Project overview

Dharti-4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000046457. Dharti-4 is located at 411/D/1 (Old 411/C/1). This is a New being developed by Dhartidhan Developers.

Dharti-4 has 2 BHK Apartments with carpet areas ranging from 760 to 760 Sq.ft. Carpet. The Project has total 88 of which 53 are currently available for sale.

Dharti-4 is being developed on a total land area of 11087 Sq.ft. Dharti-4 has 1 Wings / Towers Dharti-4

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Dharti-4
  • Location:
  • 411/D/1 (Old 411/C/1)
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Dhartidhan Developers
  • Phone:
  • Address:
  • Arihant Cooperative Hsg Scty
Project RERA Details
MAHA REARA No: P99000046457
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank AXIS BANK
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 08 Mar 2025
Last Retrived 28 Jul 2025
Dharti-4 QR Code
Dharti-4
MahaRERA - P99000046457
Apartment Details & Configuration
TypeArea
2 BHK70.61 Sq.mts. ( 760 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Dharti-4last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Approved Plan
Energy management
Na
Fire Protection And Fire Safety Requirements25% completed
25% Complete
As Per Fire Noc Given By Vvmc
Landscaping & Tree Planting
As Per Tree Noc Given By Vvmc
Open Parking
As Per Approved Plan
Sewerage (Chamber, Lines, Septic Tank , STP)55% completed
55% Complete
As Per Approved Plan
Solid Waste Management And Disposal
Na
Storm Water Drains70% completed
70% Complete
As Per Approved Plan
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting50% completed
50% Complete
As Per Approved Plan
Water Supply
Facility Will Start Once Vvmc Watersupply Commence
Buildings / Wings in Dharti-4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Dharti-4 by Dhartidhan Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

11087 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

88 apartments in total
Total
88
Booked
35
Available
53

Saleable Area Statistics (Sq. ft.)

66884 Total
Total
66884
Booked
26602
Available
40282
Total 88 apartments in project. 35 apartments booked. 39% apartments booked.
Total 66884 Sq.ft. saleable area. 26602 saleable area booked.
40% area booked.

Dharti-4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Dharti-4Dec 20262200106963
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK70.61 Sq.mts. ( 760 Sq.ft. )88
35 Booked39% Booked
39% Booked
88 total apartments / 35 apartments booked. 39% apartments booked.
Work Description in Building Dharti-4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress35% done
35% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress96% done
96% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Dhartidhan Developers
for Project
Dharti-4
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation