Project overview
Daimond Lifespace Wing 4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700013115. Daimond Lifespace Wing 4 is located at 421503, Thane. This is a On-Going Project being developed by Ekveera Skyliner Construction Co Private Limited.
Daimond Lifespace Wing 4 has 1 BHK Apartments with carpet areas ranging from 11 to 11 Sq.ft. Carpet. The Project has total 1 of which 0 are currently available for sale.
Daimond Lifespace Wing 4 is being developed on a total land area of 23009 Sq.ft. Daimond Lifespace Wing 4 has 1 Wings / Towers Wing 4
| Project | Developer | Location | Possession |
| Ekveera Gardens | Pradeep Dhule | Thane, 421503 | 31-12-2018 00:00:00 |
| Daimond Lifespace Wing 4 | Ekveera Skyliner Construction Co Private Limited | 421503, Thane | 31-12-2019 00:00:00 |
| Sky Gardens At Godrej Vihaa | K. R. Real Estate Pvt. Ltd. | Sno 7/1Pt 7/2Pt 7/3Pt 6/1Pt 6/2Pt 6/3Pt 6/4 5/6Pt | 30-12-2023 00:00:00 |
| Samruddhi Evergreen-Phase-4B | Poddar Housing And Development Limited | Gut No. 4/2 Part | 31-03-2019 00:00:00 |
| Usha Kiran Residency Wing E1 E2 E3 | Usha Construction Co | S No 3 Hissa No 2 3 4 5 7 P 8 9 10 | 31-12-2017 00:00:00 |
| Samruddhi Evergreens-Phase-4A | Poddar Housing And Development Limited | Gut No.4/2 Part | 31-03-2018 00:00:00 |
| Siddhicity | Siddhitech Homes Private Limited | 81 H.No. 1A | 30-06-2018 00:00:00 |
| Siddhicity Phase-V | Siddhitech Homes Private Limited | 84 H.No.2/2A , 2/2B | 31-12-2019 00:00:00 |
| Uma Ashish B Wing | Parasiya Developes | S No 5 H No 17 And 18 | 31-07-2018 00:00:00 |
| Godrej Vihaa Phase 2 | K. R. Real Estate Pvt. Ltd. | 16 Pt, 78 Pt, 79 Pt, 710 | 14-08-2022 00:00:00 |
| Godrej Vihaa Phase 1 | K. R. Real Estate Pvt. Ltd. | 1/12 Pt, 1/6 Pt | 30-07-2022 00:00:00 |
| Tulsi Aawas | Raj Group | S No-38 H No-4,5,6 | 31-12-2024 00:00:00 |
| Dashmesh Empire | Dashmesh Infrastructure | S No 9/5 | 30-06-2027 00:00:00 |
| Tulsi Aaradhana | Raj Group | S No-41 H No-5A, S No-42 H No-1A S No-44 H No-C | 31-12-2025 00:00:00 |
| Sharmila Residency | Annapurna Enterprises | 46, Hissa No 3 | 31-03-2025 00:00:00 |
| Panvelkar Greens - Phase I | Eshan Developers | S No 69 H No 26P 28P 29 S No 79 H No 1P | 31-12-2025 00:00:00 |
| Dashmesh Crystal Phase 2 | Dashmesh Infrastructure | Survey No 84/4 | 30-06-2024 00:00:00 |
-
Project:
Daimond Lifespace Wing 4
-
Location:
-
421503, Thane
-
Const. Stage:
On-Going Project
-
Possession:
31 Dec 2019
-
Developer:
Ekveera Skyliner Construction Co Private Limited
-
Phone:
-
Address:
-
Survey No 9 Hissa No 1 And 3, Ekveera Garden, Ground Floor, Karjat Road, Next To Godrej Viva, Juveli, 421503
| MAHA REARA No: |
P51700013115 |
| Project Type |
Residential |
| RERA Project Status |
On-Going Project |
| Funding Bank |
THE KALYAN JANTA SAHAKARI BANK LTD |
| Proposed Possession |
31 Dec 2019 |
| Revised Possession |
30 Dec 2021 |
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
16 Aug 2017 |
| Last Retrived |
28 Jul 2025 |
Daimond Lifespace Wing 4 QR Code
Daimond Lifespace Wing 4
MahaRERA - P51700013115
| Type | Area |
| 1 BHK | 1 Sq.mts. ( 11 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Daimond Lifespace Wing 4last updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Na |
|
|
|
Solar Energy In Progress |
Fire Protection And Fire Safety
Requirements
|
|
Before Obtaining Oc |
Landscaping & Tree Planting
|
|
In Progress |
|
|
|
In Progress |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Before Obtaining Oc |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Na |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
In Progress |
|
|
|
After Obtaining Oc |
Buildings / Wings in Daimond Lifespace Wing 4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Daimond Lifespace Wing 4 by Ekveera Skyliner Construction Co Private Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
1
apartments in total
Saleable Area Statistics (Sq. ft.)
11
Total
Total 1 apartments in project. 1 apartments booked. 100% apartments booked.
Total 11 Sq.ft. saleable area. 11 saleable area booked.
100% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing 4 | Jan 1900 | 8 | 1 | 0 | 4 | 0 | 10 | 4 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 1 Sq.mts. ( 11 Sq.ft. ) | 1 | |
1 total apartments / 1 apartments booked. 100% apartments booked. |
| Work Description in Building Wing 4 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Ekveera Skyliner Construction Co Private Limited
for Project
Daimond Lifespace Wing 4
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |