Project overview

Bldg No-1 M.Baria Everest is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000004326. Bldg No-1 M.Baria Everest is located at S No-35 Hissa No 8 And S No 36 Hissa No 1-9. This is a Ongoing being developed by Moreshwar Krushna Baria.

Bldg No-1 M.Baria Everest has 1 BHK Apartments with carpet areas ranging from 335 to 335 Sq.ft. Carpet. The Project has total 112 of which 4 are currently available for sale.

Bldg No-1 M.Baria Everest is being developed on a total land area of 13993 Sq.ft. out of which 8173 Sq.ft. i.e 58% is reserved for recreational purposes. Bldg No-1 M.Baria Everest has 1 Wings / Towers Bldg No-1

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Bldg No-1 M.Baria Everest
  • Location:
  • S No-35 Hissa No 8 And S No 36 Hissa No 1-9
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2017
Developer Details

  • Developer:
    Moreshwar Krushna Baria
  • Phone:
  • Address:
  • Sheetal Co Op Hsg Soc Ltd
Project RERA Details
MAHA REARA No: P99000004326
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Mr. Abhay Damodar Raut
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 31 Dec 2017
Revised Possession 31 Dec 2017
Extended Possession 30 Mar 2022
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 28 Jul 2025
Bldg No-1 M.Baria Everest QR Code
Bldg No-1 M.Baria Everest
MahaRERA - P99000004326
Apartment Details & Configuration
TypeArea
1 BHK31.15 Sq.mts. ( 335 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Bldg No-1 M.Baria Everestlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Rg Area Common For Entire Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Electrical Meter Room Provided
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Fire Noc Given By Vvcmc
Landscaping & Tree Planting100% completed
95% Complete
As Per Tree Noc Given By Vvcmc Tree Noc
Open Parking
To Be Handed Over To The Society
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
To Be Connected To Vvcmc Storm Water Drains
Street Lighting100% completed
95% Complete
To Be Completed Before Oc
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Vvcmc Guidelines
Water Supply100% completed
95% Complete
After Commencement Of Vvcmc Water Suppy
Buildings / Wings in Bldg No-1 M.Baria Everest
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Bldg No-1 M.Baria Everest by Moreshwar Krushna Barialast updated on 28 Jul 2025 as per information obtained from MARA RERA.

13993 Sq. ft.

Project Area

8173 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

112 apartments in total
Total
112
Booked
108
Available
4

Saleable Area Statistics (Sq. ft.)

37553 Total
Total
37553
Booked
36212
Available
1341
Total 112 apartments in project. 108 apartments booked. 96% apartments booked.
Total 37553 Sq.ft. saleable area. 36212 saleable area booked.
96% area booked.

Bldg No-1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No-1Mar 2020151010913
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.15 Sq.mts. ( 335 Sq.ft. )112
108 Booked96% Booked
96% Booked
112 total apartments / 108 apartments booked. 96% apartments booked.
Work Description in Building Bldg No-1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Moreshwar Krushna Baria
for Project
Bldg No-1 M.Baria Everest
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation