Project overview

Deep Divine-4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000018422. Deep Divine-4 is located at Plot No 4. This is a New being developed by Sambhav Arena Llp.

Deep Divine-4 has 1 BHK & 1 RK TERRACE Apartments with carpet areas ranging from 162 to 269 Sq.ft. Carpet. The Project has total 13 of which 0 are currently available for sale.

Deep Divine-4 is being developed on a total land area of 2368 Sq.ft. Deep Divine-4 has 1 Wings / Towers Deep Divine-4

ProjectDeveloperLocationPossession
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Shivaay AvyaanShreeram BuildconNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
Shubh Mangalam Phase IiShubh RealitySr No 106 Hissa No 125-12-2026 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Priyal AumShree Mauli Chs LtdPlot No 47 Sector 2601-06-2024 00:00:00
Sai CityOm Sai Builders & DevelopersSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
Marathon Nextown JasperMarathon Ener-Gen140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanS No 112/130-06-2024 00:00:00
Siyara Fortune Building A Wing BShakti Realty8145, 8146, 8153, 8172, 8176 To 820231-12-2027 00:00:00
Satyaneelayam Co Op Hsg SocietyYash Infra749 B31-12-2025 00:00:00
Thanekar CivicShree Swami Samarth EnterprisesS No 133, H No 209-04-2024 00:00:00
Saurabh ResidencyM/S Krishna Builders & DevelopersS No 77 , H No 2/1730-06-2024 00:00:00
Ved ParadiseKulkarni And Associates896631-12-2024 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Dashmesh ParkSatyam ConstructionsCts No 2340931-03-2023 00:00:00
Shankeshwar DarshanKalpvriksh Homes LlpOld Sno 559 New Sno 207 Hno 1,2 Old Sno 560 New Snio 165 Hno 1Pt31-12-2024 00:00:00
Eknath Heights - 1Omkar EnterprisesSurvey No 123 Hissa No 331-12-2022 00:00:00
Aai Mauli ParkHendar Laxman MhatreS. No. 1731-12-2025 00:00:00
Shubham Monolith D WingGaurivinayak Builders And Developers Pvt LtdSurvey No 30 Hissa No 15A31-12-2026 00:00:00
Godrej Ascend Phase 3Godrej Properties Limited39 Part, 41/1 Part31-10-2029 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
SambhaviShree Vakratunda DevelopersSurvey No 531-10-2024 00:00:00
Shree Mangal Narayan ResidencyN V ConstructionCts 9721 To973431-12-2023 00:00:00
Vakratunda HomesNarayan Sunil RanePlot No 4,S .No 108, Hissa No 131-12-2023 00:00:00
Chandrakant ResidencyAmogh ConstructionC.T.S No- 2 To 8 & C.T.S No- 169 To 178, C.T.S No- 295 To 30031-12-2027 00:00:00
Daisy Gardens Building No.13Ankita BuildersSurvey No 9, Hissa No 2A30-06-2026 00:00:00
Madhusudan Retreat TerracesMadhusudan Leisure HomesSurvey No 5031-12-2026 00:00:00
Jay ResidencyMukesh Vithal GiteS.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
Seven HeightsOvais Mudabbir BardiS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino AMacrotech Developers Limited62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
Panvelkar EmpireOm Sai Shraddha DevelopersSurvey No. 30/4 (P)30-06-2026 00:00:00
Om Sai One ParkInfini DevelopersCts 133/3 133/4 134/3 134/5 134/9 134/10 134/11 134/4/A 138/13/A 138/13/B 138/13/C31-12-2028 00:00:00
Upper Thane-Iris Wing AMacrotech Developers Limited293/1 And 293/331-12-2027 00:00:00
Jivdani BuildingMildstone Enterprises Llp133231-12-2024 00:00:00
Yashraj HeightsVikrant Vikas Raikar731-01-2025 00:00:00
Belvedere-B And CMacrotech Developers Limited212/7A Part 212/7B Part 212/7C Part 212/7D Part 212/7E Part 25/2A(Part) 25/2B(Part) 25/4(Part)30-11-2027 00:00:00
Sai Dream OneGls InfrastructuresS No.88, H No 6 & 731-12-2025 00:00:00
Neelkanth Palm AvenueNeelkanth InfratechPlot No-23 & 24, Sector-09 Ghansoli29-12-2029 00:00:00
Vardhaman Tower Building Nos. 6 & 7Vardhaman Property DevelopersPlot Bearing Surveyno.26Hissa No1(Part)31-12-2023 00:00:00
Zircon HeightsIqbal Abdul Rauf Punjabi59/1, 83/5 Paiki, Cts No 482931-12-2024 00:00:00
Hemant Shishir Co.Op HsgNarendra Kalyanji Patel3512-352131-12-2023 00:00:00
Fortune EmporioQuanta Realty LlpCts No 4090 To 4096,4166 To 4171,4240,4241 New Sno 37 Hno 3C31-12-2025 00:00:00
The Valaji EstateFore Holdings4065,4093-4097,4099-410205-07-2024 00:00:00
Kapleshwara ResidencyKapleshwara Homes Llp119/6C (Old), 84/6C (New)31-12-2029 00:00:00
Sara TowerHope Builders And Developers233 And 23431-12-2026 00:00:00
Vedang Lake CityVedang ConstructionS. No. 4 H. No. 2/1 And S. No. 12 H. No 1/331-12-2025 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Plot No -1A,Sector -19, Vashi Truck TerminalCity And Industrial Development Corporation Of Maharashtra LimitedPlot No -1A31-12-2025 00:00:00
Jp HarmonyJp Corp Developers (India) Llp12931-12-2023 00:00:00
Deep Royal ResidencyM/S. Deepali Infracon LlpSurvey No.80 Hissa No.231-12-2023 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
Building No 1 PadmavatiM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
Swanand TarangM/S Omkar RealtorsSurvey No 43 Hissa No 230-12-2021 00:00:00
Vrundavan DhamShikhar LifespacesS.No 13, H No. 1 P31-12-2023 00:00:00
Riverwood Park Building No -3Shree Khidkaleshwar Property Developers Pvt. Ltd.26/2, 26/3 All In Parts30-06-2026 00:00:00
Vishwajeet Empire NxGulabrao Baburao Karanjule PatilSurvey No 39 Hissa No 2A, Hissa No 2B, Hissa No 2C And Hissa No 2D23-06-2026 00:00:00
Building No 2 Mahalakshmi A WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Jhalak Luxuria Phase IJhalak ConstructionsGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
Anantam - Phase IOyster Living Llp13/230-06-2022 00:00:00
Building No 2 Mahalakshmi B WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Fenkin EmpireFen-Kin Realtors & Project Pvt LtdCts No 313 And 314B31-07-2023 00:00:00
Sai PearlM/S Mitra RealityS No 67 H No 331-12-2025 00:00:00
Baradia EkdantBaradia RealtyCts No 259,26022-07-2026 00:00:00
Rock Mount ResidencyBuilt Charms46/6/A 46/1/A/5 46/1/A/3/4/6 47/2/A30-06-2026 00:00:00
Chandrabhaga HeightsJai Santoshi Mata Construction Builders And DevelopersS. No. 15731-07-2024 00:00:00
Ekatva SignetBhoomi DevelopersTikka No.15 Cts No.39/A/1/B Pt31-12-2023 00:00:00
Amruta ChsUtkarsha Construction7462/70/2403-06-2022 00:00:00
Sai Shrushti SapphireSai Shrushti Enterprises136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
Manovi PrithviManovi PrithviS. No. 217 H. No.3/H Plot No. 731-05-2024 00:00:00
Sarvoday SymphonySwastik RealtorsSurvey No 91 Old 25New Hissa No 1 Survey 92 Old 3 New Hissa No 330-06-2026 00:00:00
PitrukrupaMellennium RealtyOld Survey No 326/A New Survey No 229/Part Plot No 33 Cts No 680 And68131-03-2023 00:00:00
Joshi ArcadeMeera DevelopersSurvey No 34-1/12, Hissa No. 3, Plot No. 731-03-2026 00:00:00
Sai Narayana ResidencyMm Landmark Realty LlpS.No.1431-12-2025 00:00:00
Tulsi AagmanRaj GroupS No 36 H No-1,2,3 S No-37 H No-1 S No-40 H No-530-04-2025 00:00:00
Raheja Solaris-1Raheja Universal (Pvt.) Ltd.Gen-2/1/B30-12-2026 00:00:00
Shree Vighneshwar HeightsMahesh Shyamsundar Goyal114/5/3/3,115/1,115/231-03-2027 00:00:00
Om Tanishq ResidencyM/S Laxmi RealtySurvey No 4, Hissa No 1A/230-03-2022 00:00:00
Amakin Mohammediyah Phase 3Amakin Mohammediyah Private Limited31/6 And 730-12-2024 00:00:00
Anantam - Phase IiOyster Living Llp18/1230-06-2022 00:00:00
Runwal Gardens Phase 4 Bldg No. 33-34Runwal Residency Private LimitedSurvey Nos 4/5Pt, 5/1Pt, 5/2Pt, 5/3Pt, 5/4Pt, 5/5Pt30-06-2025 00:00:00
Sahara ResidencySahara ResidencySurvey No 20 Hissa No 931-12-2024 00:00:00
Riverview Classic Building No 4, Phase IvRutu BuildersS No 27, H No 5, 3/3 S No 28/ H. No 1,2,3,4/1,4/2,4/330-12-2022 00:00:00
Olivia PrimeSkyline Buildpro43/2B/3/230-06-2022 00:00:00
Rai S AaragyaRai Residency Private LimitedSurvey No 46 Hissa No 5 And 730-12-2026 00:00:00
Shree Ram Co Operative Housing Society LimitedSantosh Vasant ChitnisS No 704/2 706/6 Old , 286/2 294/6 Cts No 821 And 82231-03-2025 00:00:00
Yashshree Co.Op.Hsg.SocNitant Narendra DesaiSurvey No. 28, Hissa No. 3/2/K30-09-2025 00:00:00
Vaishnavi HightsVaishnavi Builders & Developers58,H No.1 P.No. 1 & 224-06-2024 00:00:00
Neelkanth Palm PresidentNeelkanth InfratechPlot No 10 Sectot 11 Ghansoli31-12-2029 00:00:00
Garden Estate Phase -IiShree Balaji DevelopersSurvey No. 46, Hissa No. 12/131-03-2025 00:00:00
Parvati NiwasAadarsh DevelopersCst No 27/1B, 27/1C Tikka No 2231-12-2025 00:00:00
Rajoba SolitaireM/S. Gangadhar Associates58B/1A, Sector Ii, Tikka No. 2 Village Thane30-06-2026 00:00:00
Shree Gajanan Enterprises Rukhmini ChsShree Gajanan Enterprises Rukhmini ChsPlot No. 331-07-2026 00:00:00
Dosti West County - Phase 5 - Dosti Olive - Wing ADosti EnterprisesSurvey No 16/10/A/1(Pt), 16/9/A(Pt), 16/8/A(Pt)30-09-2028 00:00:00
Ganesh Villa ChslBhavani EnterprisesSurvey No 7A/4/A/330-06-2026 00:00:00
Mukund VishnuShree Swami Samartha AssociatesTika No 12 Cst No 103A 2A 103A 2B Village Pachpakhadi30-12-2021 00:00:00
Anjani SparshGeeta Space Realtors249-2, 249-730-12-2020 00:00:00
Mohan Nano Estates IiiMohan Lifespaces Llp24/1,24/2P,24/6P,24/8,24/9,25/1,25/231-12-2019 00:00:00
Building No. 2 Wings A And B AlpineSd Corporation Private Limited840 A/130-12-2020 00:00:00
PrathamRoodraksh Probuilder And Infracon Private LimitedCts 284B 284D31-12-2019 00:00:00
Silver SpringAnudan Properties Private LimitedF. P.4330-12-2022 00:00:00
Crystal HeightsNirala Construction424B, 425, 416B, 421/1 To 3, 421, 417/1 To 430-12-2021 00:00:00
Nirmaan HeightsChaitanya DevelopersCts 233A, 234B And Benefits Of Plots Under Set Back/Road Widening Bearing Cts 234C And 234D Borivali09-03-2022 00:00:00
ZenR A ConstructionCts No 2086430-06-2024 00:00:00
Navrang Co Op Hsg SocietyYadav Bros ConstructionPlot No. 3, Gut No 5431-12-2024 00:00:00
Prathamesh ChslNirmal DevelopersSurvey No 26 Hissa No 2A Plot No 3 (Old Plot No.18)31-12-2024 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
S.S. ResidencyAl Siraj Construction10631-12-2025 00:00:00
Sunteck Forestworld 3Sunteck Realty Holdings Pvt Ltd311Pt31-12-2026 00:00:00
Swanand Bliss Phase - IiM/S Nityanand RealtorsSurvey No. 58 Hissa No. 4/330-06-2025 00:00:00
Fatima Enclave- C WingRais Aziz Qureshi46/4 , 46/531-12-2025 00:00:00
Shree Prabhucharan Chs.LtdShree Prabhucharan Co-Op Housing Society66/5/6731-03-2024 00:00:00
Aastha OmkarAastha RealtorsS. No. 56, H. No. 35/D/2B/1 To 35/D/2B/14 And H. No. 35/D/2B/15/131-12-2026 00:00:00
Rai S VrundavanRai Residency Private LimitedSurvey No 64 Hissa No 230-12-2023 00:00:00
Takshila ResidencyDelux AssociatesS No 157/13Pt S No 158/1Pt Plot No 1 And 230-12-2023 00:00:00
Om RamchandraLaxmi DevelopersGaothan Chalata No 109 House No 38030-11-2020 00:00:00
Sajan Shantaram HeightTirupati DevelopersNew Survey No.1 Hissa No 1130-06-2021 00:00:00
Ram JanakiShree Ganesh Enterprises4947 To 495230-12-2026 00:00:00
Apple ParadiseApple ParadiseU No 99,100, Plot No 262 Part01-01-2019 00:00:00
Shubham ResidencyShubham RealtyPlot No 79,Sector 2130-06-2025 00:00:00
Shree Mahalaxmi ResidencyShree Gajanan Builders And DevelopersS No 93 / H No A, S No 9431-07-2028 00:00:00
Thane ProjectMacrotech Developers Limited144/1 Part31-07-2029 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
GlenmarkMandar Construction (Mukund Balu Keni Huf)66/131-03-2022 00:00:00
Sunteck Forestworld 2Sunteck Realty Holdings Pvt Ltd309Pt30-06-2026 00:00:00
Magnus PrideMagnus BuildersS No. 69, H No. 10 And S No. 70, H No. 131-03-2024 00:00:00
Pride Of UttanBrickscity Developers Private LimitedSurvey No 117 Hissa No 327-05-2022 00:00:00
Vedant Millenia Happiness Phase Ii Wing BMohan Hardasmal TharwaniS No 221 3 1 P S No 221 3 2 P S No 221 4 P S No 221 6 A P31-08-2025 00:00:00
Omkar AvenueOmkar RealtorsCts No. 761 (Old Survey No.87/11 Plot No.11)31-03-2028 00:00:00
Century TwoCity InfraPlot No 22,Sector-0931-03-2028 00:00:00
Pokhriyal ParamountPokhriyal And AssociatesSurvey No. 127, Plot No. D31-12-2028 00:00:00
Mavis Tower A Wing From 5Th Floor To 7Th FloorM/S. Unit Arsen Developers (Joint Venture)431C Part31-12-2019 00:00:00
Infinite ResidencyMistry Construction Co. Pvt. Ltd.Pocket D And E30-06-2029 00:00:00
Mansipooja HeightS K InfrastructureSurvey No 3 Hissa No 630-03-2023 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Seasons ParkShree Balaji HomesS No 49 H No 4/A, 4/B,6/D30-12-2022 00:00:00
Amrut SiddhiJayshree Builders40/2 40/3 40/4 40/5A 40/6 40/7 41/3 41/4A 41/4B 41/4C30-12-2023 00:00:00
Precious Galaxy Wing BMahashar Mata Builders & DevelopersS.No. 38/C/1 Final Plot No. 131-05-2024 00:00:00
Muktai Mauli ChsYadav Bros ConstructionS No 55/25 Cts 917131-12-2023 00:00:00
Priti PlazaMahalaxmi ConstructionS No 70 H No 4 P30-09-2024 00:00:00
Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1Adrika Developers Private LimitedS. No. 156/1(Pt), 156/2(Pt), 157/1(Pt), 157/2(Pt), 159/1A(Pt), 159/1B(Pt), 159/1C(Pt)31-10-2028 00:00:00
Neelkanth Heights ChsShree Neelkanth DevelopersSurvey No 14 Hissa No 1 & 6 Plot No 4, 3 & 631-03-2026 00:00:00
Vaibhav HorizonVaibhav Siddhi Construction Co.563 4 Pt/4 Pt/4 Pt24-09-2023 00:00:00
Aramus ResidencyAramus Realty Llp34A30-12-2023 00:00:00
Palava Florea - A To DPalava Dwellers Private Limited61 Pt 62 Pt Village Khoni31-07-2023 00:00:00
Vishwajeet Precious Phase IiAbhijeet PrideS No 32 S No 33/1 Part S No 30/12 A,B Part16-05-2026 00:00:00
Sunteck Forestworld 4Sunteck Realty Holdings Pvt Ltd287 Part, 315 Part31-12-2026 00:00:00
Mandar ArcadeGaondevi DevelopersSurvey No.49/H.No.21/Plot No.7B31-01-2024 00:00:00
Antalica TowersAntalica TowersSurvey No 22 H No 9/A30-10-2024 00:00:00
DattaviharSharda Vastu Nirmitee Pvt. Ltd.Tika No. 23, Survey No. 69A, Cts No. 5931-03-2024 00:00:00
TulsidhamTulsidal Builders And Developers2476,259531-12-2025 00:00:00
PearlMacrotech Developers Limited29/1A/131-05-2027 00:00:00
Durve ArinaEvergreen DevelopersCts No 6096 To 6099 Village Dombivli City East31-12-2026 00:00:00
S.I. ArcadeSalman Iqbal Ahmed MominS.No. 45, Cts No. 437830-06-2028 00:00:00
Shreeji InfinityInfinity InfraPlot No 87 Sector 1131-12-2028 00:00:00
Sector 2A - Wing EEversmile Properties Private LimitedNew Sno 66,68,69 Of Village Penkarpada30-06-2028 00:00:00
Dgt - Sector 3A - Cluster 2 - Phase 4Adrika Developers Private Limited162(Pt)31-08-2028 00:00:00
Reliable ResidencyReliable InfraventuresPLOT NO 72 SC S NO 12, 130-04-2024 00:00:00
Aadi AarambhNirman Construction129/1 A And 129/1B28-02-2018 00:00:00
Pushpa ParkVas Infrastructure Ltd.75715-08-2023 00:00:00
PurvaGnp Developers58/66/14C And 58/66/15 Plot No 14 And 1531-12-2019 00:00:00
Foresta & FioraPalava Dwellers Private Limited53/3,65/15A, 65/15B28-08-2023 00:00:00
Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 2Adrika Developers Private LimitedSurvey No.23/1B(Pt), 23/1C(Pt) Of Village Rahanal And Survey No.158(Pt)31-10-2028 00:00:00
Iflex SpacesRnv Developers Private LimitedNew S No 29/3 Old S No 24/331-12-2027 00:00:00
Shreesha HeightsVastunirman Developers111/A & 112/115-08-2028 00:00:00
Rustomjee La Vie Wing CKapstone Constructions Private LimitedSub Plot 8A Survey No 328/3/B(Pt), 328/3/F(Pt), 329/2(Pt) Of Village Majiwade28-02-2029 00:00:00
Jagtap ApartmentVijayalakshmi DevelopersCts No 95830-06-2023 00:00:00
Triveni ClassicTriveni Lifestyle Developers LlpS No 121 Hissa No 1, 2, 830-06-2024 00:00:00
Madhusudan RetreatMadhusudan Leisure HomesCts Plot Bearing No 5030-06-2024 00:00:00
Shilpa ChslOrchid Builtcon Pvt. Ltd.F P No 11830-12-2022 00:00:00
Allure CommercialAadi Properties Llp1196-B30-12-2024 00:00:00
Shreeji ParadiseBuilding Technologies India Pvt. Ltd.414C Pt. 414C/26 To 8830-12-2022 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
James Cottage Co-Operative Housing Society LtdShrusti Realtors43/430-09-2023 00:00:00
Precious ImperialRkr RealityPlot No 2B,S.No.54/3/E P, 55/2 P31-08-2025 00:00:00
Krishna DhamAtree RealtorsSurvey No 73 Hissna No 4 Plot No 1 Building No 131-12-2025 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Rustomjee La Vie Wing BKapstone Constructions Private LimitedSub Plot No 8A Survey No 329/2(Pt) 329/3(Pt) Of Village Majiwade28-02-2029 00:00:00
SwapnpoortiSwapnpoorti Co-Operative Housing SocietyPlot No- 39+40, Sector-40, Nerul31-12-2025 00:00:00
Arena SquareEmpire Arena134/1, 134/2/A And 13630-06-2030 00:00:00
Park EnclaveNayantara NxtCts No 6230 6231 And 6232 Mauje Ayre Dombivli East 42120130-06-2025 00:00:00
Project Details
  • Project:
    Deep Divine-4
  • Location:
  • Plot No 4
  • Const. Stage:
    New
  • Possession:
    30 Mar 2022
Developer Details

  • Developer:
    Sambhav Arena Llp
  • Phone:
  • Address:
  • Pushpa Ganga Chs Ltd
Project RERA Details
MAHA REARA No: P52000018422
Project Type Residential / Group Housing
RERA Project Status New
Architect Atul Patel
Funding Bank IDBI BANK
Proposed Possession 30 Mar 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 30 Oct 2018
Last Retrived 28 Jul 2025
Deep Divine-4 QR Code
Deep Divine-4
MahaRERA - P52000018422
Apartment Details & Configuration
TypeArea
1 BHK23.96 Sq.mts. ( 258 Sq.ft. )
1 BHK24.67 Sq.mts. ( 266 Sq.ft. )
1 BHK24.87 Sq.mts. ( 268 Sq.ft. )
1 BHK24.95 Sq.mts. ( 269 Sq.ft. )
1 RK TERRACE15.03 Sq.mts. ( 162 Sq.ft. )
1 RK TERRACE17.75 Sq.mts. ( 191 Sq.ft. )
1 RK TERRACE19.62 Sq.mts. ( 211 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Deep Divine-4last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Electric Meter Room
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Tree Plantation
Open Parking
Only 2
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Cidco Connection After Oc
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rain Water Harvesting
Water Supply
Cidco Connection After Oc
Buildings / Wings in Deep Divine-4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Deep Divine-4 by Sambhav Arena Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.

2368 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

13 apartments in total
Total
13
Booked
13
Available
0

Saleable Area Statistics (Sq. ft.)

3208 Total
Total
3208
Booked
3208
Available
0
Total 13 apartments in project. 13 apartments booked. 100% apartments booked.
Total 3208 Sq.ft. saleable area. 3208 saleable area booked.
100% area booked.

Deep Divine-4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Deep Divine-4Mar 20215101023
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.96 Sq.mts. ( 258 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK24.67 Sq.mts. ( 266 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK24.87 Sq.mts. ( 268 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK24.95 Sq.mts. ( 269 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 RK TERRACE15.03 Sq.mts. ( 162 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 RK TERRACE17.75 Sq.mts. ( 191 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 RK TERRACE19.62 Sq.mts. ( 211 Sq.ft. )1
1 Booked100% Booked
100% Booked
13 total apartments / 13 apartments booked. 100% apartments booked.
Work Description in Building Deep Divine-4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Sambhav Arena Llp
for Project
Deep Divine-4
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation