Project overview

Central Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700020076. Central Heights is located at 55 Part, 56 Part, 59 Part. This is a New being developed by Kdc Enterprises.

Central Heights has 1 BHK, 2 BHK, DUPLEX & Shop Apartments with carpet areas ranging from 173 to 526 Sq.ft. Carpet. The Project has total 348 of which 198 are currently available for sale.

Central Heights is being developed on a total land area of 51282 Sq.ft. out of which 11441 Sq.ft. i.e 22% is reserved for recreational purposes. Central Heights has 2 Wings / Towers Central Heights - A - Wing A1, Wing A2,Central Heights - B 1

ProjectDeveloperLocationPossession
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Shivaay AvyaanShreeram BuildconNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
Shubh Mangalam Phase IiShubh RealitySr No 106 Hissa No 125-12-2026 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Sai CityOm Sai Builders & DevelopersSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
Marathon Nextown JasperMarathon Ener-Gen140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanS No 112/130-06-2024 00:00:00
Siyara Fortune Building A Wing BShakti Realty8145, 8146, 8153, 8172, 8176 To 820231-12-2027 00:00:00
Satyaneelayam Co Op Hsg SocietyYash Infra749 B31-12-2025 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Thanekar CivicShree Swami Samarth EnterprisesS No 133, H No 209-04-2024 00:00:00
Saurabh ResidencyM/S Krishna Builders & DevelopersS No 77 , H No 2/1730-06-2024 00:00:00
Ved ParadiseKulkarni And Associates896631-12-2024 00:00:00
Aai Mauli ParkHendar Laxman MhatreS. No. 1731-12-2025 00:00:00
Shubham Monolith D WingGaurivinayak Builders And Developers Pvt LtdSurvey No 30 Hissa No 15A31-12-2026 00:00:00
Godrej Ascend Phase 3Godrej Properties Limited39 Part, 41/1 Part31-10-2029 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Dashmesh ParkSatyam ConstructionsCts No 2340931-03-2023 00:00:00
Shankeshwar DarshanKalpvriksh Homes LlpOld Sno 559 New Sno 207 Hno 1,2 Old Sno 560 New Snio 165 Hno 1Pt31-12-2024 00:00:00
Eknath Heights - 1Omkar EnterprisesSurvey No 123 Hissa No 331-12-2022 00:00:00
Kapleshwara ResidencyKapleshwara Homes Llp119/6C (Old), 84/6C (New)31-12-2029 00:00:00
Sara TowerHope Builders And Developers233 And 23431-12-2026 00:00:00
Vedang Lake CityVedang ConstructionS. No. 4 H. No. 2/1 And S. No. 12 H. No 1/331-12-2025 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
ZenR A ConstructionCts No 2086430-06-2024 00:00:00
Navrang Co Op Hsg SocietyYadav Bros ConstructionPlot No. 3, Gut No 5431-12-2024 00:00:00
Prathamesh ChslNirmal DevelopersSurvey No 26 Hissa No 2A Plot No 3 (Old Plot No.18)31-12-2024 00:00:00
Akankshapurti ChslS R DevelopersSurvey No 32 Hissa No 2A Plot No 1531-12-2024 00:00:00
Celeste 612Hiralal Ramnarayan GuptaC. T. S No 1057 To 1083 At Village Mumbra Dist Thane31-12-2027 00:00:00
Shree Laxmi Narayan PrasadLaxmi Realty93/A/2931-12-2025 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
Infinity Square28-Aeon Infinity LlpC.T.S. No. 434P31-12-2027 00:00:00
Mm Valley D1 D2Alfa Enterprises55/131-12-2028 00:00:00
Pearl ComplexM/S Sai Developers33/1/A & 33/1/B31-12-2026 00:00:00
Aroma HeightsVastu Sai Builders And DevelopersSurvey No 5 (New) 94 (Old) Hissa No 231-12-2028 00:00:00
Regency OnyxRegency Nirman LtdSurvey No 52 Hissa No 13B30-06-2025 00:00:00
Dosti West County - Dosti Nest - Phase 3Dosti Enterprises21(Pt), 22B, 25/5B, 25/6(Pt), 25/7B(Pt), 25/8(Pt), 25/10/A/2(Pt)31-08-2027 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Jay ResidencyMukesh Vithal GiteS.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
Seven HeightsOvais Mudabbir BardiS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino AMacrotech Developers Limited62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
Upper Thane-Iris Wing AMacrotech Developers Limited293/1 And 293/331-12-2027 00:00:00
Jivdani BuildingMildstone Enterprises Llp133231-12-2024 00:00:00
Yashraj HeightsVikrant Vikas Raikar731-01-2025 00:00:00
Ashwin Kirti Co-Op Hsg SocietyVinayak Enterprises DevelopersS.No.17,H.No.3,Plot No.130-06-2024 00:00:00
Gauri Ganpati Co. Operative Housing Society LtdPatel P N & Company53/9C 30/9D10-11-2026 00:00:00
Royal EnclaveOm Developers3/5 And 3/6 Narpoli Bhiwandi31-12-2026 00:00:00
Vardhaman Tower Building Nos. 6 & 7Vardhaman Property DevelopersPlot Bearing Surveyno.26Hissa No1(Part)31-12-2023 00:00:00
Zircon HeightsIqbal Abdul Rauf Punjabi59/1, 83/5 Paiki, Cts No 482931-12-2024 00:00:00
ZenNeelkanth Realtors Pvt Ltd194/1B- Part -Under Reservation For Housing The Dishoused31-12-2026 00:00:00
Vedant Empire Phase Iii Wing C-ClifftonMohan Hardasmal TharwaniSurvey Nos.32/2/1/A,32/2/1/B30-06-2024 00:00:00
Jay Bharati Chs LtdShiv Developers1110/A Part 1168 1169 1170 1171 And 117331-12-2025 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Priyal AumShree Mauli Chs LtdPlot No 47 Sector 2601-06-2024 00:00:00
Joshi ArcadeMeera DevelopersSurvey No 34-1/12, Hissa No. 3, Plot No. 731-03-2026 00:00:00
Sai Narayana ResidencyMm Landmark Realty LlpS.No.1431-12-2025 00:00:00
One PyramidPacific PropertiesPlot No 2631-12-2026 00:00:00
Amar PearlAmarmaya & AssociatesCts No. 2328430-06-2024 00:00:00
Pride ParkNikhil Rajesh SukhramaniCts No 10429, 10430, 10431, 10401, 10432, 10438, 3097131-12-2025 00:00:00
Shree Ram Co Operative Housing Society LimitedSantosh Vasant ChitnisS No 704/2 706/6 Old , 286/2 294/6 Cts No 821 And 82231-03-2025 00:00:00
Yashshree Co.Op.Hsg.SocNitant Narendra DesaiSurvey No. 28, Hissa No. 3/2/K30-09-2025 00:00:00
Vaishnavi HightsVaishnavi Builders & Developers58,H No.1 P.No. 1 & 224-06-2024 00:00:00
Chandrakant ResidencyAmogh ConstructionC.T.S No- 2 To 8 & C.T.S No- 169 To 178, C.T.S No- 295 To 30031-12-2027 00:00:00
Daisy Gardens Building No.13Ankita BuildersSurvey No 9, Hissa No 2A30-06-2026 00:00:00
Madhusudan Retreat TerracesMadhusudan Leisure HomesSurvey No 5031-12-2026 00:00:00
Amruta ParkCheroba HomesS. No. 218, H. No. 2/Cpt & 3 & S. No. 21931-12-2026 00:00:00
Ram NiwasJitendra Gangji Dedhia21/B31-03-2025 00:00:00
Fenkin 9 Phase IiFen-Kin Buildpro LlpC-0631-12-2027 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Fatima Enclave- C WingRais Aziz Qureshi46/4 , 46/531-12-2025 00:00:00
Shree Prabhucharan Chs.LtdShree Prabhucharan Co-Op Housing Society66/5/6731-03-2024 00:00:00
Aastha OmkarAastha RealtorsS. No. 56, H. No. 35/D/2B/1 To 35/D/2B/14 And H. No. 35/D/2B/15/131-12-2026 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Panvelkar EmpireOm Sai Shraddha DevelopersSurvey No. 30/4 (P)30-06-2026 00:00:00
Om Sai One ParkInfini DevelopersCts 133/3 133/4 134/3 134/5 134/9 134/10 134/11 134/4/A 138/13/A 138/13/B 138/13/C31-12-2028 00:00:00
Heramb ArcadeShivbaba DevelopersPlot No 4, Gut No 26/2931-10-2025 00:00:00
Diya HomesKirtikumar Vanechand DoshiPlot No-2631-12-2023 00:00:00
Arunoday AnnexMangalya Shelter's102131-03-2025 00:00:00
Project Details
  • Project:
    Central Heights
  • Location:
  • 55 Part, 56 Part, 59 Part
  • Const. Stage:
    New
  • Possession:
    01 Apr 2025
Developer Details

  • Developer:
    Kdc Enterprises
  • Phone:
  • Address:
  • Madina Tower
Project RERA Details
MAHA REARA No: P51700020076
Project Type Others
RERA Project Status New
Architect Shri Sachin Charpe
Funding Bank DCB BANK LIMITED
Proposed Possession 01 Apr 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 26 Mar 2019
Last Retrived 26 Jul 2025
Central Heights QR Code
Central Heights
MahaRERA - P51700020076
Apartment Details & Configuration
TypeArea
1 BHK27.79 Sq.mts. ( 299 Sq.ft. )
1 BHK28.02 Sq.mts. ( 302 Sq.ft. )
1 BHK32.79 Sq.mts. ( 353 Sq.ft. )
1 BHK32.97 Sq.mts. ( 355 Sq.ft. )
2 BHK42.35 Sq.mts. ( 456 Sq.ft. )
2 BHK42.62 Sq.mts. ( 459 Sq.ft. )
2 BHK48.05 Sq.mts. ( 517 Sq.ft. )
Shop13.66 Sq.mts. ( 147 Sq.ft. )
Shop14.4 Sq.mts. ( 155 Sq.ft. )
Shop14.68 Sq.mts. ( 158 Sq.ft. )
Shop15.51 Sq.mts. ( 167 Sq.ft. )
Shop16.07 Sq.mts. ( 173 Sq.ft. )
Shop17.65 Sq.mts. ( 190 Sq.ft. )
Shop20.16 Sq.mts. ( 217 Sq.ft. )
Shop23.23 Sq.mts. ( 250 Sq.ft. )
Shop27.41 Sq.mts. ( 295 Sq.ft. )
1 BHK34.13 Sq.mts. ( 367 Sq.ft. )
2 BHK48.87 Sq.mts. ( 526 Sq.ft. )
DUPLEX175.18 Sq.mts. ( 1886 Sq.ft. )
DUPLEX176.28 Sq.mts. ( 1897 Sq.ft. )
Shop16.91 Sq.mts. ( 182 Sq.ft. )
Shop18.21 Sq.mts. ( 196 Sq.ft. )
Shop20.72 Sq.mts. ( 223 Sq.ft. )
Shop21.74 Sq.mts. ( 234 Sq.ft. )
Shop22.48 Sq.mts. ( 242 Sq.ft. )
Shop23.6 Sq.mts. ( 254 Sq.ft. )
Shop24.53 Sq.mts. ( 264 Sq.ft. )
Shop24.63 Sq.mts. ( 265 Sq.ft. )
Shop25.18 Sq.mts. ( 271 Sq.ft. )
Shop32.98 Sq.mts. ( 355 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Central Heightslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
To Be Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Only Electric Meter To Be Provided To Be Completed
Energy management
Only Solar Water Heater - To Be Completed
Fire Protection And Fire Safety Requirements
To Be Completed Before Oc
Landscaping & Tree Planting
To Be Completed Before Oc
Open Parking
To Be Completed
Sewerage (Chamber, Lines, Septic Tank , STP)
To Be Completed
Solid Waste Management And Disposal
Na
Storm Water Drains
To Be Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
To Be Completed Before Oc
Water Supply
To Be Completed
Buildings / Wings in Central Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Central Heights by Kdc Enterpriseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

51282 Sq. ft.

Project Area

11441 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

348 apartments in total
Total
348
Booked
150
Available
198

Saleable Area Statistics (Sq. ft.)

133465 Total
Total
133465
Booked
54425
Available
79040
Total 348 apartments in project. 150 apartments booked. 43% apartments booked.
Total 133465 Sq.ft. saleable area. 54425 saleable area booked.
41% area booked.

Central Heights - A - Wing A1, Wing A2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Central Heights - A - Wing A1, Wing A2Apr 2024181000210
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.79 Sq.mts. ( 299 Sq.ft. )32
16 Booked50% Booked
50% Booked
1 BHK28.02 Sq.mts. ( 302 Sq.ft. )74
38 Booked51% Booked
51% Booked
1 BHK32.79 Sq.mts. ( 353 Sq.ft. )5
None Booked0% Booked
0% Booked
1 BHK32.97 Sq.mts. ( 355 Sq.ft. )2
1 Booked50% Booked
50% Booked
2 BHK42.35 Sq.mts. ( 456 Sq.ft. )65
35 Booked53% Booked
53% Booked
2 BHK42.62 Sq.mts. ( 459 Sq.ft. )72
36 Booked50% Booked
50% Booked
2 BHK48.05 Sq.mts. ( 517 Sq.ft. )12
None Booked0% Booked
0% Booked
Shop13.66 Sq.mts. ( 147 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop14.4 Sq.mts. ( 155 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.68 Sq.mts. ( 158 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop15.51 Sq.mts. ( 167 Sq.ft. )3
3 Booked100% Booked
100% Booked
Shop16.07 Sq.mts. ( 173 Sq.ft. )4
3 Booked75% Booked
75% Booked
Shop17.65 Sq.mts. ( 190 Sq.ft. )4
2 Booked50% Booked
50% Booked
Shop20.16 Sq.mts. ( 217 Sq.ft. )4
3 Booked75% Booked
75% Booked
Shop23.23 Sq.mts. ( 250 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop27.41 Sq.mts. ( 295 Sq.ft. )3
2 Booked66% Booked
66% Booked
286 total apartments / 141 apartments booked. 49% apartments booked.
Work Description in Building Central Heights - A - Wing A1, Wing A2Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress60% done
60% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Central Heights - B 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Central Heights - B 1Apr 2024710100100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.13 Sq.mts. ( 367 Sq.ft. )33
2 BHK48.87 Sq.mts. ( 526 Sq.ft. )11
None Booked0% Booked
0% Booked
DUPLEX175.18 Sq.mts. ( 1886 Sq.ft. )1
None Booked0% Booked
0% Booked
DUPLEX176.28 Sq.mts. ( 1897 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.07 Sq.mts. ( 173 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop16.91 Sq.mts. ( 182 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.21 Sq.mts. ( 196 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.72 Sq.mts. ( 223 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop21.74 Sq.mts. ( 234 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop22.48 Sq.mts. ( 242 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.6 Sq.mts. ( 254 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop24.53 Sq.mts. ( 264 Sq.ft. )3
1 Booked33% Booked
33% Booked
Shop24.63 Sq.mts. ( 265 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25.18 Sq.mts. ( 271 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop32.98 Sq.mts. ( 355 Sq.ft. )1
1 Booked100% Booked
100% Booked
62 total apartments / 9 apartments booked. 14% apartments booked.
Work Description in Building Central Heights - B 1Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress30% done
30% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Kdc Enterprises
for Project
Central Heights
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation