Project overview

Datta Ramanand Chs Ltd is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800001236. Datta Ramanand Chs Ltd is located at 717 /1 To 51, 717. This is a Ongoing being developed by Disha Construction.

Datta Ramanand Chs Ltd has 1 BHK, 1RK & 3 BHK Apartments with carpet areas ranging from 290 to 888 Sq.ft. Carpet. The Project has total 61 of which 47 are currently available for sale.

Datta Ramanand Chs Ltd is being developed on a total land area of 48158 Sq.ft. out of which 9623 Sq.ft. i.e 20% is reserved for recreational purposes. Datta Ramanand Chs Ltd has 9 Wings / Towers A Wing Phase 1,B Wing Phase 1,C Wing Phase 1,D Wing Phase 1,E Wing Phase 1,F Wing Phase 1,G Wing Phase 1,H Wing Phase 1,I Wing Phase 1

ProjectDeveloperLocationPossession
Neumec NiwaraNeumec Venture419Pt 419/1 To 4 And 426Pt 426/1430-03-2020 00:00:00
Hans EleganceShree Hans Realtors Llp1285 1285/1 To 230-09-2018 00:00:00
Shukratara ChslHariom Developers34-A31-10-2019 00:00:00
Zee HeightsGrpm Infraprojects Llp400057, Mumbai Suburban31-03-2019 00:00:00
Neel Gagan Sra Chs LtdR G CorporationPlot 373374 Cts No 186330-12-2024 00:00:00
RoshniAspy CaptainMumbai Suburban, 40005730-10-2018 00:00:00
Zee SargamZee Pragatee Developers Llp115730-09-2020 00:00:00
Shreeji KrupaParesh Pujara And Abhiraj Pujara (Aop)10-21 /345-5/28731-12-2019 00:00:00
Dhoot Emrald Residency-Jaygun Sagar ChslDhoot Developers Pvt. Ltd.195/7231-03-2018 00:00:00
Shanti VijayNavkar Infra ProjectsCts No.1891 Tps -5, Fp No.4710-07-2019 00:00:00
Amardeep Mahal Chs LtdNitin Harshadrai Maniar1667/1 To 8, 1669, 167031-12-2019 00:00:00
Gundecha DesireRockline Developers Pvt. Ltd.Cts 724/731-12-2018 00:00:00
Zee SquareZee Infra Projects Private Limited971 1 To 15, 97130-12-2019 00:00:00
Zee ShaanTrisul Developers579 B30-12-2024 00:00:00
Marvel PrideMarvellous Builders Private LimitedC.T.S No.181330-09-2020 00:00:00
Ramchandra NiwasShree Tirupati DevelopersPlot No.189, Cts No. 1416, Survey No. 100030-12-2021 00:00:00
Zee NayakPragatee Zee400057, Mumbai Suburban31-12-2020 00:00:00
Redevelopment Of Vishva Anand Chs LtdR R ConstructionsFp No 102 Of Tps I At Vile Parle East31-12-2019 00:00:00
SamkitJitendra Kantilal Shah104631-07-2023 00:00:00
Ivy MarvelNeumec Reality1899 1899/1 To 7/F.P. No.-47030-12-2022 00:00:00
Gokul SatyaHeena LifestylesMumbai Suburban, 40005601-07-2018 00:00:00
Datta Ramanand Chs LtdDisha Construction717 /1 To 51, 71731-12-2019 00:00:00
Swarup NiketanSun-Vision Estates LtdPlot No. 49 Cts No. 146/1328-02-2019 00:00:00
Yoga Yog Chs - CrestHariom Sayaji Properties LlpF.P 197/201 Tps 2, Fp 253 Tps 505-05-2022 00:00:00
Niramaya Chs LtdShamik Enterprises Pvt Ltd.Cts No. 1798 Part / Final Plot No. 328 And 32930-06-2018 00:00:00
Sun-Vison SolitaireDhan International Pvt LtdFinal Plot No. 47, Cts Nos. 903 A And B31-03-2018 00:00:00
Neumec VinayakNeumec VentureCts 418 C/131-03-2019 00:00:00
Sheela Smruti ChslBlack Gold Developers Pvt Ltd507, 507/1 And 507/204-05-2020 00:00:00
Aniket Chs LtdR. R. Infraventures Private LimitedCts No.834-835 F.P.58-5931-12-2019 00:00:00
Sudhanshu Chs LtdHariom Developers22431-10-2018 00:00:00
Jeevan Tara Chs LtdRegent Builders51431-03-2027 00:00:00
Vireshwar Darshan Chs LtdVireshwar Darshan Chs Ltd63230-06-2024 00:00:00
Parleshwar AanganPanom Developers Llp332/1 To 42, 354 (Pt), 364/1 To 12, 366, 354/17, 366/1 To 15, 333 (Pt), 2095/1 To 10, 365/1 To 6, 360 (Pt) 364, 369/1 To 18 And 2095, 368/1 To 10, Cst No 331, 332, 365, 369, 36731-12-2025 00:00:00
Sudarsan Chs LtdRegent Spaces88831-03-2019 00:00:00
PrathamVardhman EnterprisesFinal Plot No 58 Of Tps No Ii31-12-2017 00:00:00
Forefront PrimeriaForefront Private LimitedFinal Plot No.291, Cts No. 157030-06-2021 00:00:00
Medinee Chs LtdShamik Enterprises Pvt Ltd.Cts No. 1167, 1167/1 To 3 Part/ Final Plot No. 28531-12-2017 00:00:00
Shubhada Co-Operative Housing Society Ltd.Bhoomivijay Properties Private Limited253 253 1 To 830-06-2021 00:00:00
Varsha Olive ChslNitesh J JainCts 1536 And 1543 Fp 41331-03-2019 00:00:00
CelestialDarshan Sky High Realty760/1 To 6, 76028-02-2023 00:00:00
Rudra HeightsSagar Manoj GoradiaF.P. No 44C30-09-2023 00:00:00
Hirani VillaAmi Infra Projects Private Limited1663B/1-430-03-2023 00:00:00
Project Details
  • Project:
    Datta Ramanand Chs Ltd
  • Location:
  • 717 /1 To 51, 717
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Disha Construction
  • Phone:
  • Address:
  • Square One
Project RERA Details
MAHA REARA No: P51800001236
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Premal Gogri
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Dec 2021
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 26 Jul 2025
Datta Ramanand Chs Ltd QR Code
Datta Ramanand Chs Ltd
MahaRERA - P51800001236
Apartment Details & Configuration
TypeArea
00 Sq.mts. ( 0 Sq.ft. )
1 BHK33.82 Sq.mts. ( 364 Sq.ft. )
1 BHK34.56 Sq.mts. ( 372 Sq.ft. )
1 BHK38 Sq.mts. ( 409 Sq.ft. )
2 BHK47.85 Sq.mts. ( 515 Sq.ft. )
1 BHK32.79 Sq.mts. ( 353 Sq.ft. )
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )
2 BHK59.64 Sq.mts. ( 642 Sq.ft. )
1 BHK37.9 Sq.mts. ( 408 Sq.ft. )
2 BHK66.76 Sq.mts. ( 719 Sq.ft. )
2 BHK68.85 Sq.mts. ( 741 Sq.ft. )
1 BHK38.83 Sq.mts. ( 418 Sq.ft. )
2 BHK66.63 Sq.mts. ( 717 Sq.ft. )
2 BHK66.75 Sq.mts. ( 718 Sq.ft. )
1 BHK36.42 Sq.mts. ( 392 Sq.ft. )
1 BHK43.76 Sq.mts. ( 471 Sq.ft. )
2 BHK66.26 Sq.mts. ( 713 Sq.ft. )
1 BHK35.86 Sq.mts. ( 386 Sq.ft. )
1 BHK41.77 Sq.mts. ( 450 Sq.ft. )
1 BHK41.81 Sq.mts. ( 450 Sq.ft. )
2 BHK47.66 Sq.mts. ( 513 Sq.ft. )
2 BHK47.75 Sq.mts. ( 514 Sq.ft. )
2 BHK63.57 Sq.mts. ( 684 Sq.ft. )
2 BHK67.51 Sq.mts. ( 727 Sq.ft. )
1 BHK34.1 Sq.mts. ( 367 Sq.ft. )
1 BHK37.07 Sq.mts. ( 399 Sq.ft. )
2 BHK66.84 Sq.mts. ( 719 Sq.ft. )
2 BHK74.3 Sq.mts. ( 800 Sq.ft. )
1 BHK44.59 Sq.mts. ( 480 Sq.ft. )
1RK26.94 Sq.mts. ( 290 Sq.ft. )
1RK27.59 Sq.mts. ( 297 Sq.ft. )
3 BHK69.92 Sq.mts. ( 753 Sq.ft. )
3 BHK82.49 Sq.mts. ( 888 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Datta Ramanand Chs Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal100% completed
95% Complete
Completed
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Datta Ramanand Chs Ltd
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Datta Ramanand Chs Ltd by Disha Constructionlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

48158 Sq. ft.

Project Area

9623 Sq. ft.

Recreational Open Space

Total 9

Wings / Towers in Project

Apartments Statistics

61 apartments in total
Total
61
Booked
14
Available
47

Saleable Area Statistics (Sq. ft.)

37073 Total
Total
37073
Booked
9774
Available
27298
Total 61 apartments in project. 14 apartments booked. 22% apartments booked.
Total 37073 Sq.ft. saleable area. 9774 saleable area booked.
26% area booked.

A Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A Wing Phase 1Jun 202161100025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
1 BHK33.82 Sq.mts. ( 364 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.56 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38 Sq.mts. ( 409 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK47.85 Sq.mts. ( 515 Sq.ft. )1
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A Wing Phase 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B Wing Phase 1Dec 201961100026
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.79 Sq.mts. ( 353 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.56 Sq.mts. ( 372 Sq.ft. )2
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B Wing Phase 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C Wing Phase 1Dec 201961100024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK59.64 Sq.mts. ( 642 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 total apartments / 2 apartments booked. 100% apartments booked.
Work Description in Building C Wing Phase 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D Wing Phase 1Dec 201961100025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.9 Sq.mts. ( 408 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK66.76 Sq.mts. ( 719 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK68.85 Sq.mts. ( 741 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 total apartments / 2 apartments booked. 66% apartments booked.
Work Description in Building D Wing Phase 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

E Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E Wing Phase 1Dec 201961100019
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.56 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38 Sq.mts. ( 409 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38.83 Sq.mts. ( 418 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK66.63 Sq.mts. ( 717 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK66.75 Sq.mts. ( 718 Sq.ft. )1
None Booked0% Booked
0% Booked
5 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E Wing Phase 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

F Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F Wing Phase 1Dec 201961100019
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.56 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK36.42 Sq.mts. ( 392 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK43.76 Sq.mts. ( 471 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK47.85 Sq.mts. ( 515 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK66.26 Sq.mts. ( 713 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK66.75 Sq.mts. ( 718 Sq.ft. )1
None Booked0% Booked
0% Booked
6 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building F Wing Phase 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

G Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G Wing Phase 1Dec 201961100019
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.86 Sq.mts. ( 386 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK41.77 Sq.mts. ( 450 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK41.81 Sq.mts. ( 450 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK47.66 Sq.mts. ( 513 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK47.75 Sq.mts. ( 514 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK63.57 Sq.mts. ( 684 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK67.51 Sq.mts. ( 727 Sq.ft. )1
1 Booked100% Booked
100% Booked
7 total apartments / 4 apartments booked. 57% apartments booked.
Work Description in Building G Wing Phase 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

H Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H Wing Phase 1Dec 201961100025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.1 Sq.mts. ( 367 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK37.07 Sq.mts. ( 399 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK47.75 Sq.mts. ( 514 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK66.84 Sq.mts. ( 719 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK74.3 Sq.mts. ( 800 Sq.ft. )5
None Booked0% Booked
0% Booked
10 total apartments / 2 apartments booked. 20% apartments booked.
Work Description in Building H Wing Phase 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

I Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
I Wing Phase 1Dec 201961100023
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44.59 Sq.mts. ( 480 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK26.94 Sq.mts. ( 290 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK27.59 Sq.mts. ( 297 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK69.92 Sq.mts. ( 753 Sq.ft. )12
3 BHK82.49 Sq.mts. ( 888 Sq.ft. )5
2 Booked40% Booked
40% Booked
20 total apartments / 4 apartments booked. 20% apartments booked.
Work Description in Building I Wing Phase 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Disha Construction
for Project
Datta Ramanand Chs Ltd
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation