Project overview

CRYSTAL VUE is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900006774. CRYSTAL VUE is located at 89Pt, 2Pt. This is a Ongoing being developed by Nageshwar V Neela.

CRYSTAL VUE has 3Bhk, 4Bhk & 5Bhk Apartments with carpet areas ranging from 1463 to 1005 Sq.ft. Carpet. The Project has total 53 of which 53 are currently available for sale.

CRYSTAL VUE is being developed on a total land area of 20036 Sq.ft. out of which 4518 Sq.ft. i.e 23% is reserved for recreational purposes. CRYSTAL VUE has 1 Wings / Towers Vue

ProjectDeveloperLocationPossession
Project Details
  • Project:
    CRYSTAL VUE
  • Location:
  • 89Pt, 2Pt
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2025
Developer Details

  • Developer:
    Nageshwar V Neela
  • Phone:
  • Address:
  • Triveni Shalimar Society
Project RERA Details
MAHA REARA No: P51900006774
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank INDUSIND BANK
Proposed Possession 30 Dec 2025
Revised Possession 30 Dec 2025
Extended Possession 30 Dec 2027
Litigations No Litigations
Last Modified 08 Oct 2024
Last Retrived 13 Feb 2026
CRYSTAL VUE QR Code
CRYSTAL VUE
MahaRERA - P51900006774
Apartment Details & Configuration
TypeArea
3Bhk91.04 Sq.mts. ( 980 Sq.ft. )
3Bhk93.37 Sq.mts. ( 1005 Sq.ft. )
4Bhk135.92 Sq.mts. ( 1463 Sq.ft. )
5Bhk175.86 Sq.mts. ( 1893 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of CRYSTAL VUElast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Equipment'S Will Provided By Service Provider
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
As Per Tree Noc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Will Be Completed Before Oc
STP60% completed
60% Complete
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Will Be Provided By Mcgm After Oc
Buildings / Wings in CRYSTAL VUE
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of CRYSTAL VUE by Nageshwar V Neelalast updated on 13 Feb 2026 as per information obtained from MARA RERA.

20036 Sq. ft.

Project Area

4518 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

53 apartments in total
Total
53
Booked
0
Available
53

Saleable Area Statistics (Sq. ft.)

72401 Total
Total
72401
Booked
0
Available
72401
Total 53 apartments in project. 0 apartments booked. 0% apartments booked.
Total 72401 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Vue

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
VueDec 202436101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3Bhk91.04 Sq.mts. ( 980 Sq.ft. )10
None Booked0% Booked
0% Booked
3Bhk93.37 Sq.mts. ( 1005 Sq.ft. )11
None Booked0% Booked
0% Booked
4Bhk135.92 Sq.mts. ( 1463 Sq.ft. )21
None Booked0% Booked
0% Booked
5Bhk175.86 Sq.mts. ( 1893 Sq.ft. )11
None Booked0% Booked
0% Booked
53 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building VueCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Nageshwar V Neela
for Project
CRYSTAL VUE
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation