Project overview

Blossom Height is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700034602. Blossom Height is located at S No 5/25/A. This is a New being developed by Shiv Sai Constructions.

Blossom Height has Bungalow Apartments with carpet areas ranging from 389 to 527 Sq.ft. Carpet. The Project has total 44 of which 44 are currently available for sale.

Blossom Height is being developed on a total land area of 11410 Sq.ft. Blossom Height has 2 Wings / Towers Blossom Height,Bunglow

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Blossom Height
  • Location:
  • S No 5/25/A
  • Const. Stage:
    New
  • Possession:
    31 Dec 2024
Developer Details

  • Developer:
    Shiv Sai Constructions
  • Phone:
  • Address:
  • Mittal Society
Project RERA Details
MAHA REARA No: P51700034602
Project Type Residential / Group Housing
RERA Project Status New
Architect Acotech Consultants Private Limited
Funding Bank IDBI BANK
Proposed Possession 31 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 20 Mar 2025
Last Retrived 26 Jul 2025
Blossom Height QR Code
Blossom Height
MahaRERA - P51700034602
Apartment Details & Configuration
TypeArea
1 BHK29.69 Sq.mts. ( 320 Sq.ft. )
1 BHK34.25 Sq.mts. ( 369 Sq.ft. )
1RK23.73 Sq.mts. ( 255 Sq.ft. )
Bungalow36.17 Sq.mts. ( 389 Sq.ft. )
Bungalow48.99 Sq.mts. ( 527 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Blossom Heightlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Yet Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Work Not Yet Started
Sewerage (Chamber, Lines, Septic Tank , STP)
Municipal Sewer Line
Solid Waste Management And Disposal
Segregation At Source. Disposal Through Municipal
Storm Water Drains
Work Not Yet Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Municipal Sewer Line
Water Supply
Water Supply From Mjp
Buildings / Wings in Blossom Height
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Blossom Height by Shiv Sai Constructionslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

11410 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

44 apartments in total
Total
44
Booked
0
Available
44

Saleable Area Statistics (Sq. ft.)

14898 Total
Total
14898
Booked
0
Available
14898
Total 44 apartments in project. 0 apartments booked. 0% apartments booked.
Total 14898 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Blossom Height

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Blossom HeightDec 2024810104020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.69 Sq.mts. ( 320 Sq.ft. )26
None Booked0% Booked
0% Booked
1 BHK34.25 Sq.mts. ( 369 Sq.ft. )14
None Booked0% Booked
0% Booked
1RK23.73 Sq.mts. ( 255 Sq.ft. )2
None Booked0% Booked
0% Booked
42 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Blossom HeightCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Bunglow

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
BunglowDec 20242100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow36.17 Sq.mts. ( 389 Sq.ft. )1
None Booked0% Booked
0% Booked
Bungalow48.99 Sq.mts. ( 527 Sq.ft. )1
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building BunglowCompletion
Basement (if any)
Excavation
work-in-progress50% done
50% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shiv Sai Constructions
for Project
Blossom Height
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation