Project overview

Dashmesh Crystal Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700033926. Dashmesh Crystal Phase 2 is located at Survey No 84/4. This is a New being developed by Dashmesh Infrastructure.

Dashmesh Crystal Phase 2 has 1 BHK & 1RK Apartments with carpet areas ranging from 285 to 440 Sq.ft. Carpet. The Project has total 76 of which 14 are currently available for sale.

Dashmesh Crystal Phase 2 is being developed on a total land area of 19860 Sq.ft. Dashmesh Crystal Phase 2 has 2 Wings / Towers Wing A,Wing B

ProjectDeveloperLocationPossession
Samruddhi Evergreen-Phase-4BPoddar Housing And Development LimitedGut No. 4/2 Part31-03-2019 00:00:00
Usha Kiran Residency Wing E1 E2 E3Usha Construction CoS No 3 Hissa No 2 3 4 5 7 P 8 9 1031-12-2017 00:00:00
Samruddhi Evergreens-Phase-4APoddar Housing And Development LimitedGut No.4/2 Part31-03-2018 00:00:00
Ekveera GardensPradeep DhuleThane, 42150331-12-2018 00:00:00
Daimond Lifespace Wing 4Ekveera Skyliner Construction Co Private Limited421503, Thane31-12-2019 00:00:00
Sky Gardens At Godrej VihaaK. R. Real Estate Pvt. Ltd.Sno 7/1Pt 7/2Pt 7/3Pt 6/1Pt 6/2Pt 6/3Pt 6/4 5/6Pt30-12-2023 00:00:00
Adiraj CrystalShree Adiraj Laxmi Builders Pvt. LtdThane, 42150331-12-2017 00:00:00
Sai ResidencySai Raj DevelopersSr No 32/2/1 32/2/2 32/2/330-12-2021 00:00:00
Shivshakti GreensShivshakti RealitySurvey No.1 Hissa No. 4/2,4/330-12-2022 00:00:00
SiddhicitySiddhitech Homes Private Limited81 H.No. 1A30-06-2018 00:00:00
Siddhicity Phase-VSiddhitech Homes Private Limited84 H.No.2/2A , 2/2B 31-12-2019 00:00:00
Tulsi AawasRaj GroupS No-38 H No-4,5,631-12-2024 00:00:00
Dashmesh EmpireDashmesh InfrastructureS No 9/530-06-2027 00:00:00
Tulsi AaradhanaRaj GroupS No-41 H No-5A, S No-42 H No-1A S No-44 H No-C31-12-2025 00:00:00
Evergreen Residency Wing A,B,D,EBalaji ConstructionSurvey No 25 Hissa 5 And 6 Survey No 24 Hissa No 130-12-2022 00:00:00
Tulsi AadvikRaj GroupSurvey No.40 Hissa No.1, Survey No. 41 Hissa No. 1, Survey No.41 Hissa No.2/130-03-2022 00:00:00
Uma Ashish B WingParasiya DevelopesS No 5 H No 17 And 1831-07-2018 00:00:00
Godrej Vihaa Phase 2K. R. Real Estate Pvt. Ltd.16 Pt, 78 Pt, 79 Pt, 71014-08-2022 00:00:00
Godrej Vihaa Phase 1K. R. Real Estate Pvt. Ltd.1/12 Pt, 1/6 Pt30-07-2022 00:00:00
Sharmila ResidencyAnnapurna Enterprises46, Hissa No 331-03-2025 00:00:00
Tulsi AanandRaj GroupS No-40 H No-1P / S No-40 H No-2P31-12-2025 00:00:00
Panvelkar Greens - Phase IEshan DevelopersS No 69 H No 26P 28P 29 S No 79 H No 1P31-12-2025 00:00:00
Platinum Sagar Jewel Wing D And EPlatinum Sagar HomesS.No.5 H.No. 930-05-2019 00:00:00
Shree Uma Shankar ApartmentShree Sai Aashray DevelopersS. No.5, H. No.26/131-03-2018 00:00:00
Godrej Vihaa Phase 5K. R. Real Estate Pvt. Ltd.Thane, 42150230-12-2031 00:00:00
Panvelkar Nisarg Phase Ii Building A2Panvelkar Realty Pvt LtdS.No.6931-12-2026 00:00:00
Nano CityPinnacle Spm GroupSurvey No 8/1A, 9/8, 8/2/B31-12-2027 00:00:00
Shree Hill ResidencySadguru CorporationS. No. 76, Hissa No. 1131-03-2026 00:00:00
Arihant Anmol Phase IiArihant Vatika Realty Private LimitedSurvey No. 67, 68 And 6930-09-2020 00:00:00
Uma VatikaUma CreativeS. No. 5 H. No. 20,30-06-2019 00:00:00
Usha Kiran Residency F1 F2Stalwart Impex Pvt LtdS No 3 Hissa No 2 3 4 5 7 P 8 9 1031-12-2018 00:00:00
Dashmesh Crystal Phase 2Dashmesh InfrastructureSurvey No 84/430-06-2024 00:00:00
Sai Tirth Phase IiPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East31-03-2025 00:00:00
Blossom HeightShiv Sai ConstructionsS No 5/25/A31-12-2024 00:00:00
Dhruvika EnclaveManoyadnya Developers3/69/7/1/D30-09-2020 00:00:00
Sarvesh Dream CitySai Shradha DevelopersSurvey No 76 Hissa No 128-11-2022 00:00:00
Matoshree ParkShree Trupati Balaji RealtorsS No 2 H No3 And S No3 H No3 At Village Joveli30-08-2018 00:00:00
Neelkanth JyotPrapti EnterprisesS No 5 H No 10D30-06-2019 00:00:00
Vrindavan NiketanPrakash Bhojraj ShewaniSurvey No 7A Hissa No 4 Part Plot No 431-12-2018 00:00:00
Usha Kiran Residency Wing E1 E2 E3Stalwart Impex Pvt LtdS No 3 Hissa No3 4 6 7 P 8 9 10 1131-12-2017 00:00:00
Project Details
  • Project:
    Dashmesh Crystal Phase 2
  • Location:
  • Survey No 84/4
  • Const. Stage:
    New
  • Possession:
    30 Jun 2024
Developer Details

  • Developer:
    Dashmesh Infrastructure
  • Phone:
  • Address:
  • Sairam Apt.
Project RERA Details
MAHA REARA No: P51700033926
Project Type Residential / Group Housing
RERA Project Status New
Architect Raj And Associates
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 27 Apr 2023
Last Retrived 26 Jul 2025
Dashmesh Crystal Phase 2 QR Code
Dashmesh Crystal Phase 2
MahaRERA - P51700033926
Apartment Details & Configuration
TypeArea
1 BHK38.35 Sq.mts. ( 413 Sq.ft. )
1 BHK38.49 Sq.mts. ( 414 Sq.ft. )
1 BHK38.61 Sq.mts. ( 416 Sq.ft. )
1 BHK39.33 Sq.mts. ( 423 Sq.ft. )
2 BHK51.02 Sq.mts. ( 549 Sq.ft. )
1 BHK40.15 Sq.mts. ( 432 Sq.ft. )
1 BHK40.49 Sq.mts. ( 436 Sq.ft. )
1 BHK40.86 Sq.mts. ( 440 Sq.ft. )
1RK26.44 Sq.mts. ( 285 Sq.ft. )
1RK26.71 Sq.mts. ( 288 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Dashmesh Crystal Phase 2last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking100% completed
95% Complete
Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Dashmesh Crystal Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Dashmesh Crystal Phase 2 by Dashmesh Infrastructurelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

19860 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

76 apartments in total
Total
76
Booked
62
Available
14

Saleable Area Statistics (Sq. ft.)

31136 Total
Total
31136
Booked
25129
Available
6007
Total 76 apartments in project. 62 apartments booked. 81% apartments booked.
Total 31136 Sq.ft. saleable area. 25129 saleable area booked.
81% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJun 2024710103010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.35 Sq.mts. ( 413 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK38.49 Sq.mts. ( 414 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK38.61 Sq.mts. ( 416 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK39.33 Sq.mts. ( 423 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK51.02 Sq.mts. ( 549 Sq.ft. )7
7 Booked100% Booked
100% Booked
35 total apartments / 35 apartments booked. 100% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJun 2024710103313
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.61 Sq.mts. ( 416 Sq.ft. )7
3 Booked42% Booked
42% Booked
1 BHK40.15 Sq.mts. ( 432 Sq.ft. )7
1 BHK40.49 Sq.mts. ( 436 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK40.86 Sq.mts. ( 440 Sq.ft. )6
4 Booked66% Booked
66% Booked
1RK26.44 Sq.mts. ( 285 Sq.ft. )7
7 Booked100% Booked
100% Booked
1RK26.71 Sq.mts. ( 288 Sq.ft. )7
7 Booked100% Booked
100% Booked
41 total apartments / 27 apartments booked. 65% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Dashmesh Infrastructure
for Project
Dashmesh Crystal Phase 2
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation