Project overview

Charkop Nandanvan Chsl is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800050125. Charkop Nandanvan Chsl is located at 3A/2/85. This is a New being developed by Jadeite Developers Llp.

Charkop Nandanvan Chsl has A WING 1 BHK, A WING 1 BHK EX MEMB, A WING 2 BHK, B WING 1 BHK, B WING 1 BHK EX MEMB, B WING 2 BHK & B WING 2 BHK EX MEMB Apartments with carpet areas ranging from 400 to 645 Sq.ft. Carpet. The Project has total 186 of which 74 are currently available for sale.

Charkop Nandanvan Chsl is being developed on a total land area of 15559 Sq.ft. Charkop Nandanvan Chsl has 1 Wings / Towers Charkop Nandanvan Chsl

ProjectDeveloperLocationPossession
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
Shree Saishraddha Apartment Building AShree Saishraddha EnterprisesSurvey No 9/3 And 16/130-03-2023 00:00:00
Pinnacolo NxSkd Realty LlpOld S.No.445,New S.No.12930-06-2025 00:00:00
Akshar Business Park- Phase IiiAkshar DevelopersPlot No. 3, Sector-2531-07-2022 00:00:00
Swaraj OrchidM/S Crystal HomesSurvey No 25 Hissa No 230-12-2022 00:00:00
Surya ComplexM/S. Jai Santoshi Maa EnterprisesS. No. 102, H. No.2, 3 Pt, 5, 17, 1830-06-2023 00:00:00
19 EastMoreshwar Developers5230-12-2025 00:00:00
Reliance GoldGolden EnterprisesS No 58/1/4 S No 59/128-02-2028 00:00:00
Basera HeightsKamruddin Hasmullah SiddiqueOld Sno 223/5 221/1 New Sno 191/5 190/130-03-2024 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Siddhivinayak GardensA1 Buildcon991, 2, 3 And 1001830-12-2024 00:00:00
Shree ShaliniJay Service And ConsultantCts No 251 And 252A30-09-2023 00:00:00
M Square It ParkPaper FlutingsA241 And A24230-03-2024 00:00:00
Shree Ganesh SymphonyPawar GroupS. No.172, H.No.1/801-12-2025 00:00:00
Trimurti GardenSai Narayan DevelopersSurvey No 126 Hissa No 130-12-2025 00:00:00
Tulsi Aahan - B WingRaj GroupS No 39, H No 1,230-12-2022 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Balaji AnnexM/S Om Swayambhu Siddhivinayak Builders And DevelopersSurvey No 93/3, 93/4, 93/530-12-2026 00:00:00
Arya ArianaAshapura Corporation5664/A30-03-2024 00:00:00
GajananGk BuildconB6330-06-2023 00:00:00
Empire Industrial Centrum Phase-IiiEmpire Industries Limited22R30-03-2026 00:00:00
Empire Industrial Centrum Phase-IvEmpire Industries Limited2230-03-2025 00:00:00
Seasons Sahara Building No 2Samarth Sai Builders & DevelopersS No 24/2 At Village Adavli-Dhokli Taluka Ambernath And S No 34/10, 34/11, 34/12 At Village Pisavli Taluka Kalyan30-12-2024 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
Rajeshwari Residency Phase IiShree Siddhi ConstructionSurvey No 30/2, 30/3/2/1, 30/3/2/230-03-2025 00:00:00
Pinnacle RoyalPinnacle InfraGut No41, Hissa No 20, Plot No 1530-03-2023 00:00:00
Kohinoor AashiyanaKgi Realty Private Limited24/3 37/130-10-2024 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Platinum Square B 1Radmin Developers & Consultants Private Limited21/2,21/3/1,22/1/2,1/3,1/5,1/6,1/830-05-2025 00:00:00
Aditya NishantPremnarayan Shukla14229-01-2023 00:00:00
Ten X Habitat Raymond Realty Tower JRaymond Limited126B 1/1 Part, 129/1 Part30-06-2025 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Shivaay AvyaanShreeram BuildconNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
Shubh Mangalam Phase IiShubh RealitySr No 106 Hissa No 125-12-2026 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Sai CityOm Sai Builders & DevelopersSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
Marathon Nextown JasperMarathon Ener-Gen140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanS No 112/130-06-2024 00:00:00
Siyara Fortune Building A Wing BShakti Realty8145, 8146, 8153, 8172, 8176 To 820231-12-2027 00:00:00
Satyaneelayam Co Op Hsg SocietyYash Infra749 B31-12-2025 00:00:00
Aai Mauli ParkHendar Laxman MhatreS. No. 1731-12-2025 00:00:00
Shubham Monolith D WingGaurivinayak Builders And Developers Pvt LtdSurvey No 30 Hissa No 15A31-12-2026 00:00:00
Project Details
  • Project:
    Charkop Nandanvan Chsl
  • Location:
  • 3A/2/85
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Jadeite Developers Llp
  • Phone:
  • Address:
  • Prathmesh Vihar
Project RERA Details
MAHA REARA No: P51800050125
Project Type Residential / Group Housing
RERA Project Status New
Architect Ramesh B Khanolkar
Funding Bank AU SMALL FINANCE BANK LIMITED
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 25 Apr 2025
Last Retrived 26 Jul 2025
Charkop Nandanvan Chsl QR Code
Charkop Nandanvan Chsl
MahaRERA - P51800050125
Apartment Details & Configuration
TypeArea
A WING 1 BHK37.16 Sq.mts. ( 400 Sq.ft. )
A WING 1 BHK38.93 Sq.mts. ( 419 Sq.ft. )
A WING 1 BHK40.41 Sq.mts. ( 435 Sq.ft. )
A WING 1 BHK40.69 Sq.mts. ( 438 Sq.ft. )
A WING 1 BHK59.92 Sq.mts. ( 645 Sq.ft. )
A WING 2 BHK47.29 Sq.mts. ( 509 Sq.ft. )
B WING 1 BHK37.35 Sq.mts. ( 402 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Charkop Nandanvan Chsllast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station10% completed
10% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements2% completed
2% Complete
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)25% completed
25% Complete
Na
Solid Waste Management And Disposal80% completed
80% Complete
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Charkop Nandanvan Chsl
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Charkop Nandanvan Chsl by Jadeite Developers Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

15559 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

186 apartments in total
Total
186
Booked
112
Available
74

Saleable Area Statistics (Sq. ft.)

88122 Total
Total
88122
Booked
49772
Available
38350
Total 186 apartments in project. 112 apartments booked. 60% apartments booked.
Total 88122 Sq.ft. saleable area. 49772 saleable area booked.
56% area booked.

Charkop Nandanvan Chsl

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Charkop Nandanvan ChslDec 2026221000083
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
A WING 1 BHK37.16 Sq.mts. ( 400 Sq.ft. )21
20 Booked95% Booked
95% Booked
A WING 1 BHK38.93 Sq.mts. ( 419 Sq.ft. )13
4 Booked30% Booked
30% Booked
A WING 1 BHK40.41 Sq.mts. ( 435 Sq.ft. )19
16 Booked84% Booked
84% Booked
A WING 1 BHK40.69 Sq.mts. ( 438 Sq.ft. )19
12 Booked63% Booked
63% Booked
A WING 1 BHK59.92 Sq.mts. ( 645 Sq.ft. )1
None Booked0% Booked
0% Booked
A WING 1 BHK EX MEMB40.69 Sq.mts. ( 438 Sq.ft. )1
None Booked0% Booked
0% Booked
A WING 1 BHK EX MEMB40.41 Sq.mts. ( 435 Sq.ft. )1
None Booked0% Booked
0% Booked
A WING 2 BHK47.29 Sq.mts. ( 509 Sq.ft. )1
1 Booked100% Booked
100% Booked
B WING 1 BHK38.93 Sq.mts. ( 419 Sq.ft. )34
29 Booked85% Booked
85% Booked
B WING 1 BHK37.35 Sq.mts. ( 402 Sq.ft. )18
17 Booked94% Booked
94% Booked
B WING 1 BHK EX MEMB37.35 Sq.mts. ( 402 Sq.ft. )4
None Booked0% Booked
0% Booked
B WING 1 BHK EX MEMB38.93 Sq.mts. ( 419 Sq.ft. )10
None Booked0% Booked
0% Booked
B WING 2 BHK59.92 Sq.mts. ( 645 Sq.ft. )15
13 Booked86% Booked
86% Booked
B WING 2 BHK EX MEMB59.92 Sq.mts. ( 645 Sq.ft. )29
None Booked0% Booked
0% Booked
186 total apartments / 112 apartments booked. 60% apartments booked.
Work Description in Building Charkop Nandanvan ChslCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Jadeite Developers Llp
for Project
Charkop Nandanvan Chsl
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation