Project overview

Chembur Manshanti Chsl is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800010509. Chembur Manshanti Chsl is located at Plot No 10 Survey No 14 A Cts No 56. This is a Ongoing being developed by Menorah Realties Private Limited.

Chembur Manshanti Chsl has RESIDENTIAL & SHOP Apartments with carpet areas ranging from 209 to 990 Sq.ft. Carpet. The Project has total 48 of which 12 are currently available for sale.

Chembur Manshanti Chsl is being developed on a total land area of 6001 Sq.ft. Chembur Manshanti Chsl has 1 Wings / Towers Chembur Manshanti Chsl

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Chembur Manshanti Chsl
  • Location:
  • Plot No 10 Survey No 14 A Cts No 56
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Menorah Realties Private Limited
  • Phone:
  • Address:
  • Titan House
Project RERA Details
MAHA REARA No: P51800010509
Project Type Others
RERA Project Status Ongoing
Architect Space Moulders
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession
Litigations No Litigations
Last Modified 31 Aug 2017
Last Retrived 26 Jul 2025
Chembur Manshanti Chsl QR Code
Chembur Manshanti Chsl
MahaRERA - P51800010509
Apartment Details & Configuration
TypeArea
RESIDENTIAL64.35 Sq.mts. ( 693 Sq.ft. )
RESIDENTIAL71.09 Sq.mts. ( 765 Sq.ft. )
RESIDENTIAL77.02 Sq.mts. ( 829 Sq.ft. )
RESIDENTIAL86.56 Sq.mts. ( 932 Sq.ft. )
RESIDENTIAL91.94 Sq.mts. ( 990 Sq.ft. )
SHOP19.44 Sq.mts. ( 209 Sq.ft. )
SHOP20.62 Sq.mts. ( 222 Sq.ft. )
SHOP21.57 Sq.mts. ( 232 Sq.ft. )
SHOP28.61 Sq.mts. ( 308 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Chembur Manshanti Chsllast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station95% completed
95% Complete
Meter Room Completed Substation Balance
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting70% completed
70% Complete
Part Tree Planting Balance
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Vermiculture Bin
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Surfacedrainwaterdivertedthroughopendrainto Ground
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Chembur Manshanti Chsl
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Chembur Manshanti Chsl by Menorah Realties Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

6001 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

48 apartments in total
Total
48
Booked
36
Available
12

Saleable Area Statistics (Sq. ft.)

36002 Total
Total
36002
Booked
25256
Available
10746
Total 48 apartments in project. 36 apartments booked. 75% apartments booked.
Total 36002 Sq.ft. saleable area. 25256 saleable area booked.
70% area booked.

Chembur Manshanti Chsl

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Chembur Manshanti ChslJan 1900121110034
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL64.35 Sq.mts. ( 693 Sq.ft. )9
9 Booked100% Booked
100% Booked
RESIDENTIAL71.09 Sq.mts. ( 765 Sq.ft. )5
1 Booked20% Booked
20% Booked
RESIDENTIAL77.02 Sq.mts. ( 829 Sq.ft. )18
18 Booked100% Booked
100% Booked
RESIDENTIAL86.56 Sq.mts. ( 932 Sq.ft. )5
1 Booked20% Booked
20% Booked
RESIDENTIAL91.94 Sq.mts. ( 990 Sq.ft. )5
1 Booked20% Booked
20% Booked
SHOP19.44 Sq.mts. ( 209 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP20.62 Sq.mts. ( 222 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP21.57 Sq.mts. ( 232 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP28.61 Sq.mts. ( 308 Sq.ft. )1
1 Booked100% Booked
100% Booked
48 total apartments / 36 apartments booked. 75% apartments booked.
Work Description in Building Chembur Manshanti ChslCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress98% done
98% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress98% done
98% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Menorah Realties Private Limited
for Project
Chembur Manshanti Chsl
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation