Project overview
Borivali New Roma Sadan Chsl is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800045284. Borivali New Roma Sadan Chsl is located at 659.20. This is a New being developed by Sumukh Infraproject.
Borivali New Roma Sadan Chsl has 1 BHK, 2 BHK, 3 BHK & FLAT TO OLD MEMBERS Apartments with carpet areas ranging from 491 to 734 Sq.ft. Carpet. The Project has total 28 of which 6 are currently available for sale.
Borivali New Roma Sadan Chsl is being developed on a total land area of 7096 Sq.ft. Borivali New Roma Sadan Chsl has 1 Wings / Towers Triveni Callypso
| Project | Developer | Location | Possession |
-
Developer:
Sumukh Infraproject
-
Phone:
-
Address:
-
Shree Vallabh Residency
| MAHA REARA No: |
P51800045284 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
New |
| Architect |
Harish D Gandhi |
| Funding Bank |
|
| Proposed Possession |
30 Jun 2023 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
22 Mar 2025 |
| Last Retrived |
26 Jul 2025 |
Borivali New Roma Sadan Chsl QR Code
Borivali New Roma Sadan Chsl
MahaRERA - P51800045284
| Type | Area |
| 1 BHK | 45.61 Sq.mts. ( 491 Sq.ft. ) |
| 2 BHK | 55.96 Sq.mts. ( 602 Sq.ft. ) |
| 2 BHK | 56.96 Sq.mts. ( 613 Sq.ft. ) |
| 3 BHK | 68.23 Sq.mts. ( 734 Sq.ft. ) |
| FLAT TO OLD MEMBERS | 51.36 Sq.mts. ( 553 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Borivali New Roma Sadan Chsllast updated on 26 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Electric Meter Panel |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
As Per Cfo Remarks |
Landscaping & Tree Planting
|
|
Na |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Na |
Solid Waste Management And Disposal
|
|
Vermiculture And Dustbin |
|
|
|
As Per Consultant And Mcgm Remarks |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
As Per Mcgm Remarks |
Water Conservation, Rain water Harvesting
|
|
From Mcgm |
|
|
|
From Mcgm |
Buildings / Wings in Borivali New Roma Sadan Chsl
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Borivali New Roma Sadan Chsl by Sumukh Infraprojectlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
28
apartments in total
Saleable Area Statistics (Sq. ft.)
16765
Total
Total 28 apartments in project. 22 apartments booked. 78% apartments booked.
Total 16765 Sq.ft. saleable area. 12867 saleable area booked.
77% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Triveni Callypso | Jun 2023 | 14 | 1 | 0 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 45.61 Sq.mts. ( 491 Sq.ft. ) | 1 | |
| 2 BHK | 55.96 Sq.mts. ( 602 Sq.ft. ) | 4 | |
| 2 BHK | 56.96 Sq.mts. ( 613 Sq.ft. ) | 1 | |
| 3 BHK | 68.23 Sq.mts. ( 734 Sq.ft. ) | 6 | |
| FLAT TO OLD MEMBERS | 51.36 Sq.mts. ( 553 Sq.ft. ) | 16 | |
28 total apartments / 22 apartments booked. 78% apartments booked. |
| Work Description in Building Triveni Callypso | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Sumukh Infraproject
for Project
Borivali New Roma Sadan Chsl
last updated on
26 Jul 2025 as per information obtained from MARA RERA.