Project overview

Dashmesh Empire is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700046663. Dashmesh Empire is located at S No 9/5. This is a New being developed by Dashmesh Infrastructure.

Dashmesh Empire has 1 BHK, 2 BHK, Office space & Shop Apartments with carpet areas ranging from 146 to 826 Sq.ft. Carpet. The Project has total 141 of which 105 are currently available for sale.

Dashmesh Empire is being developed on a total land area of 26157 Sq.ft. Dashmesh Empire has 1 Wings / Towers Dashmesh Empire

ProjectDeveloperLocationPossession
Ekveera GardensPradeep DhuleThane, 42150331-12-2018 00:00:00
Daimond Lifespace Wing 4Ekveera Skyliner Construction Co Private Limited421503, Thane31-12-2019 00:00:00
Sky Gardens At Godrej VihaaK. R. Real Estate Pvt. Ltd.Sno 7/1Pt 7/2Pt 7/3Pt 6/1Pt 6/2Pt 6/3Pt 6/4 5/6Pt30-12-2023 00:00:00
Samruddhi Evergreen-Phase-4BPoddar Housing And Development LimitedGut No. 4/2 Part31-03-2019 00:00:00
Usha Kiran Residency Wing E1 E2 E3Usha Construction CoS No 3 Hissa No 2 3 4 5 7 P 8 9 1031-12-2017 00:00:00
Samruddhi Evergreens-Phase-4APoddar Housing And Development LimitedGut No.4/2 Part31-03-2018 00:00:00
Adiraj CrystalShree Adiraj Laxmi Builders Pvt. LtdThane, 42150331-12-2017 00:00:00
Sai ResidencySai Raj DevelopersSr No 32/2/1 32/2/2 32/2/330-12-2021 00:00:00
Shivshakti GreensShivshakti RealitySurvey No.1 Hissa No. 4/2,4/330-12-2022 00:00:00
SiddhicitySiddhitech Homes Private Limited81 H.No. 1A30-06-2018 00:00:00
Siddhicity Phase-VSiddhitech Homes Private Limited84 H.No.2/2A , 2/2B 31-12-2019 00:00:00
Project Details
  • Project:
    Dashmesh Empire
  • Location:
  • S No 9/5
  • Const. Stage:
    New
  • Possession:
    30 Jun 2027
Developer Details

  • Developer:
    Dashmesh Infrastructure
  • Phone:
  • Address:
  • Sairam Apt.
Project RERA Details
MAHA REARA No: P51700046663
Project Type Others
RERA Project Status New
Architect Pramod Patil
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 27 Jul 2023
Last Retrived 26 Jul 2025
Dashmesh Empire QR Code
Dashmesh Empire
MahaRERA - P51700046663
Apartment Details & Configuration
TypeArea
1 BHK30.38 Sq.mts. ( 327 Sq.ft. )
1 BHK32.88 Sq.mts. ( 354 Sq.ft. )
1 BHK32.98 Sq.mts. ( 355 Sq.ft. )
1 BHK35.34 Sq.mts. ( 380 Sq.ft. )
1 BHK35.61 Sq.mts. ( 383 Sq.ft. )
1 BHK35.8 Sq.mts. ( 385 Sq.ft. )
2 BHK41.27 Sq.mts. ( 444 Sq.ft. )
2 BHK46.32 Sq.mts. ( 499 Sq.ft. )
2 BHK46.65 Sq.mts. ( 502 Sq.ft. )
Office space76.72 Sq.mts. ( 826 Sq.ft. )
Shop13.56 Sq.mts. ( 146 Sq.ft. )
Shop15.47 Sq.mts. ( 167 Sq.ft. )
Shop15.75 Sq.mts. ( 170 Sq.ft. )
Shop18.87 Sq.mts. ( 203 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Dashmesh Empirelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Will Be Provided
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Will Be Provided
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Provided
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Will Be Provided
Water Supply
Mjp Will Supply Water.
Buildings / Wings in Dashmesh Empire
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Dashmesh Empire by Dashmesh Infrastructurelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

26157 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

141 apartments in total
Total
141
Booked
36
Available
105

Saleable Area Statistics (Sq. ft.)

56613 Total
Total
56613
Booked
14269
Available
42344
Total 141 apartments in project. 36 apartments booked. 25% apartments booked.
Total 56613 Sq.ft. saleable area. 14269 saleable area booked.
25% area booked.

Dashmesh Empire

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Dashmesh EmpireJun 20271410101871
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.38 Sq.mts. ( 327 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK32.88 Sq.mts. ( 354 Sq.ft. )14
6 Booked42% Booked
42% Booked
1 BHK32.98 Sq.mts. ( 355 Sq.ft. )40
11 Booked27% Booked
27% Booked
1 BHK35.34 Sq.mts. ( 380 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK35.61 Sq.mts. ( 383 Sq.ft. )15
6 Booked40% Booked
40% Booked
1 BHK35.8 Sq.mts. ( 385 Sq.ft. )15
5 Booked33% Booked
33% Booked
2 BHK41.27 Sq.mts. ( 444 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK46.32 Sq.mts. ( 499 Sq.ft. )10
2 BHK46.65 Sq.mts. ( 502 Sq.ft. )26
7 Booked26% Booked
26% Booked
Office space76.72 Sq.mts. ( 826 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.56 Sq.mts. ( 146 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.47 Sq.mts. ( 167 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.75 Sq.mts. ( 170 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.87 Sq.mts. ( 203 Sq.ft. )2
None Booked0% Booked
0% Booked
141 total apartments / 36 apartments booked. 25% apartments booked.
Work Description in Building Dashmesh EmpireCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress74% done
74% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
work-in-progress50% done
50% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Dashmesh Infrastructure
for Project
Dashmesh Empire
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation