Project overview

Corner Stone is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700032175. Corner Stone is located at Survey No.31, Hissa No. 05. This is a New being developed by Sarvodaya Amrut Llp.

Corner Stone has 2 BHK Apartments with carpet areas ranging from 487 to 675 Sq.ft. Carpet. The Project has total 299 of which 120 are currently available for sale.

Corner Stone is being developed on a total land area of 70370 Sq.ft. out of which 7487 Sq.ft. i.e 11% is reserved for recreational purposes. Corner Stone has 4 Wings / Towers Building 1-A Wing,Building 1-B Wing,Building 2-C Wing,Building 2-D Wing

ProjectDeveloperLocationPossession
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Shivaay AvyaanShreeram BuildconNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
Shubh Mangalam Phase IiShubh RealitySr No 106 Hissa No 125-12-2026 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Sai CityOm Sai Builders & DevelopersSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
Marathon Nextown JasperMarathon Ener-Gen140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Priyal AumShree Mauli Chs LtdPlot No 47 Sector 2601-06-2024 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
Chandrakant ResidencyAmogh ConstructionC.T.S No- 2 To 8 & C.T.S No- 169 To 178, C.T.S No- 295 To 30031-12-2027 00:00:00
Daisy Gardens Building No.13Ankita BuildersSurvey No 9, Hissa No 2A30-06-2026 00:00:00
Madhusudan Retreat TerracesMadhusudan Leisure HomesSurvey No 5031-12-2026 00:00:00
Jay ResidencyMukesh Vithal GiteS.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
Seven HeightsOvais Mudabbir BardiS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino AMacrotech Developers Limited62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Panvelkar EmpireOm Sai Shraddha DevelopersSurvey No. 30/4 (P)30-06-2026 00:00:00
Om Sai One ParkInfini DevelopersCts 133/3 133/4 134/3 134/5 134/9 134/10 134/11 134/4/A 138/13/A 138/13/B 138/13/C31-12-2028 00:00:00
Upper Thane-Iris Wing AMacrotech Developers Limited293/1 And 293/331-12-2027 00:00:00
Jivdani BuildingMildstone Enterprises Llp133231-12-2024 00:00:00
Yashraj HeightsVikrant Vikas Raikar731-01-2025 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
Vardhaman Tower Building Nos. 6 & 7Vardhaman Property DevelopersPlot Bearing Surveyno.26Hissa No1(Part)31-12-2023 00:00:00
Zircon HeightsIqbal Abdul Rauf Punjabi59/1, 83/5 Paiki, Cts No 482931-12-2024 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Belvedere-B And CMacrotech Developers Limited212/7A Part 212/7B Part 212/7C Part 212/7D Part 212/7E Part 25/2A(Part) 25/2B(Part) 25/4(Part)30-11-2027 00:00:00
Sai Dream OneGls InfrastructuresS No.88, H No 6 & 731-12-2025 00:00:00
Neelkanth Palm AvenueNeelkanth InfratechPlot No-23 & 24, Sector-09 Ghansoli29-12-2029 00:00:00
Building No 1 PadmavatiM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
Swanand TarangM/S Omkar RealtorsSurvey No 43 Hissa No 230-12-2021 00:00:00
Building No 2 Mahalakshmi A WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Jhalak Luxuria Phase IJhalak ConstructionsGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
Neelkanth Palm PresidentNeelkanth InfratechPlot No 10 Sectot 11 Ghansoli31-12-2029 00:00:00
Garden Estate Phase -IiShree Balaji DevelopersSurvey No. 46, Hissa No. 12/131-03-2025 00:00:00
Parvati NiwasAadarsh DevelopersCst No 27/1B, 27/1C Tikka No 2231-12-2025 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
Shree Saishraddha Apartment Building AShree Saishraddha EnterprisesSurvey No 9/3 And 16/130-03-2023 00:00:00
Pinnacolo NxSkd Realty LlpOld S.No.445,New S.No.12930-06-2025 00:00:00
Anantam - Phase IOyster Living Llp13/230-06-2022 00:00:00
Building No 2 Mahalakshmi B WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Shubham ResidencyShubham RealtyPlot No 79,Sector 2130-06-2025 00:00:00
Shree Mahalaxmi ResidencyShree Gajanan Builders And DevelopersS No 93 / H No A, S No 9431-07-2028 00:00:00
Thane ProjectMacrotech Developers Limited144/1 Part31-07-2029 00:00:00
Akshar Business Park- Phase IiiAkshar DevelopersPlot No. 3, Sector-2531-07-2022 00:00:00
Swaraj OrchidM/S Crystal HomesSurvey No 25 Hissa No 230-12-2022 00:00:00
Surya ComplexM/S. Jai Santoshi Maa EnterprisesS. No. 102, H. No.2, 3 Pt, 5, 17, 1830-06-2023 00:00:00
Amruta ChsUtkarsha Construction7462/70/2403-06-2022 00:00:00
Sai Shrushti SapphireSai Shrushti Enterprises136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
Omkar AvenueOmkar RealtorsCts No. 761 (Old Survey No.87/11 Plot No.11)31-03-2028 00:00:00
Century TwoCity InfraPlot No 22,Sector-0931-03-2028 00:00:00
Pokhriyal ParamountPokhriyal And AssociatesSurvey No. 127, Plot No. D31-12-2028 00:00:00
Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1Adrika Developers Private LimitedS. No. 156/1(Pt), 156/2(Pt), 157/1(Pt), 157/2(Pt), 159/1A(Pt), 159/1B(Pt), 159/1C(Pt)31-10-2028 00:00:00
Neelkanth Heights ChsShree Neelkanth DevelopersSurvey No 14 Hissa No 1 & 6 Plot No 4, 3 & 631-03-2026 00:00:00
19 EastMoreshwar Developers5230-12-2025 00:00:00
Reliance GoldGolden EnterprisesS No 58/1/4 S No 59/128-02-2028 00:00:00
Basera HeightsKamruddin Hasmullah SiddiqueOld Sno 223/5 221/1 New Sno 191/5 190/130-03-2024 00:00:00
Om Tanishq ResidencyM/S Laxmi RealtySurvey No 4, Hissa No 1A/230-03-2022 00:00:00
Amakin Mohammediyah Phase 3Amakin Mohammediyah Private Limited31/6 And 730-12-2024 00:00:00
Anantam - Phase IiOyster Living Llp18/1230-06-2022 00:00:00
Riverview Classic Building No 4, Phase IvRutu BuildersS No 27, H No 5, 3/3 S No 28/ H. No 1,2,3,4/1,4/2,4/330-12-2022 00:00:00
Olivia PrimeSkyline Buildpro43/2B/3/230-06-2022 00:00:00
Rai S AaragyaRai Residency Private LimitedSurvey No 46 Hissa No 5 And 730-12-2026 00:00:00
Shiv Aangan ResidencyDhananjay DevelopersSurvey No 40 Hissa No 5/2 And 5/630-03-2025 00:00:00
Nana Patil ResidencyQuality Builders & DevelopersPardi No 3, Hissa No 1, Hissa No 231-01-2021 00:00:00
Satyam OrchidGirija InfrastructurePlot No 1030-12-2021 00:00:00
Siddhivinayak GardensA1 Buildcon991, 2, 3 And 1001830-12-2024 00:00:00
Shree ShaliniJay Service And ConsultantCts No 251 And 252A30-09-2023 00:00:00
M Square It ParkPaper FlutingsA241 And A24230-03-2024 00:00:00
PearlMacrotech Developers Limited29/1A/131-05-2027 00:00:00
Durve ArinaEvergreen DevelopersCts No 6096 To 6099 Village Dombivli City East31-12-2026 00:00:00
S.I. ArcadeSalman Iqbal Ahmed MominS.No. 45, Cts No. 437830-06-2028 00:00:00
Shreeji InfinityInfinity InfraPlot No 87 Sector 1131-12-2028 00:00:00
Sector 2A - Wing EEversmile Properties Private LimitedNew Sno 66,68,69 Of Village Penkarpada30-06-2028 00:00:00
Dgt - Sector 3A - Cluster 2 - Phase 4Adrika Developers Private Limited162(Pt)31-08-2028 00:00:00
Shree Ganesh SymphonyPawar GroupS. No.172, H.No.1/801-12-2025 00:00:00
Trimurti GardenSai Narayan DevelopersSurvey No 126 Hissa No 130-12-2025 00:00:00
Tulsi Aahan - B WingRaj GroupS No 39, H No 1,230-12-2022 00:00:00
Rajoba SolitaireM/S. Gangadhar Associates58B/1A, Sector Ii, Tikka No. 2 Village Thane30-06-2026 00:00:00
Shree Gajanan Enterprises Rukhmini ChsShree Gajanan Enterprises Rukhmini ChsPlot No. 331-07-2026 00:00:00
Dosti West County - Phase 5 - Dosti Olive - Wing ADosti EnterprisesSurvey No 16/10/A/1(Pt), 16/9/A(Pt), 16/8/A(Pt)30-09-2028 00:00:00
Ganesh Villa ChslBhavani EnterprisesSurvey No 7A/4/A/330-06-2026 00:00:00
Project Details
  • Project:
    Corner Stone
  • Location:
  • Survey No.31, Hissa No. 05
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Sarvodaya Amrut Llp
  • Phone:
  • Address:
  • Building No -3, Sarvodaya Garden
Project RERA Details
MAHA REARA No: P51700032175
Project Type Others
RERA Project Status New
Architect Beyond I Design Studio
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 29 Apr 2022
Last Retrived 26 Jul 2025
Corner Stone QR Code
Corner Stone
MahaRERA - P51700032175
Apartment Details & Configuration
TypeArea
1 BHK39.95 Sq.mts. ( 430 Sq.ft. )
1 BHK41.16 Sq.mts. ( 443 Sq.ft. )
1 BHK42.74 Sq.mts. ( 460 Sq.ft. )
1 BHK43.29 Sq.mts. ( 466 Sq.ft. )
1 BHK43.76 Sq.mts. ( 471 Sq.ft. )
1 BHK44.13 Sq.mts. ( 475 Sq.ft. )
2 BHK58.82 Sq.mts. ( 633 Sq.ft. )
Office space168.12 Sq.mts. ( 1810 Sq.ft. )
Office space168.19 Sq.mts. ( 1810 Sq.ft. )
Office space53.38 Sq.mts. ( 575 Sq.ft. )
Office space53.67 Sq.mts. ( 578 Sq.ft. )
Office space42.79 Sq.mts. ( 461 Sq.ft. )
Office space42.8 Sq.mts. ( 461 Sq.ft. )
Office space43.17 Sq.mts. ( 465 Sq.ft. )
Office space43.21 Sq.mts. ( 465 Sq.ft. )
Office space30.66 Sq.mts. ( 330 Sq.ft. )
Office space34.31 Sq.mts. ( 369 Sq.ft. )
Office space34.39 Sq.mts. ( 370 Sq.ft. )
Office space37.96 Sq.mts. ( 409 Sq.ft. )
Shop38.56 Sq.mts. ( 415 Sq.ft. )
Shop13.92 Sq.mts. ( 150 Sq.ft. )
Shop15.2 Sq.mts. ( 164 Sq.ft. )
Shop15.89 Sq.mts. ( 171 Sq.ft. )
Shop26.39 Sq.mts. ( 284 Sq.ft. )
Shop26.61 Sq.mts. ( 286 Sq.ft. )
Shop27.14 Sq.mts. ( 292 Sq.ft. )
Shop43.81 Sq.mts. ( 472 Sq.ft. )
Shop169.69 Sq.mts. ( 1827 Sq.ft. )
1 BHK41.81 Sq.mts. ( 450 Sq.ft. )
Office space83.28 Sq.mts. ( 896 Sq.ft. )
Office space39.14 Sq.mts. ( 421 Sq.ft. )
Office space44.18 Sq.mts. ( 476 Sq.ft. )
Office space53.49 Sq.mts. ( 576 Sq.ft. )
Office space53.55 Sq.mts. ( 576 Sq.ft. )
Office space57.67 Sq.mts. ( 621 Sq.ft. )
Office space57.7 Sq.mts. ( 621 Sq.ft. )
Office space43.8 Sq.mts. ( 471 Sq.ft. )
Office space42.7 Sq.mts. ( 460 Sq.ft. )
Office space30.65 Sq.mts. ( 330 Sq.ft. )
Office space35.89 Sq.mts. ( 386 Sq.ft. )
Office space35.91 Sq.mts. ( 387 Sq.ft. )
Office space95.69 Sq.mts. ( 1030 Sq.ft. )
Shop117.47 Sq.mts. ( 1264 Sq.ft. )
Shop36.52 Sq.mts. ( 393 Sq.ft. )
Shop31.28 Sq.mts. ( 337 Sq.ft. )
Shop14.8 Sq.mts. ( 159 Sq.ft. )
Shop18.35 Sq.mts. ( 198 Sq.ft. )
Shop23.69 Sq.mts. ( 255 Sq.ft. )
Shop23.75 Sq.mts. ( 256 Sq.ft. )
Shop23.88 Sq.mts. ( 257 Sq.ft. )
Shop26.53 Sq.mts. ( 286 Sq.ft. )
Shop26.57 Sq.mts. ( 286 Sq.ft. )
Shop28.53 Sq.mts. ( 307 Sq.ft. )
Shop58.6 Sq.mts. ( 631 Sq.ft. )
Shop86 Sq.mts. ( 926 Sq.ft. )
2 BHK45.26 Sq.mts. ( 487 Sq.ft. )
2 BHK50.89 Sq.mts. ( 548 Sq.ft. )
2 BHK58.05 Sq.mts. ( 625 Sq.ft. )
2 BHK58.83 Sq.mts. ( 633 Sq.ft. )
2 BHK62.75 Sq.mts. ( 675 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Corner Stonelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Approved Plan
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Approved Plan
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Approved Plan
Landscaping & Tree Planting
As Per Approved Plan
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)10% completed
10% Complete
As Per Approved Plan
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Approved Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting10% completed
10% Complete
As Per Approved Plan
Water Supply
As Per Approved Plan
Buildings / Wings in Corner Stone
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Corner Stone by Sarvodaya Amrut Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

70370 Sq. ft.

Project Area

7487 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

299 apartments in total
Total
299
Booked
179
Available
120

Saleable Area Statistics (Sq. ft.)

153418 Total
Total
153418
Booked
89760
Available
63658
Total 299 apartments in project. 179 apartments booked. 59% apartments booked.
Total 153418 Sq.ft. saleable area. 89760 saleable area booked.
59% area booked.

Building 1-A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 1-A WingDec 2026181010028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.95 Sq.mts. ( 430 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK41.16 Sq.mts. ( 443 Sq.ft. )9
5 Booked55% Booked
55% Booked
1 BHK42.74 Sq.mts. ( 460 Sq.ft. )24
6 Booked25% Booked
25% Booked
1 BHK43.29 Sq.mts. ( 466 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK43.76 Sq.mts. ( 471 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK44.13 Sq.mts. ( 475 Sq.ft. )16
9 Booked56% Booked
56% Booked
2 BHK58.82 Sq.mts. ( 633 Sq.ft. )23
22 Booked95% Booked
95% Booked
Office space168.12 Sq.mts. ( 1810 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space168.19 Sq.mts. ( 1810 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space53.38 Sq.mts. ( 575 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space53.67 Sq.mts. ( 578 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space42.79 Sq.mts. ( 461 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space42.8 Sq.mts. ( 461 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space43.17 Sq.mts. ( 465 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space43.21 Sq.mts. ( 465 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space30.66 Sq.mts. ( 330 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space34.31 Sq.mts. ( 369 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space34.39 Sq.mts. ( 370 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space37.96 Sq.mts. ( 409 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop38.56 Sq.mts. ( 415 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.92 Sq.mts. ( 150 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop15.2 Sq.mts. ( 164 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop15.89 Sq.mts. ( 171 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.39 Sq.mts. ( 284 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.61 Sq.mts. ( 286 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop27.14 Sq.mts. ( 292 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop43.81 Sq.mts. ( 472 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop169.69 Sq.mts. ( 1827 Sq.ft. )1
None Booked0% Booked
0% Booked
99 total apartments / 59 apartments booked. 59% apartments booked.
Work Description in Building Building 1-A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress54% done
54% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress35% done
35% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress35% done
35% Booked

Building 1-B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 1-B WingDec 2026181010028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.95 Sq.mts. ( 430 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK41.16 Sq.mts. ( 443 Sq.ft. )12
3 Booked25% Booked
25% Booked
1 BHK41.81 Sq.mts. ( 450 Sq.ft. )29
22 Booked75% Booked
75% Booked
1 BHK42.74 Sq.mts. ( 460 Sq.ft. )25
9 Booked36% Booked
36% Booked
1 BHK44.13 Sq.mts. ( 475 Sq.ft. )19
5 Booked26% Booked
26% Booked
2 BHK58.82 Sq.mts. ( 633 Sq.ft. )26
22 Booked84% Booked
84% Booked
Office space83.28 Sq.mts. ( 896 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space39.14 Sq.mts. ( 421 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space44.18 Sq.mts. ( 476 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space53.49 Sq.mts. ( 576 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space53.55 Sq.mts. ( 576 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space57.67 Sq.mts. ( 621 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space57.7 Sq.mts. ( 621 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space42.79 Sq.mts. ( 461 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space43.76 Sq.mts. ( 471 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space43.8 Sq.mts. ( 471 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space42.7 Sq.mts. ( 460 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space30.65 Sq.mts. ( 330 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space35.89 Sq.mts. ( 386 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space35.91 Sq.mts. ( 387 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space95.69 Sq.mts. ( 1030 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop117.47 Sq.mts. ( 1264 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop36.52 Sq.mts. ( 393 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop31.28 Sq.mts. ( 337 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.8 Sq.mts. ( 159 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.35 Sq.mts. ( 198 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop23.69 Sq.mts. ( 255 Sq.ft. )3
3 Booked100% Booked
100% Booked
Shop23.75 Sq.mts. ( 256 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop23.88 Sq.mts. ( 257 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.53 Sq.mts. ( 286 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.57 Sq.mts. ( 286 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop28.53 Sq.mts. ( 307 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop58.6 Sq.mts. ( 631 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop86 Sq.mts. ( 926 Sq.ft. )1
None Booked0% Booked
0% Booked
145 total apartments / 80 apartments booked. 55% apartments booked.
Work Description in Building Building 1-B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress54% done
54% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress35% done
35% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress35% done
35% Booked

Building 2-C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 2-C WingDec 2026181010028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK45.26 Sq.mts. ( 487 Sq.ft. )11
8 Booked72% Booked
72% Booked
2 BHK50.89 Sq.mts. ( 548 Sq.ft. )9
7 Booked77% Booked
77% Booked
2 BHK58.05 Sq.mts. ( 625 Sq.ft. )6
3 Booked50% Booked
50% Booked
26 total apartments / 18 apartments booked. 69% apartments booked.
Work Description in Building Building 2-C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress71% done
71% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress71% done
71% Booked

Building 2-D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 2-D WingDec 202618101101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK45.26 Sq.mts. ( 487 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK50.89 Sq.mts. ( 548 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHK58.05 Sq.mts. ( 625 Sq.ft. )6
4 Booked66% Booked
66% Booked
2 BHK58.83 Sq.mts. ( 633 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK62.75 Sq.mts. ( 675 Sq.ft. )2
None Booked0% Booked
0% Booked
29 total apartments / 22 apartments booked. 75% apartments booked.
Work Description in Building Building 2-D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress67% done
67% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress67% done
67% Booked
Channel Partners
Channel Partners Registered by Developer
Sarvodaya Amrut Llp
for Project
Corner Stone
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation