Project overview

Dange Chawre Crown A Wing is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000019602. Dange Chawre Crown A Wing is located at 13/1A, H.No 1 To 5, 1B/1 And S.No 14. This is a New being developed by Dange Builders.

Dange Chawre Crown A Wing has 1 BHK, 2 BHK & 3 BHK Apartments with carpet areas ranging from 349 to 708 Sq.ft. Carpet. The Project has total 94 of which 30 are currently available for sale.

Dange Chawre Crown A Wing is being developed on a total land area of 3760 Sq.ft. out of which 8909 Sq.ft. i.e 237% is reserved for recreational purposes. Dange Chawre Crown A Wing has 1 Wings / Towers Dange Chawre Crown A Wing

ProjectDeveloperLocationPossession
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
Building No 1 PadmavatiM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
Swanand TarangM/S Omkar RealtorsSurvey No 43 Hissa No 230-12-2021 00:00:00
Building No 2 Mahalakshmi A WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Jhalak Luxuria Phase IJhalak ConstructionsGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
Anantam - Phase IOyster Living Llp13/230-06-2022 00:00:00
Building No 2 Mahalakshmi B WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Amruta ChsUtkarsha Construction7462/70/2403-06-2022 00:00:00
Sai Shrushti SapphireSai Shrushti Enterprises136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Om Tanishq ResidencyM/S Laxmi RealtySurvey No 4, Hissa No 1A/230-03-2022 00:00:00
Amakin Mohammediyah Phase 3Amakin Mohammediyah Private Limited31/6 And 730-12-2024 00:00:00
Anantam - Phase IiOyster Living Llp18/1230-06-2022 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Riverview Classic Building No 4, Phase IvRutu BuildersS No 27, H No 5, 3/3 S No 28/ H. No 1,2,3,4/1,4/2,4/330-12-2022 00:00:00
Olivia PrimeSkyline Buildpro43/2B/3/230-06-2022 00:00:00
Rai S AaragyaRai Residency Private LimitedSurvey No 46 Hissa No 5 And 730-12-2026 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Rai S VrundavanRai Residency Private LimitedSurvey No 64 Hissa No 230-12-2023 00:00:00
Takshila ResidencyDelux AssociatesS No 157/13Pt S No 158/1Pt Plot No 1 And 230-12-2023 00:00:00
Om RamchandraLaxmi DevelopersGaothan Chalata No 109 House No 38030-11-2020 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Sajan Shantaram HeightTirupati DevelopersNew Survey No.1 Hissa No 1130-06-2021 00:00:00
Ram JanakiShree Ganesh Enterprises4947 To 495230-12-2026 00:00:00
Apple ParadiseApple ParadiseU No 99,100, Plot No 262 Part01-01-2019 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Mavis Tower A Wing From 5Th Floor To 7Th FloorM/S. Unit Arsen Developers (Joint Venture)431C Part31-12-2019 00:00:00
Infinite ResidencyMistry Construction Co. Pvt. Ltd.Pocket D And E30-06-2029 00:00:00
Mansipooja HeightS K InfrastructureSurvey No 3 Hissa No 630-03-2023 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Thanekar CivicShree Swami Samarth EnterprisesS No 133, H No 209-04-2024 00:00:00
Saurabh ResidencyM/S Krishna Builders & DevelopersS No 77 , H No 2/1730-06-2024 00:00:00
Ved ParadiseKulkarni And Associates896631-12-2024 00:00:00
Dashmesh ParkSatyam ConstructionsCts No 2340931-03-2023 00:00:00
Shankeshwar DarshanKalpvriksh Homes LlpOld Sno 559 New Sno 207 Hno 1,2 Old Sno 560 New Snio 165 Hno 1Pt31-12-2024 00:00:00
Eknath Heights - 1Omkar EnterprisesSurvey No 123 Hissa No 331-12-2022 00:00:00
SambhaviShree Vakratunda DevelopersSurvey No 531-10-2024 00:00:00
Shree Mangal Narayan ResidencyN V ConstructionCts 9721 To973431-12-2023 00:00:00
Vakratunda HomesNarayan Sunil RanePlot No 4,S .No 108, Hissa No 131-12-2023 00:00:00
Shiv Aangan ResidencyDhananjay DevelopersSurvey No 40 Hissa No 5/2 And 5/630-03-2025 00:00:00
Nana Patil ResidencyQuality Builders & DevelopersPardi No 3, Hissa No 1, Hissa No 231-01-2021 00:00:00
Satyam OrchidGirija InfrastructurePlot No 1030-12-2021 00:00:00
Hemant Shishir Co.Op HsgNarendra Kalyanji Patel3512-352131-12-2023 00:00:00
Fortune EmporioQuanta Realty LlpCts No 4090 To 4096,4166 To 4171,4240,4241 New Sno 37 Hno 3C31-12-2025 00:00:00
The Valaji EstateFore Holdings4065,4093-4097,4099-410205-07-2024 00:00:00
Plot No -1A,Sector -19, Vashi Truck TerminalCity And Industrial Development Corporation Of Maharashtra LimitedPlot No -1A31-12-2025 00:00:00
Jp HarmonyJp Corp Developers (India) Llp12931-12-2023 00:00:00
Deep Royal ResidencyM/S. Deepali Infracon LlpSurvey No.80 Hissa No.231-12-2023 00:00:00
Vrundavan DhamShikhar LifespacesS.No 13, H No. 1 P31-12-2023 00:00:00
Riverwood Park Building No -3Shree Khidkaleshwar Property Developers Pvt. Ltd.26/2, 26/3 All In Parts30-06-2026 00:00:00
Vishwajeet Empire NxGulabrao Baburao Karanjule PatilSurvey No 39 Hissa No 2A, Hissa No 2B, Hissa No 2C And Hissa No 2D23-06-2026 00:00:00
Fenkin EmpireFen-Kin Realtors & Project Pvt LtdCts No 313 And 314B31-07-2023 00:00:00
Sai PearlM/S Mitra RealityS No 67 H No 331-12-2025 00:00:00
Baradia EkdantBaradia RealtyCts No 259,26022-07-2026 00:00:00
Rock Mount ResidencyBuilt Charms46/6/A 46/1/A/5 46/1/A/3/4/6 47/2/A30-06-2026 00:00:00
Chandrabhaga HeightsJai Santoshi Mata Construction Builders And DevelopersS. No. 15731-07-2024 00:00:00
Ekatva SignetBhoomi DevelopersTikka No.15 Cts No.39/A/1/B Pt31-12-2023 00:00:00
Manovi PrithviManovi PrithviS. No. 217 H. No.3/H Plot No. 731-05-2024 00:00:00
Sarvoday SymphonySwastik RealtorsSurvey No 91 Old 25New Hissa No 1 Survey 92 Old 3 New Hissa No 330-06-2026 00:00:00
PitrukrupaMellennium RealtyOld Survey No 326/A New Survey No 229/Part Plot No 33 Cts No 680 And68131-03-2023 00:00:00
Tulsi AagmanRaj GroupS No 36 H No-1,2,3 S No-37 H No-1 S No-40 H No-530-04-2025 00:00:00
Raheja Solaris-1Raheja Universal (Pvt.) Ltd.Gen-2/1/B30-12-2026 00:00:00
Shree Vighneshwar HeightsMahesh Shyamsundar Goyal114/5/3/3,115/1,115/231-03-2027 00:00:00
Runwal Gardens Phase 4 Bldg No. 33-34Runwal Residency Private LimitedSurvey Nos 4/5Pt, 5/1Pt, 5/2Pt, 5/3Pt, 5/4Pt, 5/5Pt30-06-2025 00:00:00
Sahara ResidencySahara ResidencySurvey No 20 Hissa No 931-12-2024 00:00:00
S.S. ResidencyAl Siraj Construction10631-12-2025 00:00:00
Sunteck Forestworld 3Sunteck Realty Holdings Pvt Ltd311Pt31-12-2026 00:00:00
Swanand Bliss Phase - IiM/S Nityanand RealtorsSurvey No. 58 Hissa No. 4/330-06-2025 00:00:00
GlenmarkMandar Construction (Mukund Balu Keni Huf)66/131-03-2022 00:00:00
Sunteck Forestworld 2Sunteck Realty Holdings Pvt Ltd309Pt30-06-2026 00:00:00
Magnus PrideMagnus BuildersS No. 69, H No. 10 And S No. 70, H No. 131-03-2024 00:00:00
Pride Of UttanBrickscity Developers Private LimitedSurvey No 117 Hissa No 327-05-2022 00:00:00
Vedant Millenia Happiness Phase Ii Wing BMohan Hardasmal TharwaniS No 221 3 1 P S No 221 3 2 P S No 221 4 P S No 221 6 A P31-08-2025 00:00:00
Precious Galaxy Wing BMahashar Mata Builders & DevelopersS.No. 38/C/1 Final Plot No. 131-05-2024 00:00:00
Muktai Mauli ChsYadav Bros ConstructionS No 55/25 Cts 917131-12-2023 00:00:00
Priti PlazaMahalaxmi ConstructionS No 70 H No 4 P30-09-2024 00:00:00
Vishwajeet Precious Phase IiAbhijeet PrideS No 32 S No 33/1 Part S No 30/12 A,B Part16-05-2026 00:00:00
Sunteck Forestworld 4Sunteck Realty Holdings Pvt Ltd287 Part, 315 Part31-12-2026 00:00:00
Mandar ArcadeGaondevi DevelopersSurvey No.49/H.No.21/Plot No.7B31-01-2024 00:00:00
Antalica TowersAntalica TowersSurvey No 22 H No 9/A30-10-2024 00:00:00
DattaviharSharda Vastu Nirmitee Pvt. Ltd.Tika No. 23, Survey No. 69A, Cts No. 5931-03-2024 00:00:00
TulsidhamTulsidal Builders And Developers2476,259531-12-2025 00:00:00
Seasons ParkShree Balaji HomesS No 49 H No 4/A, 4/B,6/D30-12-2022 00:00:00
Amrut SiddhiJayshree Builders40/2 40/3 40/4 40/5A 40/6 40/7 41/3 41/4A 41/4B 41/4C30-12-2023 00:00:00
Vaibhav HorizonVaibhav Siddhi Construction Co.563 4 Pt/4 Pt/4 Pt24-09-2023 00:00:00
Aramus ResidencyAramus Realty Llp34A30-12-2023 00:00:00
Palava Florea - A To DPalava Dwellers Private Limited61 Pt 62 Pt Village Khoni31-07-2023 00:00:00
Jagtap ApartmentVijayalakshmi DevelopersCts No 95830-06-2023 00:00:00
Triveni ClassicTriveni Lifestyle Developers LlpS No 121 Hissa No 1, 2, 830-06-2024 00:00:00
Madhusudan RetreatMadhusudan Leisure HomesCts Plot Bearing No 5030-06-2024 00:00:00
PurvaGnp Developers58/66/14C And 58/66/15 Plot No 14 And 1531-12-2019 00:00:00
Foresta & FioraPalava Dwellers Private Limited53/3,65/15A, 65/15B28-08-2023 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Project Details
  • Project:
    Dange Chawre Crown A Wing
  • Location:
  • 13/1A, H.No 1 To 5, 1B/1 And S.No 14
  • Const. Stage:
    New
  • Possession:
    20 Jan 2025
Developer Details

  • Developer:
    Dange Builders
  • Phone:
  • Address:
  • Dange House
Project RERA Details
MAHA REARA No: P99000019602
Project Type Residential / Group Housing
RERA Project Status New
Architect Sanat Mehta And Associates
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 20 Jan 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 08 Nov 2021
Last Retrived 28 Jul 2025
Dange Chawre Crown A Wing QR Code
Dange Chawre Crown A Wing
MahaRERA - P99000019602
Apartment Details & Configuration
TypeArea
1 BHK32.44 Sq.mts. ( 349 Sq.ft. )
1 BHK32.49 Sq.mts. ( 350 Sq.ft. )
1 BHK32.55 Sq.mts. ( 350 Sq.ft. )
1 BHK35.27 Sq.mts. ( 380 Sq.ft. )
1 BHK35.32 Sq.mts. ( 380 Sq.ft. )
1 BHK36.58 Sq.mts. ( 394 Sq.ft. )
2 BHK47.02 Sq.mts. ( 506 Sq.ft. )
2 BHK47.16 Sq.mts. ( 508 Sq.ft. )
3 BHK65.4 Sq.mts. ( 704 Sq.ft. )
3 BHK65.55 Sq.mts. ( 706 Sq.ft. )
3 BHK65.78 Sq.mts. ( 708 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Dange Chawre Crown A Winglast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Nil
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Nil
Energy management
Nil
Fire Protection And Fire Safety Requirements
Nil
Internal Roads & Footpaths
Nil
Landscaping & Tree Planting
Nil
Open Parking
Nil
Sewerage (Chamber, Lines, Septic Tank , STP)
Nil
Solid Waste Management And Disposal
Nil
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Nil
Water Conservation, Rain water Harvesting
Nil
Water Supply
Na
Buildings / Wings in Dange Chawre Crown A Wing
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Dange Chawre Crown A Wing by Dange Builderslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

3760 Sq. ft.

Project Area

8909 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

94 apartments in total
Total
94
Booked
64
Available
30

Saleable Area Statistics (Sq. ft.)

42442 Total
Total
42442
Booked
29052
Available
13391
Total 94 apartments in project. 64 apartments booked. 68% apartments booked.
Total 42442 Sq.ft. saleable area. 29052 saleable area booked.
68% area booked.

Dange Chawre Crown A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Dange Chawre Crown A WingJan 20241710101234
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.44 Sq.mts. ( 349 Sq.ft. )8
5 Booked62% Booked
62% Booked
1 BHK32.49 Sq.mts. ( 350 Sq.ft. )8
4 Booked50% Booked
50% Booked
1 BHK32.55 Sq.mts. ( 350 Sq.ft. )16
8 Booked50% Booked
50% Booked
1 BHK35.27 Sq.mts. ( 380 Sq.ft. )6
4 Booked66% Booked
66% Booked
1 BHK35.32 Sq.mts. ( 380 Sq.ft. )8
6 Booked75% Booked
75% Booked
1 BHK36.58 Sq.mts. ( 394 Sq.ft. )14
11 Booked78% Booked
78% Booked
2 BHK47.02 Sq.mts. ( 506 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK47.16 Sq.mts. ( 508 Sq.ft. )16
15 Booked93% Booked
93% Booked
3 BHK65.4 Sq.mts. ( 704 Sq.ft. )8
4 Booked50% Booked
50% Booked
3 BHK65.55 Sq.mts. ( 706 Sq.ft. )7
4 Booked57% Booked
57% Booked
3 BHK65.78 Sq.mts. ( 708 Sq.ft. )1
1 Booked100% Booked
100% Booked
94 total apartments / 64 apartments booked. 68% apartments booked.
Work Description in Building Dange Chawre Crown A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Dange Builders
for Project
Dange Chawre Crown A Wing
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation