Project overview

Celestia is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800002847. Celestia is located at Cts No 19/11 Of Village Mulund Tal Kurla M.S.D. Near Veena Nagar Off Lbs Marg Mulund West Mumbai. This is a Ongoing being developed by Ariisto Developers Private Limited.

Celestia has 2 BHK, 3 BHK & 3 BHK L Apartments with carpet areas ranging from 699 to 887 Sq.ft. Carpet. The Project has total 900 of which 655 are currently available for sale.

Celestia is being developed on a total land area of 116036 Sq.ft. Celestia has 4 Wings / Towers Wing-A,Wing-B,Wing-C,Wing-D

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Celestia
  • Location:
  • Cts No 19/11 Of Village Mulund Tal Kurla M.S.D. Near Veena Nagar Off Lbs Marg Mulund West Mumbai
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2025
Developer Details

  • Developer:
    Ariisto Developers Private Limited
  • Phone:
  • Address:
  • Ariisto House
Project RERA Details
MAHA REARA No: P51800002847
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Rare Associates
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2025
Revised Possession 30 Dec 2025
Extended Possession
Litigations No Litigations
Last Modified 04 Aug 2017
Last Retrived 26 Jul 2025
Celestia QR Code
Celestia
MahaRERA - P51800002847
Apartment Details & Configuration
TypeArea
2 BHK64.94 Sq.mts. ( 699 Sq.ft. )
2 BHK65.39 Sq.mts. ( 704 Sq.ft. )
3 BHK76.38 Sq.mts. ( 822 Sq.ft. )
3 BHK76.99 Sq.mts. ( 829 Sq.ft. )
3 BHK L81.76 Sq.mts. ( 880 Sq.ft. )
3 BHK L82.36 Sq.mts. ( 887 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Celestialast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
By Developer
Energy management
By Developer
Fire Protection And Fire Safety Requirements
By Developer
Landscaping & Tree Planting
By Developer
Lift Elevators
By Developer
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
By Developer
Solid Waste Management And Disposal
By Developer
Storm Water Drains
By Developer
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
By Developer
Water Conservation, Rain water Harvesting
By Developer
Water Supply
By Mcgm
Buildings / Wings in Celestia
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Celestia by Ariisto Developers Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

116036 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

900 apartments in total
Total
900
Booked
245
Available
655

Saleable Area Statistics (Sq. ft.)

725283 Total
Total
725283
Booked
197913
Available
527370
Total 900 apartments in project. 245 apartments booked. 27% apartments booked.
Total 725283 Sq.ft. saleable area. 197913 saleable area booked.
27% area booked.

Wing-A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing-ADec 20244211340292
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.94 Sq.mts. ( 699 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK65.39 Sq.mts. ( 704 Sq.ft. )62
3 BHK76.38 Sq.mts. ( 822 Sq.ft. )14
11 Booked78% Booked
78% Booked
3 BHK76.99 Sq.mts. ( 829 Sq.ft. )55
18 Booked32% Booked
32% Booked
3 BHK L81.76 Sq.mts. ( 880 Sq.ft. )18
9 Booked50% Booked
50% Booked
3 BHK L82.36 Sq.mts. ( 887 Sq.ft. )62
14 Booked22% Booked
22% Booked
225 total apartments / 75 apartments booked. 33% apartments booked.
Work Description in Building Wing-ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing-B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing-BJan 19004211340292
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.94 Sq.mts. ( 699 Sq.ft. )14
None Booked0% Booked
0% Booked
2 BHK65.39 Sq.mts. ( 704 Sq.ft. )62
None Booked0% Booked
0% Booked
3 BHK76.38 Sq.mts. ( 822 Sq.ft. )14
None Booked0% Booked
0% Booked
3 BHK76.99 Sq.mts. ( 829 Sq.ft. )55
None Booked0% Booked
0% Booked
3 BHK L81.76 Sq.mts. ( 880 Sq.ft. )18
None Booked0% Booked
0% Booked
3 BHK L82.36 Sq.mts. ( 887 Sq.ft. )62
None Booked0% Booked
0% Booked
225 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing-BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing-C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing-CDec 20244211340292
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.94 Sq.mts. ( 699 Sq.ft. )14
8 Booked57% Booked
57% Booked
2 BHK65.39 Sq.mts. ( 704 Sq.ft. )62
3 BHK76.38 Sq.mts. ( 822 Sq.ft. )14
8 Booked57% Booked
57% Booked
3 BHK76.99 Sq.mts. ( 829 Sq.ft. )55
14 Booked25% Booked
25% Booked
3 BHK L81.76 Sq.mts. ( 880 Sq.ft. )18
12 Booked66% Booked
66% Booked
3 BHK L82.36 Sq.mts. ( 887 Sq.ft. )62
18 Booked29% Booked
29% Booked
225 total apartments / 72 apartments booked. 32% apartments booked.
Work Description in Building Wing-CCompletion
Basement (if any)
Excavation
work-in-progress60% done
60% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing-D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing-DDec 20244211340293
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.94 Sq.mts. ( 699 Sq.ft. )14
13 Booked92% Booked
92% Booked
2 BHK65.39 Sq.mts. ( 704 Sq.ft. )62
20 Booked32% Booked
32% Booked
3 BHK76.38 Sq.mts. ( 822 Sq.ft. )14
10 Booked71% Booked
71% Booked
3 BHK76.99 Sq.mts. ( 829 Sq.ft. )55
23 Booked41% Booked
41% Booked
3 BHK L81.76 Sq.mts. ( 880 Sq.ft. )18
8 Booked44% Booked
44% Booked
3 BHK L82.36 Sq.mts. ( 887 Sq.ft. )62
24 Booked38% Booked
38% Booked
225 total apartments / 98 apartments booked. 43% apartments booked.
Work Description in Building Wing-DCompletion
Basement (if any)
Excavation
work-in-progress60% done
60% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Ariisto Developers Private Limited
for Project
Celestia
last updated on 26 Jul 2025 as per information obtained from MARA RERA.