Project overview

Boulevard Tower 4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800002133. Boulevard Tower 4 is located at 35Wato/P87/Wsefxquan4urknqy4g0txnvb/Htirleiv1w4mgg5nbjg9ozw4ijtn01tfjjlsurcdcihqnaqtmobrburaavtwdhmgsc30nzxlo41v4xdldq/Qb0+5Yhy8k5dhzud4i1epjknknc1abq==. This is a Ongoing being developed by Acme Realties Private Limited.

Boulevard Tower 4 has 2 BHK Area 1, 2.5 BHK Area 1, 3 BHK Area 1 & 3 BHK Area 2 Apartments with carpet areas ranging from 731 to 1003 Sq.ft. Carpet. The Project has total 150 of which 0 are currently available for sale.

Boulevard Tower 4 is being developed on a total land area of 7049 Sq.ft. Boulevard Tower 4 has 1 Wings / Towers Boulevard Tower 4

ProjectDeveloperLocationPossession
Borivali Sahakar NiketanAmar EnterprisesL8ck0drmrnl75qnyz9srqa==01-06-2018 00:00:00
Regent Orchid - Hema Niwas ChslRdb Mumbai Infrastructures Private LimitedJnyqqhzkpblog7jekouut96jtiwqo0uvynpnqpxt6um=30-09-2018 00:00:00
Rolex Sra ChsSquare Constructions/Tjit1demfugorzwac7dnsfott9vbjy4rwbl/9Qfjde=31-03-2019 00:00:00
SparshValuable Dreamscape LlpImogiw6robsqusy6pe3fk38hnet782z+H6cuctlow2t5pkiujbefszjfttmi/6Nm31-12-2018 00:00:00
HansaAmn Enterprises5Lwvojkddknatkt0db8/+Yxwonv8ipvbavyf86a6bxy=30-12-2023 00:00:00
A-14, A Wing Petunia Apts, Bindra ComplexAccord Land Developers Pvt LtdAj57xudv7p1rsk7ijs3jf3w0juyhyeh60uwqo3vhah4=01-11-2018 00:00:00
Kanakia Wallstreet Wing AKanakia Spaces Realty Private LimitedVimy4ohd0o63hvlygl4sexskxdpp4jfgceyhkne6+Fq=31-12-2019 00:00:00
VivanteMahindra Lifespace Developers LimitedMt8u/Hawv/Il9a0r4kevngqs8awg2dm8zruz/Asntuw=31-10-2019 00:00:00
Platinum Tower - 1Akshay Gruhpravesh Llp+Subuen3uwxxzfk742s0aox0bnntc2umewgitijnxte=31-03-2020 00:00:00
Jangid AnnexeJangid Home Pvt Ltd0Cgzkyzw5sce+Sbquanyxaak2ey3wzm2wbk+N9qzkwi=31-12-2018 00:00:00
Kashmiri HeightsM.K.EnterprisesQdtauui810azsfq8/2Vcbjsopf/Uqqytmehzxyfxxkb/Trnpalrmah7pawsvywd/Xmdyf9upo+2Gdb8su43fja==30-06-2022 00:00:00
Avant Heritage IAishwarya Avant Builders LlpE5kczykaucvz2+4Ibzolihvc0rhvux7mab7iiplngw6rwf/Zjbpc6ivjwrc9vwxjoqxlzaqkd6bpfmehjxzuwg==31-12-2018 00:00:00
Amar ChslShiva Shakti Enclaves Private LimitedCidxfks9b5fpylie8lqz8rfehamxzwl8oyae9rksdpxznkof4yau7did9evnj9z72u9unlbpfnpyaxpzppgvvg==31-12-2018 00:00:00
Rajal ClassicNisar RealtorService Road31-12-2018 00:00:00
Inspire ResidencySardar RealtyAesladixw9sfnfppoh/Hrtgybrxhvrqqqsmvynxfqv8=31-12-2025 00:00:00
Kalpataru Vivant - North Wing EAlder Residency Private Limited3Uzdrypqyx0lh+Jfxy5fogsmk0ncre4gcbkp7hjp4/I=30-06-2028 00:00:00
Kalpataru Vivant - North Wing CAlder Residency Private Limited3Uzdrypqyx0lh+Jfxy5fogsmk0ncre4gcbkp7hjp4/I=30-06-2028 00:00:00
Royal Fantasy Phase IRoyal Fantasy Constructions Private Limited+Ga+Qlw3njbmnf0trhu3uiln9tamdifnrde1kc3c9vg=31-12-2018 00:00:00
Laxmi Ganga ChslChintan Arun ZaveriIirvmy0f47d4/2Noo7itlq==31-07-2019 00:00:00
Samarth Enclave H Wing Andheri Chhaya ChsSamarth Erectors And DevelopersQyr/Qvno3rvhbxm8fpnm/Gk76s00olzzvb8egyk66vq=30-12-2024 00:00:00
I Wing Samarth Enclave Andheri Chhaya ChsSamarth Erectors And DevelopersI4pe9ypvekkinghrqm4/Jw2zxfb8+Qjrloh1enzl8euqdej9qanrrsdhe/8Y/Ani30-03-2024 00:00:00
Romell MyraRomell Properties Private Limited9Vckke6jgek9aub8sa8ylg==30-12-2024 00:00:00
Romell OrbisRomell Properties Private LimitedCchpuygt4uyj58y8hau8iw==30-12-2024 00:00:00
Platinum Tower-4Shivkrupa Gruhpravesh LlpZmfwtsnujiz1sir+E+Owtodf4u/Eci7fbsgldlytrlo=30-09-2019 00:00:00
Vijaylaxmi BlissVijaylaxmi Infracon LlpIgben21q+Cqaymvvvei3ixmz/D997zxu1g+Hv2fo83q=30-06-2018 00:00:00
Shri Krishna Kunj Chs LtdEllora DevelopersCzlxo5lkvj2yhqdg0byd5dd4hkj5yolqtxq26vm97is=31-12-2018 00:00:00
Omkareshwar Chs PropNew Laxmi EnterprisesC156ucvzk76+Vxcjdx26ug==31-12-2019 00:00:00
Lawns And Beyond - Phase 3, Omkar International DistrictOmkar Ventures Pvt. Ltd.400060, Mumbai Suburban30-03-2023 00:00:00
Lawns And Beyond - Phase 2, Omkar International DistrictOmkar Ventures Pvt. Ltd.Mumbai Suburban, 40006030-03-2023 00:00:00
Sai GabhastiSai CorporationSncsmg4ka9auxdrumpku/A==31-12-2017 00:00:00
Aishwarya HeightAishwarya Light Construction CompanyMumbai Suburban, 40009331-12-2018 00:00:00
Sale Building No 1 Vaastu Shanti Wing A B CM/S Anshuman DevelopersIsv2bc+Pelbw1hfv2heayg==30-06-2019 00:00:00
Boulevard Tower 5Acme Realties Private LimitedSuu39kc8jdzw0kf8pi/Eyfhnm6sdovnyvap57f3awagbq+Vqvfbvtd8wder06xrrhxi00i9d+6Erhvbrmj0dkwagvyji/Ut/Lv69oemzl5ta2ogokmb6s7ojb29zdj8pciwzckatebloys/Kg701cq==30-12-2022 00:00:00
Platinum Tower - 31Manas Gruhpravesh LlpS28yzeip+Qucgojtod6lugs4rvgjkyuj+Jfsq8lpxlq=30-06-2022 00:00:00
Royal Fantasy Phase IiiRoyal Fantasy Constructions Private LimitedVooq8lufeh6jcq6luvgyyw==31-12-2019 00:00:00
Bhagwati AshishPritesh Damji SavlaQo7ap3oumpaoxijoh2l+0Q==15-11-2020 00:00:00
Samarth Enclave F And G Wing Andheri Chhaya ChsSamarth Erectors And DevelopersJw8galkd1njyz1rniluvh0ce2nzcriadeihuoi4w3ec=30-12-2023 00:00:00
Bhawani HeightsM/S Bhawani DevelopersHwcpp6xitnlgbmotndckdg==30-08-2020 00:00:00
PrismaOberoi Constructions LimitedCs9jdmakbwsdgeeoyjnrhixljog+8Tjg6lwvt7cltcy=30-06-2018 00:00:00
Royal Fantasy Phase IiRoyal Fantasy Constructions Private LimitedMsbjkghrqtjpow++Fpwqextbtrr9mrrww6ebu5nwy4m=30-06-2019 00:00:00
Lawns And Beyond - Phase 1, Omkar International DistrictOmkar Ventures Pvt. Ltd.400060, Mumbai Suburban30-03-2023 00:00:00
Crystal Paradise ResidencesPrithvi Sthapti LlpXmuwih/5Rhuteuckf3d1mixk98cyhpeen8nxvx2rfu8=30-06-2024 00:00:00
Avant Heritage Ii-Basement Plus Stilt Plus 3 Podium Plus 20 Upper Habitable FloorsAishwarya Avant Builders LlpLycdpoez/Uptirjwc4tnmsjr9vqy/Vhbpp+Pqahajt0=30-06-2021 00:00:00
B-1, C WingAccord Land Developers Pvt LtdE88b1pcgeehpcb9o94h/Zw==30-12-2028 00:00:00
Blue Fortuna Phase IiAtul Projects India Private Limited1Chpqs5rom9hjkozwzpegrrdhochodkderatquyo/Blwj1kr6b3b3fl8gamw7q63hopixrzmuuahpk7dk7qno3fd3isanmgxm+Wsiuaz0hzqw03e1tq477nxlybtpsymmy1grknhux6/8Znzr3n9sf7b/+Reulk3jmo23qcsa660kj8eymijt+7Tsd5zpjqtjbsjkqt7wvqd3zkhi2l+89Qccwrbuojxjmqn2+L+R7s=30-09-2023 00:00:00
Aim GardenAim DevelopersQzbwwt/Oefkn9w/4E5xmi7jb/Pnl/Ssl6wtcjec5iw4=31-07-2029 00:00:00
Shraddha West ResidencyShraddha Buildcon Pvt LtdUwgmgouhvrqkw0q+5Ec1tw==31-12-2025 00:00:00
Ashtavinayak ApartmentsShiv Shruti Developers LlpGlkwogg+Wat6oezwxfurssaoxy5cyzp3ttayjwl6f7xgh1sq96d1mmwqge2y6yjiandrusvv5akhqhzhzhkack7ymbssbwcgyklvbs1qgrzsolh4fsmlms5oh4fzc9sjhqmjaiddemrcwxemv1ldsw==31-12-2025 00:00:00
Kalpataru Vivant - South Wing BAlder Residency Private Limited+Qkda0nfq4vcbnw6nmteqlsvuvqjdso3wmkxian/Rv8v1mi2hgntuy2vezmcy7qd31-03-2028 00:00:00
Kalpataru Vivant - South Wing AAlder Residency Private LimitedMujawjkinaccmohbu1j1pv9y8rfqc22exuzlqhcadc8=31-03-2028 00:00:00
Kalpataru Vivant - North Wing BAlder Residency Private LimitedEti4g7dcl+O7893zl5ikrhdzuzcgz7sezj8gmbynqsfojbu185xj7vq+Exynmqll31-03-2028 00:00:00
Horizon HeightsI.R.Developers LlpZcuv4jypuis27zt65krldhap3965fug3djjsz8bc9wi=31-03-2026 00:00:00
Nicco ResidencyNeelkamal Realty & Construction LlpAxnc0fanyufia5jth96xjw==31-12-2026 00:00:00
Vastu ShilpVastu Nirman RealtorsQck2ktk10bx0gukyg9ltbq==31-12-2026 00:00:00
SwapnapoortiM/S Shiv Samruddhi DevelopersSgsj/F1xzvyz0foeen/Afw6gvgaknrarlpxipdjhalvakw1gp5v9fhx6vlm3syiretrn9aospghwp34scmvebyjmdztkkadczojhrojke9zjf0v9tqiagnp1fjoakoex31-12-2019 00:00:00
Eco Roshni - Redevelopment Of Nai Roshni ChslEcohomes Constructions Pvt. Ltd.Jvbizrlhxqrwntxrrl5jncl2lenj+Ou1oy0r1wym8ni=30-06-2019 00:00:00
B-1, D WingAccord Land Developers Pvt LtdDbpcu2igdcmmtnmlwa5lqa==30-06-2028 00:00:00
GurudarshanBalaji Builders And DevelopersWt6svhnjwrzlyw4io4jx6a==31-03-2028 00:00:00
Shivsai Sra ChsAarc Real Estate Developers Private LimitedOimwkcrqqke3sxy3xxar9idzsyavtsq/Oxguaewbylstlc6pq1ag18v05bqgokbojyfhmuhzzn7ffgwkx9zita==31-12-2028 00:00:00
Kenorita Garment HubKeshvi Developers Pvt LtdXbioxs/Kcpebsly8x5itha==31-03-2018 00:00:00
Satra NexusRrb Homes Private LimitedOvbk57vgqhe+Ot3x+Xtdea==31-12-2027 00:00:00
Raj VegaRajesh Arvind SurtiCfjssckuyc64qdqsd8/Csq==31-12-2029 00:00:00
MaximaOberoi Constructions LimitedSofnsh7vvvgybrefqqhnp5f6kgeifctmexlwe1aw3es=30-06-2023 00:00:00
Palmrose BHillview VenturesYkltavkranhh9zmejhxfnq==30-12-2025 00:00:00
ShivsolitaireSo Lucky BuildersMumbai City, 40006031-12-2018 00:00:00
Satguru GardenShree Satguru Developers400093, Mumbai Suburban18-07-2019 00:00:00
Ranbir CastleRanbirdeep Realtors Llp0R81cur9jn9lvm3/3Bqbowcpkcwi3hoi3cy1/Chif9w=31-03-2027 00:00:00
Boulevard Tower 4Acme Realties Private Limited35Wato/P87/Wsefxquan4urknqy4g0txnvb/Htirleiv1w4mgg5nbjg9ozw4ijtn01tfjjlsurcdcihqnaqtmobrburaavtwdhmgsc30nzxlo41v4xdldq/Qb0+5Yhy8k5dhzud4i1epjknknc1abq==30-12-2022 00:00:00
Fine ResidencyFine DevelopmentsF68jw+Kyrlz0bzy0ev/Meejjgecop9tn9fulbhykaka=15-08-2022 00:00:00
Sheel EnclavesPoddar Infracon Private LimitedQzgkpw1dyp2hyhhezhcraq==30-12-2021 00:00:00
Anand HeritageTsm Infra31-12-2028 00:00:00
Kalpataru VerbinaKalpataru Shubham Enterprises31-12-2029 00:00:00
Ranbir LuxuriaRanbirdeep Realtors Llp31-12-2029 00:00:00
Project Details
  • Project:
    Boulevard Tower 4
  • Location:
  • 35Wato/P87/Wsefxquan4urknqy4g0txnvb/Htirleiv1w4mgg5nbjg9ozw4ijtn01tfjjlsurcdcihqnaqtmobrburaavtwdhmgsc30nzxlo41v4xdldq/Qb0+5Yhy8k5dhzud4i1epjknknc1abq==
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Acme Realties Private Limited
  • Phone:
  • Address:
  • Acme Ghar
Project RERA Details
MAHA REARA No: P51800002133
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect H.M Jhaveri & Sons
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession 29 Dec 2023
Litigations No Litigations
Last Modified 21 Nov 2022
Last Retrived 13 Feb 2026
Boulevard Tower 4 QR Code
Boulevard Tower 4
MahaRERA - P51800002133
Apartment Details & Configuration
TypeArea
2 BHK Area 167.9 Sq.mts. ( 731 Sq.ft. )
2.5 BHK Area 181.69 Sq.mts. ( 879 Sq.ft. )
3 BHK Area 192.89 Sq.mts. ( 1000 Sq.ft. )
3 BHK Area 293.21 Sq.mts. ( 1003 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Boulevard Tower 4last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
2 basements100% completed
95% Complete
Common To All Users Of The Larger Layout
3 level podium100% completed
95% Complete
Common To All Users Of The Larger Layout
Aggregate area of recreational Open Space
Common To All Users Of The Larger Layout
Amenities
Common To All Users Of The Larger Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Common To All Users Of The Larger Layout
Energy management
Common To All Users Of The Larger Layout
External podium
Common To All Users Of The Larger Layout
Fire Protection And Fire Safety Requirements
Common To All Users Of The Larger Layout
Landscaping & Tree Planting
Common To All Users Of The Larger Layout
Open Parking
Common To All Users Of The Larger Layout
Sewerage (Chamber, Lines, Septic Tank , STP)
Common To All Users Of The Larger Layout
Solid Waste Management And Disposal
Common To All Users Of The Larger Layout
Stilt100% completed
95% Complete
Common To All Users Of The Larger Layout
Storm Water Drains
Common To All Users Of The Larger Layout
Street Lighting
Common To All Users Of The Larger Layout
Treatment And Disposal Of Sewage And Sullage Water
Common To All Users Of The Larger Layout
Water Conservation, Rain water Harvesting
Common To All Users Of The Larger Layout
Water Supply
Common To All Users Of The Larger Layout
Buildings / Wings in Boulevard Tower 4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Boulevard Tower 4 by Acme Realties Private Limitedlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

7049 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

150 apartments in total
Total
150
Booked
150
Available
0

Saleable Area Statistics (Sq. ft.)

127568 Total
Total
127568
Booked
127568
Available
0
Total 150 apartments in project. 150 apartments booked. 100% apartments booked.
Total 127568 Sq.ft. saleable area. 127568 saleable area booked.
100% area booked.

Boulevard Tower 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Boulevard Tower 4Dec 202128000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK Area 167.9 Sq.mts. ( 731 Sq.ft. )72
72 Booked100% Booked
100% Booked
2.5 BHK Area 181.69 Sq.mts. ( 879 Sq.ft. )26
26 Booked100% Booked
100% Booked
3 BHK Area 192.89 Sq.mts. ( 1000 Sq.ft. )26
26 Booked100% Booked
100% Booked
3 BHK Area 293.21 Sq.mts. ( 1003 Sq.ft. )26
26 Booked100% Booked
100% Booked
150 total apartments / 150 apartments booked. 100% apartments booked.
Work Description in Building Boulevard Tower 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress31% done
31% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress31% done
31% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Acme Realties Private Limited
for Project
Boulevard Tower 4
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation