Project overview

Deep Paradise is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700016499. Deep Paradise is located at Survey No 43 Hissa No 4 P. This is a New being developed by M/S D S Realtors.

Deep Paradise has 1 BHK & 1 RK Apartments with carpet areas ranging from 239 to 330 Sq.ft. Carpet. The Project has total 66 of which 54 are currently available for sale.

Deep Paradise is being developed on a total land area of 21743 Sq.ft. Deep Paradise has 3 Wings / Towers Wing A,Wing B,Wing C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Deep Paradise
  • Location:
  • Survey No 43 Hissa No 4 P
  • Const. Stage:
    New
  • Possession:
    30 Sep 2021
Developer Details

  • Developer:
    M/S D S Realtors
  • Phone:
  • Address:
  • Raj Hans Apartment
Project RERA Details
MAHA REARA No: P51700016499
Project Type Residential / Group Housing
RERA Project Status New
Architect Urban Vastu Designer
Funding Bank THE KALYAN JANATA SAHAKARI BANK LTD.
Proposed Possession 30 Sep 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 27 Jun 2023
Last Retrived 26 Jul 2025
Deep Paradise QR Code
Deep Paradise
MahaRERA - P51700016499
Apartment Details & Configuration
TypeArea
1 BHK27.55 Sq.mts. ( 297 Sq.ft. )
1 BHK29.95 Sq.mts. ( 322 Sq.ft. )
1 BHK30.39 Sq.mts. ( 327 Sq.ft. )
1 BHK30.43 Sq.mts. ( 328 Sq.ft. )
1 BHK30.69 Sq.mts. ( 330 Sq.ft. )
1 RK22.2 Sq.mts. ( 239 Sq.ft. )
1 BHK27.53 Sq.mts. ( 296 Sq.ft. )
1 BHK30.41 Sq.mts. ( 327 Sq.ft. )
1 BHK27.26 Sq.mts. ( 293 Sq.ft. )
1 BHK29.66 Sq.mts. ( 319 Sq.ft. )
1 BHK29.8 Sq.mts. ( 321 Sq.ft. )
1 BHK29.98 Sq.mts. ( 323 Sq.ft. )
1 BHK30.26 Sq.mts. ( 326 Sq.ft. )
1 BHK30.5 Sq.mts. ( 328 Sq.ft. )
1 BHK30.57 Sq.mts. ( 329 Sq.ft. )
1 BHK30.68 Sq.mts. ( 330 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Deep Paradiselast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Cover Parking
9 Car Parking
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
-
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
-
Water Supply
Na
Buildings / Wings in Deep Paradise
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Deep Paradise by M/S D S Realtorslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

21743 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

66 apartments in total
Total
66
Booked
12
Available
54

Saleable Area Statistics (Sq. ft.)

20959 Total
Total
20959
Booked
3913
Available
17046
Total 66 apartments in project. 12 apartments booked. 18% apartments booked.
Total 20959 Sq.ft. saleable area. 3913 saleable area booked.
19% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AMar 20215101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.55 Sq.mts. ( 297 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK29.95 Sq.mts. ( 322 Sq.ft. )8
3 Booked37% Booked
37% Booked
1 BHK30.39 Sq.mts. ( 327 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK30.43 Sq.mts. ( 328 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK30.69 Sq.mts. ( 330 Sq.ft. )2
None Booked0% Booked
0% Booked
1 RK22.2 Sq.mts. ( 239 Sq.ft. )1
None Booked0% Booked
0% Booked
19 total apartments / 6 apartments booked. 31% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BMar 20215101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.53 Sq.mts. ( 296 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK30.41 Sq.mts. ( 327 Sq.ft. )12
1 BHK30.69 Sq.mts. ( 330 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK22.2 Sq.mts. ( 239 Sq.ft. )1
None Booked0% Booked
0% Booked
19 total apartments / 2 apartments booked. 10% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress48% done
48% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CMar 20215101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.26 Sq.mts. ( 293 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK27.53 Sq.mts. ( 296 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK29.66 Sq.mts. ( 319 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK29.8 Sq.mts. ( 321 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK29.98 Sq.mts. ( 323 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK30.26 Sq.mts. ( 326 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK30.41 Sq.mts. ( 327 Sq.ft. )12
4 Booked33% Booked
33% Booked
1 BHK30.5 Sq.mts. ( 328 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30.57 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30.68 Sq.mts. ( 330 Sq.ft. )1
None Booked0% Booked
0% Booked
1 RK22.2 Sq.mts. ( 239 Sq.ft. )1
None Booked0% Booked
0% Booked
28 total apartments / 4 apartments booked. 14% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
M/S D S Realtors
for Project
Deep Paradise
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation