Skyline Sparkle Wing C Skyline Greathills39331-12-2019 00:00:00
Amrita PriveSkree Krishna PropertiesCts No. 1450, Plot No 532 Of Ss Ii30-06-2019 00:00:00
Ariso ApartmentKyraa Housing Projects828 Part/ 64 To 75, Cts No 828 Part30-12-2024 00:00:00
Amber EmpireAmber Capro Private Limited556 Part31-03-2019 00:00:00
Dev DarshanCity Estate Developers LimitedCts No 636, 636 1 To 16 & Cts No 634, 6341 To 2630-12-2022 00:00:00
Chembur Shri Sai Shraddha ChsUnity Land Consultancy116 Part31-12-2018 00:00:00
Shree DeeplaxamiPuro Constructions1332, 44631-12-2019 00:00:00
Shree Samarth Galaxy Sra Chs LtdShree S S Developers Private Limited222Pt Of Village Kanjur31-12-2018 00:00:00
Swiss BoulevardChaurang Associates49830-03-2022 00:00:00
Vardhan RoyaleVardhan AssociatesBeing At Pandit Solicitor Road, Malad East, Hissa No. 1 And Bearing Cts No 432, Lying, Survey No.32930-05-2024 00:00:00
StevelandCalvin PropertiesCts No 1580 1580/1 And 1580/2 Plot No 267 Chembur30-12-2021 00:00:00
Redevelopment Of Gkw Sankey Employees ChslHeritage Lifestyles & Developers Pvt. Ltd.EC.T.S. No. 424 C, Plot No.231-05-2019 00:00:00
SovenirSuncity CorporationMumbai Suburban, 40007831-08-2016 00:00:00
49 ElinaHuges Real Estates Developers Llp3531-12-2019 00:00:00
Vishnu ApolloThree Towers Lifespace Llp54 Part30-12-2021 00:00:00
Shree Shivsamarth ResidencyShree Shiv Samarth Developers89, 88/1 Pt, 88Pt, 87/1 To 431-12-2018 00:00:00
Vardhan HeightsVardhan Housing711, 710, 712/1 To 7, 709/1 To 11, 712, 711/1 To 14, 716 And Land Under Nilamutha Line, 710/1 To 23, Cts No 708 Pt, 715/1 To 3630-12-2022 00:00:00
Sai SansarConcrete Builders1274/1, Cts 1274, Plot No 42730-12-2023 00:00:00
Redevelopment Of Apsara Chs Ltd.Heritage Lifestyles & Developers Pvt.Ltd.973/1 To 9, Plot No.117, Cts Nos. 97331-12-2019 00:00:00
CelestialSu Sharda Edifice LlpCts No. 549A 549A/ 1 To 330-12-2024 00:00:00
AbhilashSanjona Builders400071, Mumbai Suburban30-12-2017 00:00:00
Veena SerenityVeena Realcon Private Limited58-Pt01-12-2021 00:00:00
LegranzEkta Shubham VenturePlot No. 5, Cts No. 11431-12-2018 00:00:00
OrionNivaan Infratech Private LimitedCts Nos. 471 47231-12-2017 00:00:00
Sabari HillgrangeSabari Developers LlpCts No 1531A Chembur Village31-05-2019 00:00:00
Meraki ArenaMeraki Habitats LlpCts No 667 619/21A And 21 B 619/14 619/15 Of Village Borla30-11-2020 00:00:00
VastukalpNhk Developers Llp431-D, Cts No. 43130-12-2025 00:00:00
Kukreja EstateSonu Realtors Private Limited165430-04-2023 00:00:00
Bhandup Citizen Chs LtdCastle Floors Pms Pvt LtdMumbai Suburban, 40007830-06-2021 00:00:00
LourdesVictor Homes Pvt Ltd40007130-12-2023 00:00:00
Sunshine OakwoodSunshine Housing Private LimitedCts No 403 C30-03-2024 00:00:00
Sai Ashish IiKukreja Construction CoCts No.411/A Of Village Bhanduo, Tal Mulund31-12-2017 00:00:00
Shree Parshwanath Sra Chs LtdChintamani Realtors40007830-12-2021 00:00:00
GeetanjaliKukreja Construction CoPlot No. 184. Ss Iii, M West Ward, 15Th Road, Village Chembur31-12-2017 00:00:00
Srishti SolitaireSiddhivinayak EnterpriseCts 242A - 242C31-12-2018 00:00:00
ChidakashYashvi Corporation1005,1005/1 To 631-12-2026 00:00:00
Lakshmi VaniTridhaatu Realty & Infra Pvt LimitedPlotno53 And 54Cts No 936 936-1 936-2 936-3 936-4 936-5 936-6 936-7 936-8 936-9 936-10 936-11 936 1230-04-2018 00:00:00
Sabari ShobhaSabari Developers LlpCts 1612, 1612-1 To 4 Chembur Village30-11-2020 00:00:00
Pearl BellezaChembur Hotels Private LimitedCts 91031-12-2018 00:00:00
Tridhaatu Bhaveshwar VilasTridhaatu Bhaveshwar Developers Llp17Th Road31-10-2018 00:00:00
Zen ApartmentsBholenath Developers Ltd.Plot No. 421 C.T.S. No. 1287/1287 1 To 631-03-2018 00:00:00
Vaibhav Chowk Sra Chs LtdSunil Mohan JoshiCts No 60 1-70 Bhandup Village30-12-2022 00:00:00
Parvati SadanMeena Builder Unit Of V N Raikar HufCts 94430-06-2021 00:00:00
Marvel Gold - Phase Ii - ColloseumSwaroop Constructions Private LimitedMumbai Suburban30-12-2022 00:00:00
Balaji Arcade Wing CShikhar DevelopersSurvey No 7 Hissa No.10 1321 Old Survey No31-12-2019 00:00:00
Redevelopment Of Sri Guruvayurappan Balmukund Co-Operative Housing Society Ltd.Smera Homes LlpPlot No. 472 And C.T.S. No. 1339, 1339/1 To 430-09-2024 00:00:00
Avighna Chs LtdMajestic Royale Developers139830-09-2024 00:00:00
Sai PradnyaDrushti RealtorsCts 20 Pt, Ndr 930-06-2018 00:00:00
Stella Sapphire A WingVaibhavlaxmi Builders And Developers51 Part31-12-2019 00:00:00
F. Residences Ghatkopar- Wing A And BArihant RealtorsCts 29 Pt31-07-2019 00:00:00
Simran HeightsVikas Narayan Raikar379, 378/1 To 3, 376, 377, 379/1, 375, , 376/1 To 3, 374, 380/1 To 3, 37824-09-2019 00:00:00
Anu-Smera CelesteAnusmera Realty & Infra Private Limited8411To8 And 842, Cts No 841, 8421To830-12-2021 00:00:00
Kismat ResidencyKismat Devlopers87/3/10Pt,85/930-12-2021 00:00:00
Amarjyoti Chs LtdMajestic Royale Developers1397/1 To 4, 139730-09-2024 00:00:00
Apoorva RiseApoorva Housing56 Part31-12-2024 00:00:00
Hubtown Seasons - I WingJoynest Premises Private LimitedCts No. 469-A30-12-2025 00:00:00
NakshatraMetro Developers Co.Cts No - 45730-03-2022 00:00:00
Hubtown Seasons - DaintreeJoynest Premises Private LimitedCts No.469-A30-12-2024 00:00:00
InsigniaTwo Taurus Realty Llp299/A Of Ss No Iii Of Chembur Cts No 160531-12-2026 00:00:00
Silicon Hofe B WingShilpriya Builders And DevelopersC.T.S. No. 34(Pt)31-07-2026 00:00:00
ElysiumKripa Elite HomesShop No 31 To 50, Known As Tilak Nagar Sai Siddhi Premises Co Op Soc Ltd, On Plot Bearing Cts No 45 (Pt)31-12-2027 00:00:00
Signature Business ParkSwastik Developers521 522 523 Pt 529 Pt30-12-2022 00:00:00
Amesh Chs LtdRight Channel Construction Pvt LtdMumbai Suburban, 40007130-06-2018 00:00:00
RajeswariShree Krishna Homes Pvt Ltd925/1 To 731-12-2017 00:00:00
Arham BrindavanMahavir EnterprisesCts No. 843, 843/1 To 731-12-2017 00:00:00
Suvidha SolitairePremier Infotech Pvt LtdMumbai Suburban, 40007131-12-2027 00:00:00
Hubtown Seasons - Ecuador CloudJoynest Premises Private LimitedCts No.469-A30-12-2024 00:00:00
Vighnaharta Sra Chs LtdParsn Construction And Developers Private LimitedCts 467 Part Village Chembur Tal Kurla30-12-2024 00:00:00
Trishabh Greens - Wing ARishabh Enterprises1675, 167730-12-2025 00:00:00
Neptune FlorenciaSachin M Deshmukh And Nayan A Bheda (Aop)Mumbai Suburban31-12-2018 00:00:00
Natekar HeightsSabari Developers LlpCts No 1270 Chembur31-05-2019 00:00:00
Arham AumMahavir Enterprises322/1031-12-2017 00:00:00
Ruparel OrionK D Lite Developers Pvt LtdCts No. 47030-12-2021 00:00:00
AeraRe Infra Pvt LtdPlot No 560 Cts No 146831-12-2018 00:00:00
Sai LeelaVriti Infrastructure Pvt. Ltd.Plot No 118-C, Cts No 296 Part And 296/3 And 296/431-12-2017 00:00:00
The Golf Boulevard Building - 1Empress & Adishakti JvC S No.172030-06-2022 00:00:00
Tridhaatu Shobha AayuTridhaatu Maruti Developers LlpMumbai Suburban, Pestom Sagar31-12-2017 00:00:00
Chaurang ShraddhaM/S. Chaurang Developers166931-12-2017 00:00:00
Trishabh Greens - Wing CRishabh Enterprises1677/1 To 4, 167530-06-2027 00:00:00
JadePriya ConstructionsCts No 29 Pt, 31 And 559 Pt30-06-2024 00:00:00
Sabari GayathriSabari Developers Llp1012, 1012 1 To 930-09-2024 00:00:00
Le JardinJay Construction India619, 619/1, 619/318-05-2018 00:00:00
Krishna NiwasShree Krishna Homes Pvt LtdPlot No 55731-12-2017 00:00:00
Shreenath DarshanShreenath Buildgrand Private LimitedMumbai Suburban, 40007831-12-2016 00:00:00
39 AntheaShreenathji Developers Pvt. Ltd,2431-03-2020 00:00:00
Hresa - Sainagar Apartment Pvt. Ltd.Bholenath Developers Ltd.1508/1, Plot No. 6, C.T.S. No. 150814-11-2022 00:00:00
Project Details
  • Project:
    Dhoot Adi Residency-Shree Adi House Chsl
  • Location:
  • 938, 938/ 1 To 7
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Dhoot Developers Pvt. Ltd.
  • Phone:
  • Address:
  • Dhoot Business Centre
Project RERA Details
MAHA REARA No: P51800008557
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Daisaria Associates
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession 31 Dec 2019
Litigations No Litigations
Last Modified 11 Sep 2018
Last Retrived 26 Jul 2025
Dhoot Adi Residency-Shree Adi House Chsl QR Code
Dhoot Adi Residency-Shree Adi House Chsl
MahaRERA - P51800008557
Apartment Details & Configuration
TypeArea
1 BHK42.14 Sq.mts. ( 454 Sq.ft. )
2 BHK57.86 Sq.mts. ( 623 Sq.ft. )
3 BHK74.79 Sq.mts. ( 805 Sq.ft. )
3 BHK75.84 Sq.mts. ( 816 Sq.ft. )
3 BHK88.05 Sq.mts. ( 948 Sq.ft. )
3 BHK100.44 Sq.mts. ( 1081 Sq.ft. )
4 BHK100.94 Sq.mts. ( 1087 Sq.ft. )
4 BHK121.24 Sq.mts. ( 1305 Sq.ft. )
4 BHK125.15 Sq.mts. ( 1347 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Dhoot Adi Residency-Shree Adi House Chsllast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Only Electric Meter And Sub Station Is Yet To Star
Energy management
Na
Fire Protection And Fire Safety Requirements
Yet To Start
Landscaping & Tree Planting
Only Tree Plantation Yet To Start
Open Parking
Will Be Done After Site Development
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Commence As And When Require
Solid Waste Management And Disposal
Na
Storm Water Drains
Yet To Start
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
It Will Be Constructed After Rcc Completion
Water Supply
Temp. Water Connection In Place
Buildings / Wings in Dhoot Adi Residency-Shree Adi House Chsl
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Dhoot Adi Residency-Shree Adi House Chsl by Dhoot Developers Pvt. Ltd.last updated on 26 Jul 2025 as per information obtained from MARA RERA.

9527 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

23 apartments in total
Total
23
Booked
22
Available
1

Saleable Area Statistics (Sq. ft.)

23750 Total
Total
23750
Booked
22445
Available
1305
Total 23 apartments in project. 22 apartments booked. 95% apartments booked.
Total 23750 Sq.ft. saleable area. 22445 saleable area booked.
95% area booked.

Shree Adi House Chsl

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shree Adi House ChslDec 20191310102518
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.14 Sq.mts. ( 454 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK57.86 Sq.mts. ( 623 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK74.79 Sq.mts. ( 805 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK75.84 Sq.mts. ( 816 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK88.05 Sq.mts. ( 948 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHK100.44 Sq.mts. ( 1081 Sq.ft. )5
5 Booked100% Booked
100% Booked
4 BHK100.94 Sq.mts. ( 1087 Sq.ft. )4
4 Booked100% Booked
100% Booked
4 BHK121.24 Sq.mts. ( 1305 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK125.15 Sq.mts. ( 1347 Sq.ft. )4
4 Booked100% Booked
100% Booked
23 total apartments / 22 apartments booked. 95% apartments booked.
Work Description in Building Shree Adi House ChslCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
work-in-progress80% done
80% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress36% done
36% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked
Channel Partners
Channel Partners Registered by Developer
Dhoot Developers Pvt. Ltd.
for Project
Dhoot Adi Residency-Shree Adi House Chsl
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation