Project overview

Charms Padamavati Royal Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700045389. Charms Padamavati Royal Phase 2 is located at 89/1A. This is a New being developed by Charms Developers.

Charms Padamavati Royal Phase 2 has 1 BHK Apartments with carpet areas ranging from 323 to 323 Sq.ft. Carpet. The Project has total 740 of which 739 are currently available for sale.

Charms Padamavati Royal Phase 2 is being developed on a total land area of 241577 Sq.ft. out of which 20028 Sq.ft. i.e 8% is reserved for recreational purposes. Charms Padamavati Royal Phase 2 has 7 Wings / Towers Amenity Building,Bldg - 1,Bldg - 2,Bldg - 3,Bldg - 7,Bldg - 8,Bldg - 9

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Charms Padamavati Royal Phase 2
  • Location:
  • 89/1A
  • Const. Stage:
    New
  • Possession:
    30 Apr 2027
Developer Details

  • Developer:
    Charms Developers
  • Phone:
  • Address:
  • Dev Corpora Building
Project RERA Details
MAHA REARA No: P51700045389
Project Type Residential / Group Housing
RERA Project Status New
Architect Sajid Abdul Majid Momin
Funding Bank HDFC BANK
Proposed Possession 30 Apr 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 18 May 2022
Last Retrived 26 Jul 2025
Charms Padamavati Royal Phase 2 QR Code
Charms Padamavati Royal Phase 2
MahaRERA - P51700045389
Apartment Details & Configuration
TypeArea
Centre300 Sq.mts. ( 3229 Sq.ft. )
Shop18.34 Sq.mts. ( 197 Sq.ft. )
Shop18.35 Sq.mts. ( 198 Sq.ft. )
Shop18.72 Sq.mts. ( 202 Sq.ft. )
Shop26.19 Sq.mts. ( 282 Sq.ft. )
1 BHK30 Sq.mts. ( 323 Sq.ft. )
Res Shop 17.69 Sq.mts. ( 83 Sq.ft. )
Res Shop 27.44 Sq.mts. ( 80 Sq.ft. )
Res Shop 312.74 Sq.mts. ( 137 Sq.ft. )
Res Shop 411 Sq.mts. ( 118 Sq.ft. )
Res Shop 57.68 Sq.mts. ( 83 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Charms Padamavati Royal Phase 2last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Recreational Ground
Community Buildings
Club House
Electrical Meter Room, Sub-Station, Receiving Station
Meter Rooms
Energy management
Solar
Fire Protection And Fire Safety Requirements
Fire Safety
Landscaping & Tree Planting
Tree Plantation
Open Parking
Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Chamber Lines
SOLAR
Na
Solid Waste Management And Disposal
Disposal
Storm Water Drains
Drains
Street Lighting
Street Light
Treatment And Disposal Of Sewage And Sullage Water
Stp
Water Conservation, Rain water Harvesting
Coservation
Water Supply
Pipelines
Buildings / Wings in Charms Padamavati Royal Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Charms Padamavati Royal Phase 2 by Charms Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

241577 Sq. ft.

Project Area

20028 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

740 apartments in total
Total
740
Booked
1
Available
739

Saleable Area Statistics (Sq. ft.)

232695 Total
Total
232695
Booked
323
Available
232372
Total 740 apartments in project. 1 apartments booked. 0% apartments booked.
Total 232695 Sq.ft. saleable area. 323 saleable area booked.
0% area booked.

Amenity Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Amenity BuildingApr 202731000250
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Centre300 Sq.mts. ( 3229 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop18.34 Sq.mts. ( 197 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop18.35 Sq.mts. ( 198 Sq.ft. )16
None Booked0% Booked
0% Booked
Shop18.72 Sq.mts. ( 202 Sq.ft. )16
None Booked0% Booked
0% Booked
Shop26.19 Sq.mts. ( 282 Sq.ft. )2
None Booked0% Booked
0% Booked
38 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Amenity BuildingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Bldg - 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg - 1Apr 2027111010814
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30 Sq.mts. ( 323 Sq.ft. )130
None Booked0% Booked
0% Booked
Res Shop 17.69 Sq.mts. ( 83 Sq.ft. )2
None Booked0% Booked
0% Booked
Res Shop 27.44 Sq.mts. ( 80 Sq.ft. )2
None Booked0% Booked
0% Booked
Res Shop 312.74 Sq.mts. ( 137 Sq.ft. )4
None Booked0% Booked
0% Booked
Res Shop 411 Sq.mts. ( 118 Sq.ft. )2
None Booked0% Booked
0% Booked
Res Shop 57.68 Sq.mts. ( 83 Sq.ft. )2
None Booked0% Booked
0% Booked
142 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg - 1Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Bldg - 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg - 2Apr 2027111010814
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30 Sq.mts. ( 323 Sq.ft. )130
None Booked0% Booked
0% Booked
Res Shop 17.69 Sq.mts. ( 83 Sq.ft. )2
None Booked0% Booked
0% Booked
Res Shop 27.44 Sq.mts. ( 80 Sq.ft. )2
None Booked0% Booked
0% Booked
Res Shop 312.74 Sq.mts. ( 137 Sq.ft. )4
None Booked0% Booked
0% Booked
Res Shop 411 Sq.mts. ( 118 Sq.ft. )2
None Booked0% Booked
0% Booked
Res Shop 57.68 Sq.mts. ( 83 Sq.ft. )2
None Booked0% Booked
0% Booked
142 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg - 2Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Bldg - 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg - 3Apr 20277101008
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30 Sq.mts. ( 323 Sq.ft. )92
None Booked0% Booked
0% Booked
92 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg - 3Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Bldg - 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg - 7Apr 2027111010814
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30 Sq.mts. ( 323 Sq.ft. )130
None Booked0% Booked
0% Booked
Res Shop 17.69 Sq.mts. ( 83 Sq.ft. )2
None Booked0% Booked
0% Booked
Res Shop 27.44 Sq.mts. ( 80 Sq.ft. )2
None Booked0% Booked
0% Booked
Res Shop 312.74 Sq.mts. ( 137 Sq.ft. )4
None Booked0% Booked
0% Booked
Res Shop 411 Sq.mts. ( 118 Sq.ft. )2
None Booked0% Booked
0% Booked
Res Shop 57.68 Sq.mts. ( 83 Sq.ft. )2
None Booked0% Booked
0% Booked
142 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg - 7Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Bldg - 8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg - 8Apr 20277101008
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30 Sq.mts. ( 323 Sq.ft. )92
None Booked0% Booked
0% Booked
92 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg - 8Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Bldg - 9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg - 9Apr 20277101008
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30 Sq.mts. ( 323 Sq.ft. )92
92 total apartments / 1 apartments booked. 1% apartments booked.
Work Description in Building Bldg - 9Completion
Basement (if any)
work-in-progress40% done
40% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress40% done
40% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress40% done
40% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Charms Developers
for Project
Charms Padamavati Royal Phase 2
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation