Project overview

Borivali New Roma Sadan Chsl is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800045284. Borivali New Roma Sadan Chsl is located at 659.20. This is a New being developed by Sumukh Infraproject.

Borivali New Roma Sadan Chsl has 1 BHK, 2 BHK, 3 BHK & FLAT TO OLD MEMBERS Apartments with carpet areas ranging from 491 to 734 Sq.ft. Carpet. The Project has total 28 of which 6 are currently available for sale.

Borivali New Roma Sadan Chsl is being developed on a total land area of 7096 Sq.ft. Borivali New Roma Sadan Chsl has 1 Wings / Towers Triveni Callypso

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Borivali New Roma Sadan Chsl
  • Location:
  • 659.20
  • Const. Stage:
    New
  • Possession:
    30 Jun 2023
Developer Details

  • Developer:
    Sumukh Infraproject
  • Phone:
  • Address:
  • Shree Vallabh Residency
Project RERA Details
MAHA REARA No: P51800045284
Project Type Residential / Group Housing
RERA Project Status New
Architect Harish D Gandhi
Funding Bank
Proposed Possession 30 Jun 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 22 Mar 2025
Last Retrived 26 Jul 2025
Borivali New Roma Sadan Chsl QR Code
Borivali New Roma Sadan Chsl
MahaRERA - P51800045284
Apartment Details & Configuration
TypeArea
1 BHK45.61 Sq.mts. ( 491 Sq.ft. )
2 BHK55.96 Sq.mts. ( 602 Sq.ft. )
2 BHK56.96 Sq.mts. ( 613 Sq.ft. )
3 BHK68.23 Sq.mts. ( 734 Sq.ft. )
FLAT TO OLD MEMBERS51.36 Sq.mts. ( 553 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Borivali New Roma Sadan Chsllast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electric Meter Panel
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Cfo Remarks
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Vermiculture And Dustbin
Storm Water Drains
As Per Consultant And Mcgm Remarks
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
As Per Mcgm Remarks
Water Conservation, Rain water Harvesting
From Mcgm
Water Supply
From Mcgm
Buildings / Wings in Borivali New Roma Sadan Chsl
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Borivali New Roma Sadan Chsl by Sumukh Infraprojectlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

7096 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

28 apartments in total
Total
28
Booked
22
Available
6

Saleable Area Statistics (Sq. ft.)

16765 Total
Total
16765
Booked
12867
Available
3899
Total 28 apartments in project. 22 apartments booked. 78% apartments booked.
Total 16765 Sq.ft. saleable area. 12867 saleable area booked.
77% area booked.

Triveni Callypso

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Triveni CallypsoJun 202314101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK45.61 Sq.mts. ( 491 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK55.96 Sq.mts. ( 602 Sq.ft. )4
2 Booked50% Booked
50% Booked
2 BHK56.96 Sq.mts. ( 613 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK68.23 Sq.mts. ( 734 Sq.ft. )6
3 Booked50% Booked
50% Booked
FLAT TO OLD MEMBERS51.36 Sq.mts. ( 553 Sq.ft. )16
16 Booked100% Booked
100% Booked
28 total apartments / 22 apartments booked. 78% apartments booked.
Work Description in Building Triveni CallypsoCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Sumukh Infraproject
for Project
Borivali New Roma Sadan Chsl
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation