Project overview

Celestial is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800001768. Celestial is located at Cts No. 549A 549A/ 1 To 3. This is a Ongoing being developed by Su Sharda Edifice Llp.

Celestial has 2 BHK, SHOP NO. 11, SHOP NO.10, SHOP NO.12, SHOP NO.6, SHOP NO.7, SHOP NO.8 & SHOP NO.9 Apartments with carpet areas ranging from 123 to 628 Sq.ft. Carpet. The Project has total 279 of which 80 are currently available for sale.

Celestial is being developed on a total land area of 82801 Sq.ft. out of which 15520 Sq.ft. i.e 19% is reserved for recreational purposes. Celestial has 3 Wings / Towers Celestial Wing A,Celestial Wing B,Celestial Wing C

ProjectDeveloperLocationPossession
Runwal Forest Tower 1-4Wheelabrator Alloy Castings LimitedPt.596-598, 602/1-9, 606/1-83, 605/1-17, 607A607d596/1-6, 601-606, 599A/1-81, 607/1-3130-04-2022 00:00:00
Altavista - Phase 1Spenta Enclave Private Limited343 Part31-12-2019 00:00:00
Stella Sapphire B WingVaibhavlaxmi Builders And Developers51 Part31-12-2018 00:00:00
Shree Siddhi Bldg No 69Hiranimanthan Builders And Developers12 Pt31-03-2020 00:00:00
Venus TowersVenus EnterprisesMumbai Suburban31-12-2020 00:00:00
Godrej CentralGodrej Landmark Redevelopers Private LimitedCts 49/Pt, 5630-03-2021 00:00:00
Shweta ChsAtharva DevelopersChembur Village, C T S No 56 Pt, Building No. 8 Of Sahakar Nagar -131-12-2018 00:00:00
Trishabh SignetDimension Housing Realty Llp129531-12-2019 00:00:00
Sagar C.H.SHiranimanthan Builders And Developers12 Pt31-12-2019 00:00:00
Safal TrademarkJai Mata Di Home Construction Pvt Ltd303 1 To 45, Cts No 30330-12-2023 00:00:00
Lakshmi VaniTridhaatu Realty & Infra Pvt LimitedPlotno53 And 54Cts No 936 936-1 936-2 936-3 936-4 936-5 936-6 936-7 936-8 936-9 936-10 936-11 936 1230-04-2018 00:00:00
Vishnubhuvan Chs LtdShree S S Developers Private Limited222Pt30-12-2022 00:00:00
Shree DeeplaxamiPuro Constructions1332, 44631-12-2019 00:00:00
Shree Samarth Galaxy Sra Chs LtdShree S S Developers Private Limited222Pt Of Village Kanjur31-12-2018 00:00:00
Ratnadeep Chs LtdS D Bhalerao Constructions Pvt Ltd Bldg No 60 JvSambar Galli31-05-2019 00:00:00
Skyline Sparkle Wing C Skyline Greathills39331-12-2019 00:00:00
Redevelopment Of Gkw Sankey Employees ChslHeritage Lifestyles & Developers Pvt. Ltd.EC.T.S. No. 424 C, Plot No.231-05-2019 00:00:00
Tulsi ElanzaMetro Capital11A 11B S No 504 50331-12-2019 00:00:00
Marvel Gold - Phase ISwaroop Constructions Private Limited408 Part 408/1 To 3 412 Part 412/2 To 10 412/18 412/20 To 5430-12-2021 00:00:00
Dev DarshanCity Estate Developers LimitedCts No 636, 636 1 To 16 & Cts No 634, 6341 To 2630-12-2022 00:00:00
49 ElinaHuges Real Estates Developers Llp3531-12-2019 00:00:00
Shree Shivsamarth ResidencyShree Shiv Samarth Developers89, 88/1 Pt, 88Pt, 87/1 To 431-12-2018 00:00:00
Sunshine OakwoodSunshine Housing Private LimitedCts No 403 C30-03-2024 00:00:00
Suvidha SolitairePremier Infotech Pvt LtdMumbai Suburban, 40007131-12-2027 00:00:00
Hubtown Seasons - Ecuador CloudJoynest Premises Private LimitedCts No.469-A30-12-2024 00:00:00
Ruparel OrionK D Lite Developers Pvt LtdCts No. 47030-12-2021 00:00:00
Samruddhi ChsHasmukh R Hirani1231-12-2019 00:00:00
Vijay Lenyadri Chs LtdS D Bhalerao Constructions Pvt LtdMumbai Suburban31-12-2017 00:00:00
VastukalpNhk Developers Llp431-D, Cts No. 43130-12-2025 00:00:00
Sai Ashish IiKukreja Construction CoCts No.411/A Of Village Bhanduo, Tal Mulund31-12-2017 00:00:00
Shree Parshwanath Sra Chs LtdChintamani Realtors40007830-12-2021 00:00:00
SovenirSuncity CorporationMumbai Suburban, 40007831-08-2016 00:00:00
CelestialSu Sharda Edifice LlpCts No. 549A 549A/ 1 To 330-12-2024 00:00:00
Tridhaatu Bhaveshwar VilasTridhaatu Bhaveshwar Developers Llp17Th Road31-10-2018 00:00:00
Castle PeakInnerspace190/1, Plot No. 142 Cts No. 19031-03-2018 00:00:00
Saffron Residency Phase -1Ayodhya Construction Co115, 115/1 To 1230-12-2022 00:00:00
Sai Krupa Chs LtdS D Bhalerao Constructions Pvt LtdSambar Galli31-12-2016 00:00:00
Sai SansarConcrete Builders1274/1, Cts 1274, Plot No 42730-12-2023 00:00:00
Bhandup Citizen Chs LtdCastle Floors Pms Pvt LtdMumbai Suburban, 40007830-06-2021 00:00:00
Vaibhav Chowk Sra Chs LtdSunil Mohan JoshiCts No 60 1-70 Bhandup Village30-12-2022 00:00:00
Devi Kakad SolitaireNiraj Kakad Constructions40007128-02-2018 00:00:00
Arya HeightsRishabh EnterprisesCts 46, 46/1 To 930-12-2021 00:00:00
Tirupati HeightTirupati Developer193 Pt, 225 Pt31-08-2018 00:00:00
Stella Sapphire A WingVaibhavlaxmi Builders And Developers51 Part31-12-2019 00:00:00
ZynergyMaa Ashapura DevelopersCts 343Pt30-12-2023 00:00:00
Signature Business ParkSwastik Developers521 522 523 Pt 529 Pt30-12-2022 00:00:00
Swiss BoulevardChaurang Associates49830-03-2022 00:00:00
Puneet KalpavrikshaPuneet Prateeksha SpacesS No 229 S No 267 Cts 11 Pt30-06-2025 00:00:00
Raghav NovaVaidehi Construction & Developers2 Part And 64031-07-2023 00:00:00
Aayush PoornimaAayush Developers366/1430-06-2019 00:00:00
Zen ApartmentsBholenath Developers Ltd.Plot No. 421 C.T.S. No. 1287/1287 1 To 631-03-2018 00:00:00
Hubtown Seasons - I WingJoynest Premises Private LimitedCts No. 469-A30-12-2025 00:00:00
39 AntheaShreenathji Developers Pvt. Ltd,2431-03-2020 00:00:00
Swanand Bldg No 33Hiranimanthan Builders And Developers11 Pt31-12-2019 00:00:00
Swastik Plaza C Chs Ltd-AvanaPratibha Veekay Real Estate Llp366/1131-12-2018 00:00:00
Project Details
  • Project:
    Celestial
  • Location:
  • Cts No. 549A 549A/ 1 To 3
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Su Sharda Edifice Llp
  • Phone:
  • Address:
  • Sanman Shree Chs
Project RERA Details
MAHA REARA No: P51800001768
Project Type Others
RERA Project Status Ongoing
Architect Sunil Ramchandra Deole
Funding Bank AU SMALL FINANCE BANK LIMITED
Proposed Possession 30 Dec 2024
Revised Possession 30 Dec 2024
Extended Possession
Litigations No Litigations
Last Modified 17 Aug 2021
Last Retrived 26 Jul 2025
Celestial QR Code
Celestial
MahaRERA - P51800001768
Apartment Details & Configuration
TypeArea
2 BHK57.15 Sq.mts. ( 615 Sq.ft. )
2 BHK58.33 Sq.mts. ( 628 Sq.ft. )
1 BHK38.25 Sq.mts. ( 412 Sq.ft. )
1 BHK39.12 Sq.mts. ( 421 Sq.ft. )
SHOP NO 1116.74 Sq.mts. ( 1257 Sq.ft. )
SHOP NO 221.88 Sq.mts. ( 236 Sq.ft. )
SHOP NO. 517.53 Sq.mts. ( 189 Sq.ft. )
SHOP NO.320.08 Sq.mts. ( 216 Sq.ft. )
SHOP NO.421.8 Sq.mts. ( 235 Sq.ft. )
2 BHK55.63 Sq.mts. ( 599 Sq.ft. )
2 BHK56.81 Sq.mts. ( 612 Sq.ft. )
SHOP NO. 1116.53 Sq.mts. ( 178 Sq.ft. )
SHOP NO.1011.4 Sq.mts. ( 123 Sq.ft. )
SHOP NO.1220.69 Sq.mts. ( 223 Sq.ft. )
SHOP NO.615.52 Sq.mts. ( 167 Sq.ft. )
SHOP NO.715.48 Sq.mts. ( 167 Sq.ft. )
SHOP NO.812.16 Sq.mts. ( 131 Sq.ft. )
SHOP NO.920.33 Sq.mts. ( 219 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Celestiallast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Wip
Community Buildings100% completed
95% Complete
Work Done
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
From Msedcl
Energy management
Na
Fire Protection And Fire Safety Requirements95% completed
95% Complete
As Per Cfo Noc
Landscaping & Tree Planting100% completed
95% Complete
Tree Plantation
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Municipal Sewer
Solid Waste Management And Disposal100% completed
95% Complete
Demolish Debris Is Removed
Storm Water Drains100% completed
95% Complete
Internal Storm Water Drains Within Property
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rain Water Harvesting
Water Supply90% completed
90% Complete
From Bmc
Buildings / Wings in Celestial
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Celestial by Su Sharda Edifice Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

82801 Sq. ft.

Project Area

15520 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

279 apartments in total
Total
279
Booked
199
Available
80

Saleable Area Statistics (Sq. ft.)

150223 Total
Total
150223
Booked
105776
Available
44447
Total 279 apartments in project. 199 apartments booked. 71% apartments booked.
Total 150223 Sq.ft. saleable area. 105776 saleable area booked.
70% area booked.

Celestial Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Celestial Wing ADec 2023230011090
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.15 Sq.mts. ( 615 Sq.ft. )46
33 Booked71% Booked
71% Booked
2 BHK58.33 Sq.mts. ( 628 Sq.ft. )43
31 Booked72% Booked
72% Booked
89 total apartments / 64 apartments booked. 71% apartments booked.
Work Description in Building Celestial Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Celestial Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Celestial Wing BDec 2023230011095
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.25 Sq.mts. ( 412 Sq.ft. )46
34 Booked73% Booked
73% Booked
1 BHK39.12 Sq.mts. ( 421 Sq.ft. )43
38 Booked88% Booked
88% Booked
SHOP NO 1116.74 Sq.mts. ( 1257 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP NO 221.88 Sq.mts. ( 236 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP NO. 517.53 Sq.mts. ( 189 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP NO.320.08 Sq.mts. ( 216 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP NO.421.8 Sq.mts. ( 235 Sq.ft. )1
None Booked0% Booked
0% Booked
94 total apartments / 73 apartments booked. 77% apartments booked.
Work Description in Building Celestial Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Celestial Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Celestial Wing CDec 2023230011095
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK55.63 Sq.mts. ( 599 Sq.ft. )23
14 Booked60% Booked
60% Booked
2 BHK56.81 Sq.mts. ( 612 Sq.ft. )23
14 Booked60% Booked
60% Booked
2 BHK57.15 Sq.mts. ( 615 Sq.ft. )23
15 Booked65% Booked
65% Booked
2 BHK58.33 Sq.mts. ( 628 Sq.ft. )20
14 Booked70% Booked
70% Booked
SHOP NO. 1116.53 Sq.mts. ( 178 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP NO.1011.4 Sq.mts. ( 123 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP NO.1220.69 Sq.mts. ( 223 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP NO.615.52 Sq.mts. ( 167 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP NO.715.48 Sq.mts. ( 167 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP NO.812.16 Sq.mts. ( 131 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP NO.920.33 Sq.mts. ( 219 Sq.ft. )1
1 Booked100% Booked
100% Booked
96 total apartments / 62 apartments booked. 64% apartments booked.
Work Description in Building Celestial Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress98% done
98% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress98% done
98% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Su Sharda Edifice Llp
for Project
Celestial
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation