Project overview

Deepali Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700018470. Deepali Residency is located at Survey No 84 Hissa No 1 Kharvai. This is a New being developed by Parekh Infraprojects.

Deepali Residency has 1 BHK & 2 BHK Apartments with carpet areas ranging from 327 to 374 Sq.ft. Carpet. The Project has total 129 of which 129 are currently available for sale.

Deepali Residency is being developed on a total land area of 41872 Sq.ft. Deepali Residency has 5 Wings / Towers Wing - A,Wing - B,Wing - C,Wing - D,Wing - E

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Deepali Residency
  • Location:
  • Survey No 84 Hissa No 1 Kharvai
  • Const. Stage:
    New
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Parekh Infraprojects
  • Phone:
  • Address:
  • Aakash Chambers
Project RERA Details
MAHA REARA No: P51700018470
Project Type Others
RERA Project Status New
Architect Architects Inc
Funding Bank THE KALYAN JANATA SAHAKARI BANK LTD.
Proposed Possession 30 Dec 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 02 Nov 2018
Last Retrived 26 Jul 2025
Deepali Residency QR Code
Deepali Residency
MahaRERA - P51700018470
Apartment Details & Configuration
TypeArea
1 BHK30.03 Sq.mts. ( 323 Sq.ft. )
1 BHK30.71 Sq.mts. ( 331 Sq.ft. )
1 BHK30.82 Sq.mts. ( 332 Sq.ft. )
1 BHK31.55 Sq.mts. ( 340 Sq.ft. )
1 BHK31.57 Sq.mts. ( 340 Sq.ft. )
1 BHK32.21 Sq.mts. ( 347 Sq.ft. )
1 BHK32.84 Sq.mts. ( 353 Sq.ft. )
1 BHK32.89 Sq.mts. ( 354 Sq.ft. )
1 BHK32.9 Sq.mts. ( 354 Sq.ft. )
1 BHK32.92 Sq.mts. ( 354 Sq.ft. )
1 BHK33.02 Sq.mts. ( 355 Sq.ft. )
1 RK22.7 Sq.mts. ( 244 Sq.ft. )
2 BHK39.07 Sq.mts. ( 421 Sq.ft. )
2 BHK39.25 Sq.mts. ( 422 Sq.ft. )
SHOP4.99 Sq.mts. ( 54 Sq.ft. )
SHOP6.04 Sq.mts. ( 65 Sq.ft. )
SHOP9.27 Sq.mts. ( 100 Sq.ft. )
SHOP9.58 Sq.mts. ( 103 Sq.ft. )
SHOP9.99 Sq.mts. ( 108 Sq.ft. )
SHOP12.02 Sq.mts. ( 129 Sq.ft. )
1 BHK30.65 Sq.mts. ( 330 Sq.ft. )
1 BHK31.94 Sq.mts. ( 344 Sq.ft. )
1 BHK32.17 Sq.mts. ( 346 Sq.ft. )
1 BHK32.56 Sq.mts. ( 350 Sq.ft. )
1 BHK32.85 Sq.mts. ( 354 Sq.ft. )
1 RK20.14 Sq.mts. ( 217 Sq.ft. )
2 BHK39.1 Sq.mts. ( 421 Sq.ft. )
2 BHK42.57 Sq.mts. ( 458 Sq.ft. )
SHOP8.48 Sq.mts. ( 91 Sq.ft. )
SHOP9.72 Sq.mts. ( 105 Sq.ft. )
SHOP10.12 Sq.mts. ( 109 Sq.ft. )
SHOP10.31 Sq.mts. ( 111 Sq.ft. )
SHOP10.53 Sq.mts. ( 113 Sq.ft. )
SHOP12.56 Sq.mts. ( 135 Sq.ft. )
SHOP15.15 Sq.mts. ( 163 Sq.ft. )
1 BHK30.15 Sq.mts. ( 325 Sq.ft. )
1 BHK30.96 Sq.mts. ( 333 Sq.ft. )
1 BHK31.11 Sq.mts. ( 335 Sq.ft. )
1 BHK31.44 Sq.mts. ( 338 Sq.ft. )
1 BHK32.33 Sq.mts. ( 348 Sq.ft. )
1 BHK32.71 Sq.mts. ( 352 Sq.ft. )
1 BHK33.76 Sq.mts. ( 363 Sq.ft. )
1 BHK34.17 Sq.mts. ( 368 Sq.ft. )
1 BHK34.22 Sq.mts. ( 368 Sq.ft. )
2 BHK34.71 Sq.mts. ( 374 Sq.ft. )
2 BHK34.74 Sq.mts. ( 374 Sq.ft. )
1 BHK30.41 Sq.mts. ( 327 Sq.ft. )
1 BHK30.76 Sq.mts. ( 331 Sq.ft. )
1 BHK30.95 Sq.mts. ( 333 Sq.ft. )
1 BHK30.97 Sq.mts. ( 333 Sq.ft. )
1 BHK31.3 Sq.mts. ( 337 Sq.ft. )
1 BHK31.32 Sq.mts. ( 337 Sq.ft. )
1 BHK32.26 Sq.mts. ( 347 Sq.ft. )
1 BHK33.18 Sq.mts. ( 357 Sq.ft. )
1 BHK33.21 Sq.mts. ( 357 Sq.ft. )
2 BHK35.9 Sq.mts. ( 386 Sq.ft. )
2 BHK36.84 Sq.mts. ( 397 Sq.ft. )
2 BHK36.86 Sq.mts. ( 397 Sq.ft. )
1 BHK30.36 Sq.mts. ( 327 Sq.ft. )
1 BHK31.19 Sq.mts. ( 336 Sq.ft. )
1 BHK33.59 Sq.mts. ( 362 Sq.ft. )
1 BHK33.71 Sq.mts. ( 363 Sq.ft. )
1 BHK33.77 Sq.mts. ( 364 Sq.ft. )
1 BHK34.35 Sq.mts. ( 370 Sq.ft. )
1 BHK34.38 Sq.mts. ( 370 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Deepali Residencylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
-
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
-
Energy management
-
Fire Protection And Fire Safety Requirements
-
Landscaping & Tree Planting
-
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Municipal Sewar Line
Solid Waste Management And Disposal
Segregation At Source
Storm Water Drains
-
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Disposal By Municipality
Water Supply
Water Pipeline By M.J.P
Buildings / Wings in Deepali Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Deepali Residency by Parekh Infraprojectslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

41872 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

129 apartments in total
Total
129
Booked
0
Available
129

Saleable Area Statistics (Sq. ft.)

42146 Total
Total
42146
Booked
0
Available
42146
Total 129 apartments in project. 0 apartments booked. 0% apartments booked.
Total 42146 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Wing - A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - ADec 20215101061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.03 Sq.mts. ( 323 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30.71 Sq.mts. ( 331 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK30.82 Sq.mts. ( 332 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK31.55 Sq.mts. ( 340 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK31.57 Sq.mts. ( 340 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK32.21 Sq.mts. ( 347 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK32.84 Sq.mts. ( 353 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK32.89 Sq.mts. ( 354 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK32.9 Sq.mts. ( 354 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK32.92 Sq.mts. ( 354 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK33.02 Sq.mts. ( 355 Sq.ft. )1
None Booked0% Booked
0% Booked
1 RK22.7 Sq.mts. ( 244 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK39.07 Sq.mts. ( 421 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK39.25 Sq.mts. ( 422 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP4.99 Sq.mts. ( 54 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP6.04 Sq.mts. ( 65 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP9.27 Sq.mts. ( 100 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP9.58 Sq.mts. ( 103 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP9.99 Sq.mts. ( 108 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP12.02 Sq.mts. ( 129 Sq.ft. )1
None Booked0% Booked
0% Booked
34 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing - ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing - B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - BDec 20215101041
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.03 Sq.mts. ( 323 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30.65 Sq.mts. ( 330 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30.71 Sq.mts. ( 331 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30.82 Sq.mts. ( 332 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK31.57 Sq.mts. ( 340 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK31.94 Sq.mts. ( 344 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK32.17 Sq.mts. ( 346 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK32.56 Sq.mts. ( 350 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK32.85 Sq.mts. ( 354 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK32.92 Sq.mts. ( 354 Sq.ft. )4
None Booked0% Booked
0% Booked
1 RK20.14 Sq.mts. ( 217 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK39.1 Sq.mts. ( 421 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK42.57 Sq.mts. ( 458 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP8.48 Sq.mts. ( 91 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP9.72 Sq.mts. ( 105 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP10.12 Sq.mts. ( 109 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP10.31 Sq.mts. ( 111 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP10.53 Sq.mts. ( 113 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP12.56 Sq.mts. ( 135 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15.15 Sq.mts. ( 163 Sq.ft. )1
None Booked0% Booked
0% Booked
35 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing - BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing - C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - CDec 20215101041
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.15 Sq.mts. ( 325 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30.96 Sq.mts. ( 333 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK31.11 Sq.mts. ( 335 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK31.44 Sq.mts. ( 338 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK32.33 Sq.mts. ( 348 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK32.71 Sq.mts. ( 352 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK33.76 Sq.mts. ( 363 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.17 Sq.mts. ( 368 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK34.22 Sq.mts. ( 368 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK34.71 Sq.mts. ( 374 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK34.74 Sq.mts. ( 374 Sq.ft. )2
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing - CCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing - D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - DDec 20215101061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.41 Sq.mts. ( 327 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30.76 Sq.mts. ( 331 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30.95 Sq.mts. ( 333 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK30.97 Sq.mts. ( 333 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK31.3 Sq.mts. ( 337 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK31.32 Sq.mts. ( 337 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK32.26 Sq.mts. ( 347 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK33.18 Sq.mts. ( 357 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK33.21 Sq.mts. ( 357 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK35.9 Sq.mts. ( 386 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK36.84 Sq.mts. ( 397 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK36.86 Sq.mts. ( 397 Sq.ft. )2
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing - DCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing - E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - EDec 20216101061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.36 Sq.mts. ( 327 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK31.19 Sq.mts. ( 336 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK33.59 Sq.mts. ( 362 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK33.71 Sq.mts. ( 363 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK33.77 Sq.mts. ( 364 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK34.35 Sq.mts. ( 370 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.38 Sq.mts. ( 370 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK34.74 Sq.mts. ( 374 Sq.ft. )4
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing - ECompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Parekh Infraprojects
for Project
Deepali Residency
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation