Project overview

Commanders Heera Siddhi Homes is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000017262. Commanders Heera Siddhi Homes is located at Survey No. 15, Hissa 1. This is a New being developed by Megaplex Properties Llp.

Commanders Heera Siddhi Homes has 2 BHK Apartments with carpet areas ranging from 541 to 541 Sq.ft. Carpet. The Project has total 220 of which 216 are currently available for sale.

Commanders Heera Siddhi Homes is being developed on a total land area of 124862 Sq.ft. out of which 13294 Sq.ft. i.e 11% is reserved for recreational purposes. Commanders Heera Siddhi Homes has 6 Wings / Towers Rh 1 To Rh 9,Rh 10 To Rh 18,Rh 19 To Rh 28,Wing A3,Wing A4,Wing A5

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Commanders Heera Siddhi Homes
  • Location:
  • Survey No. 15, Hissa 1
  • Const. Stage:
    New
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Megaplex Properties Llp
  • Phone:
  • Address:
  • Shree Durga Apartment,
Project RERA Details
MAHA REARA No: P52000017262
Project Type Residential / Group Housing
RERA Project Status New
Architect Ar Dharmesh V Bhalani
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 Jan 2024
Last Retrived 28 Jul 2025
Commanders Heera Siddhi Homes QR Code
Commanders Heera Siddhi Homes
MahaRERA - P52000017262
Apartment Details & Configuration
TypeArea
2 BHK52.71 Sq.mts. ( 567 Sq.ft. )
2 BHK50.29 Sq.mts. ( 541 Sq.ft. )
2 BHK50.49 Sq.mts. ( 543 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Commanders Heera Siddhi Homeslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
1235.572 Sqmtrs
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Commenced
Energy management
Na
Fire Protection And Fire Safety Requirements
Not Commenced
Landscaping & Tree Planting
Not Commenced
Open Parking
111 Cars
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Commenced
Solid Waste Management And Disposal
Na
Storm Water Drains
Not Commenced
Street Lighting
Not Commenced
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Not Commenced
Water Supply
Not Commenced
Buildings / Wings in Commanders Heera Siddhi Homes
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Commanders Heera Siddhi Homes by Megaplex Properties Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.

124862 Sq. ft.

Project Area

13294 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

220 apartments in total
Total
220
Booked
4
Available
216

Saleable Area Statistics (Sq. ft.)

119923 Total
Total
119923
Booked
2269
Available
117654
Total 220 apartments in project. 4 apartments booked. 1% apartments booked.
Total 119923 Sq.ft. saleable area. 2269 saleable area booked.
2% area booked.

Rh 1 To Rh 9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rh 1 To Rh 9Dec 20212100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK52.71 Sq.mts. ( 567 Sq.ft. )9
3 Booked33% Booked
33% Booked
9 total apartments / 3 apartments booked. 33% apartments booked.
Work Description in Building Rh 1 To Rh 9Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Rh 10 To Rh 18

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rh 10 To Rh 18Dec 20212100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
ROW HOUSE52.71 Sq.mts. ( 567 Sq.ft. )9
9 total apartments / 1 apartments booked. 11% apartments booked.
Work Description in Building Rh 10 To Rh 18Completion
Basement (if any)
work-in-progress40% done
40% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress40% done
40% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Rh 19 To Rh 28

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rh 19 To Rh 28Dec 20212100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
ROW HOUSE52.71 Sq.mts. ( 567 Sq.ft. )10
None Booked0% Booked
0% Booked
10 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Rh 19 To Rh 28Completion
Basement (if any)
work-in-progress40% done
40% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress40% done
40% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing A3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A3Dec 2021131010017
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK50.29 Sq.mts. ( 541 Sq.ft. )72
None Booked0% Booked
0% Booked
72 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing A3Completion
Basement (if any)
work-in-progress20% done
20% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress20% done
20% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing A4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A4Dec 2021131010011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK50.49 Sq.mts. ( 543 Sq.ft. )48
None Booked0% Booked
0% Booked
48 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing A4Completion
Basement (if any)
work-in-progress40% done
40% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress40% done
40% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing A5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A5Dec 2021131010017
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK50.29 Sq.mts. ( 541 Sq.ft. )72
None Booked0% Booked
0% Booked
72 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing A5Completion
Basement (if any)
work-in-progress40% done
40% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress40% done
40% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Megaplex Properties Llp
for Project
Commanders Heera Siddhi Homes
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation