Project overview

Blossom Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800028538. Blossom Residency is located at 400057. This is a New Project being developed by Hf Realty.

Blossom Residency has 1 BHK & 2 BHK Apartments with carpet areas ranging from 370 to 636 Sq.ft. Carpet. The Project has total 46 of which 34 are currently available for sale.

Blossom Residency is being developed on a total land area of 10736 Sq.ft. Blossom Residency has 2 Wings / Towers A Wing,B Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Blossom Residency
  • Location:
  • 400057
  • Const. Stage:
    New Project
  • Possession:
    30 Jun 2024
Developer Details

  • Developer:
    Hf Realty
  • Phone:
  • Address:
  • 53, Hf Realty, Tejpal Road, Oppo Railway Station, Vileparle (East), 400057
Project RERA Details
MAHA REARA No: P51800028538
Project Type Residential
RERA Project Status New Project
Funding Bank AXIS BANK LIMITED
Proposed Possession 30 Jun 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 22 Dec 2023
Last Retrived 28 Jul 2025
Blossom Residency QR Code
Blossom Residency
MahaRERA - P51800028538
Apartment Details & Configuration
TypeArea
1 BHK26.5 Sq.mts. ( 285 Sq.ft. )
1 BHK34.37 Sq.mts. ( 370 Sq.ft. )
1 BHK36.65 Sq.mts. ( 395 Sq.ft. )
2 BHK59.07 Sq.mts. ( 636 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Blossom Residencylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Will Be Provided
Electrical Meter Room, Sub-Station, Receiving Station60% completed
60% Complete
In Process
Energy management
Will Be Provided
Fire Protection And Fire Safety Requirements30% completed
30% Complete
In Process
Landscaping & Tree Planting
Will Be Provided
Open Parking
Will Be Provided
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
In Process
Solid Waste Management And Disposal
Na
Storm Water Drains50% completed
50% Complete
In Process
Street Lighting
Will Be Provided
Treatment And Disposal Of Sewage And Sullage Water
Will Be Provided
Water Conservation, Rain water Harvesting
Will Be Provided
Water Supply
Will Be Provided
Buildings / Wings in Blossom Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Blossom Residency by Hf Realtylast updated on 28 Jul 2025 as per information obtained from MARA RERA.

10736 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

46 apartments in total
Total
46
Booked
12
Available
34

Saleable Area Statistics (Sq. ft.)

20091 Total
Total
20091
Booked
6857
Available
13234
Total 46 apartments in project. 12 apartments booked. 26% apartments booked.
Total 20091 Sq.ft. saleable area. 6857 saleable area booked.
34% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 202314101080
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.5 Sq.mts. ( 285 Sq.ft. )8
None Booked0% Booked
0% Booked
8 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 202314101080
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.37 Sq.mts. ( 370 Sq.ft. )13
1 BHK36.65 Sq.mts. ( 395 Sq.ft. )12
2 BHK59.07 Sq.mts. ( 636 Sq.ft. )13
9 Booked69% Booked
69% Booked
38 total apartments / 12 apartments booked. 31% apartments booked.
Work Description in Building B WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Hf Realty
for Project
Blossom Residency
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation