Project overview

Centrio-By Mj Shah is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800012170. Centrio-By Mj Shah is located at Cts No. 7Pt. This is a Ongoing being developed by Lakadawala Developers Pvt Ltd.

Centrio-By Mj Shah has 1 BHK, 2 BHK OPTIMA & 2 BHK ULTIMA Apartments with carpet areas ranging from 389 to 627 Sq.ft. Carpet. The Project has total 461 of which 307 are currently available for sale.

Centrio-By Mj Shah is being developed on a total land area of 202790 Sq.ft. out of which 12767 Sq.ft. i.e 6% is reserved for recreational purposes. Centrio-By Mj Shah has 3 Wings / Towers A Wing,Wing B,Wing C

ProjectDeveloperLocationPossession
Manhattan Residency (A4) - 15Th To 18Th FloorRare Townships Private Limited194 B30-12-2024 00:00:00
Crystal Armus A To CSterling Buildcon Pvt Ltd282, 283/2, 110Pt, 339Pt, 279Pt, 284/1 To 5, 283, 280Pt, 281Pt, 282/2, 283/1, 282/1, 282/330-12-2023 00:00:00
Atlanta Heights (A3) - 15Th To 18Th FloorRare Townships Private Limited194 B30-12-2024 00:00:00
Houston Residency (A2) - 19Th FloorRare Townships Private Limited194B30-12-2024 00:00:00
Houston Residency (A2) - 15Th To 18Th FloorRare Townships Private Limited194 B30-12-2024 00:00:00
Detroit Residency (A5) - 19Th FloorRare Townships Private Limited194B30-12-2024 00:00:00
Houston Residency (A2) - Upto 14Th FloorRare Townships Private Limited194B30-12-2024 00:00:00
India International Tower (A6) - Upto 13Th FloorRare Townships Private Limited194 B30-12-2026 00:00:00
Manhattan Residency (A4) - 19Th FloorRare Township Private Limited194 B30-12-2024 00:00:00
North Sea Heights (A1) - 15Th To 18Th FloorRare Townships Private Limited194B30-12-2024 00:00:00
North Sea Heights (A1) - 19Th FloorRare Townships Private Limited194 B30-12-2024 00:00:00
North Sea Heights (A1) - Upto 14Th FloorRare Townships Private Limited194 B30-12-2024 00:00:00
Detroit Residency (A5) - 15Th To 18Th FloorRare Townships Private Limited194 B30-12-2024 00:00:00
Atlanta Heights (A3) - Upto 14Th FloorRare Townships Private Limited194 B30-12-2024 00:00:00
Detroit Residency (A5) - Upto 14Th FloorRare Townships Private Limited194B, No. 2430-12-2024 00:00:00
Manhattan Residency (A4) - Upto 14Th FloorRare Townships Private Limited194 B30-12-2024 00:00:00
Sabari Sangam Wing AMeraki Habitats LlpCts No 102 Village Deonar31-12-2018 00:00:00
Project Details
  • Project:
    Centrio-By Mj Shah
  • Location:
  • Cts No. 7Pt
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Lakadawala Developers Pvt Ltd
  • Phone:
  • Address:
  • Lathiwala Apartment
Project RERA Details
MAHA REARA No: P51800012170
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Sameer Kulkarni
Funding Bank AXIS BANK
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 13 Sep 2019
Last Retrived 26 Jul 2025
Centrio-By Mj Shah QR Code
Centrio-By Mj Shah
MahaRERA - P51800012170
Apartment Details & Configuration
TypeArea
1 BHK36.15 Sq.mts. ( 389 Sq.ft. )
2 BHK OPTIMA45.14 Sq.mts. ( 486 Sq.ft. )
2 BHK ULTIMA58.25 Sq.mts. ( 627 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Centrio-By Mj Shahlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Na
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
0
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)93% completed
93% Complete
0
Solid Waste Management And Disposal
0
Storm Water Drains
0
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
0
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Centrio-By Mj Shah
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Centrio-By Mj Shah by Lakadawala Developers Pvt Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

202790 Sq. ft.

Project Area

12767 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

461 apartments in total
Total
461
Booked
154
Available
307

Saleable Area Statistics (Sq. ft.)

245367 Total
Total
245367
Booked
81402
Available
163964
Total 461 apartments in project. 154 apartments booked. 33% apartments booked.
Total 245367 Sq.ft. saleable area. 81402 saleable area booked.
33% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 2020231210080
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.15 Sq.mts. ( 389 Sq.ft. )40
8 Booked20% Booked
20% Booked
2 BHK OPTIMA45.14 Sq.mts. ( 486 Sq.ft. )38
None Booked0% Booked
0% Booked
2 BHK ULTIMA58.25 Sq.mts. ( 627 Sq.ft. )78
156 total apartments / 18 apartments booked. 11% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Excavation
work-in-progress81% done
81% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 2020231210575
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.15 Sq.mts. ( 389 Sq.ft. )36
20 Booked55% Booked
55% Booked
2 BHK OPTIMA45.14 Sq.mts. ( 486 Sq.ft. )38
2 BHK ULTIMA58.25 Sq.mts. ( 627 Sq.ft. )76
34 Booked44% Booked
44% Booked
150 total apartments / 60 apartments booked. 40% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress73% done
73% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress73% done
73% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress77% done
77% Booked
Sanitary Fittings within the flats / premises
work-in-progress77% done
77% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 2020231210080
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.15 Sq.mts. ( 389 Sq.ft. )40
28 Booked70% Booked
70% Booked
2 BHK OPTIMA45.14 Sq.mts. ( 486 Sq.ft. )38
2 BHK ULTIMA58.25 Sq.mts. ( 627 Sq.ft. )77
41 Booked53% Booked
53% Booked
155 total apartments / 76 apartments booked. 49% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress69% done
69% Booked
Sanitary Fittings within the flats / premises
work-in-progress69% done
69% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Lakadawala Developers Pvt Ltd
for Project
Centrio-By Mj Shah
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation