Project overview

BLDG C6/01, C6/02 AND C6/03 NEEL SIDHI PRIME is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000003241. BLDG C6/01, C6/02 AND C6/03 NEEL SIDHI PRIME is located at 2422Pt And 252Pt. This is a Ongoing being developed by NEEL SIDHI PROPERTIES LLP.

BLDG C6/01, C6/02 AND C6/03 NEEL SIDHI PRIME has 2.5 BHK Apartments with carpet areas ranging from 545 to 547 Sq.ft. Carpet. The Project has total 36 of which 0 are currently available for sale.

BLDG C6/01, C6/02 AND C6/03 NEEL SIDHI PRIME is being developed on a total land area of 20937 Sq.ft. BLDG C6/01, C6/02 AND C6/03 NEEL SIDHI PRIME has 3 Wings / Towers C6/01 Neel Sidhi Prime,C6/02 Neel Sidhi Prime,C6/03 Neel Sidhi Prime

ProjectDeveloperLocationPossession
Subham Complex - Wing B - Ground, 3Rd To 6Th FloorSubham Commercial Enterprises Pvt. Ltd.Raigarh, Na, 41020630-06-2013 00:00:00
NEELKANTH VANDANROOPA ASSOCIATESFinal Plot No 40720-06-2019 00:00:00
GOVIND HARMONYPRIYAL HOMESFinal Plot No 42831-03-2018 00:00:00
SHREE RAM KALPANANEELKANTH ASSOCIATESFinal Plot No. 206/831-12-2017 00:00:00
NEELKANTH PRAJAKTNEELKANTH CONSTRUCTIONSFinal Plot No 72/B31-12-2017 00:00:00
Gokul NiwasShree Krishna DevelopersPlot No - 2030-09-2020 00:00:00
KVK KESHAR BAUG IM/S. KVK HOMES597A Part 598A 598 1A 598B 598 1B08-11-2021 00:00:00
HATIMI HOMESPROSPERITY DEVELOPERSCts No 12581B07-12-2020 00:00:00
Neelkanth SanskrutiNeelkanth Constructions410206, Raigarh, Karanjade15-09-2019 00:00:00
Ananta ResidencySuresh Lacchiram AgarwalWet+Hqxxriss+Wai4g9ita==30-06-2027 00:00:00
SAI ARCADENIKHIL ENTERSISESRaigarh, 41020618-09-2026 00:00:00
Sai Siddhi ResidencyPrakruti Manohar MhatrePlot No 1 Survey No 479/A131-07-2019 00:00:00
ROYAL PRIDEROYAL BUILDERS AND DEVELOPERS205/6031-03-2018 00:00:00
National HarmonySunny Housing [india] P LtdPlot No 530-12-2021 00:00:00
M/s.New Saikrupa Panvel CHS LtdM/s.Sai RealtyFinal Plot No.201/2B06-10-2019 00:00:00
MUNOTH EMPRESSARHAM DEVELOPERS18931-12-2018 00:00:00
HAPPY HOME CHS LTDJAY ENTERPRISESPlot No. 50/37, Pardeshi Ali, Maharana Pratap Road30-09-2018 00:00:00
BLDG C6/01, C6/02 AND C6/03 NEEL SIDHI PRIMENEEL SIDHI PROPERTIES LLP2422Pt And 252Pt31-03-2018 00:00:00
GOKUL VANMUKESH UTTAM GAIKWAD11218-08-2022 00:00:00
PRAJAPATI ORNATEPRAJAPATI CONSTRUCTIONS LIMITEDPlot No 191 To 197 And Plot No 199 To 20630-12-2025 00:00:00
SunflowerSapan NaskarUlwe30-10-2023 00:00:00
A K ORIONA K DEVELOPERSPlot No. 4,Sector 16, Taloja31-03-2019 00:00:00
EV CITY CENTREEV HOMES CONSTRUCTIONS PVT LTD6311 6312 662C30-09-2020 00:00:00
SAINATH HERITAGESAINATH ENTERPRISESPlot No. 21A2/3, Thana Naka, Panvel31-12-2018 00:00:00
OM DATTAPRASAD CO OP HSG SOCIETY LTDKIRAN NARAYAN MANOREC.T.S. No. 1269-A And 127031-12-2017 00:00:00
Eakadanta Sankul Phase- IIIEAKADANTA REALTORSSurvey No 27230-06-2026 00:00:00
Eakadanta Sankul Phase-IIEAKADANTA REALTORSSurvey No. 27230-06-2023 00:00:00
AVIGHNAV.S.CONSTRUCTIONSPlot No.26830-12-2022 00:00:00
RajRajhas EnterpriseCts No1579,1580,158130-12-2021 00:00:00
SHRI NAMRATA KUNJNARENDRA DHADVE145/170/331-12-2018 00:00:00
SHIV RESIDENCYSHIV ENTERPRISE146/131-12-2019 00:00:00
SHREE CHINMAY GAURANG GRIHSANKULSHREE CHINMAY GAURANG INFRASTRUCTUREFinal Plot No. 263, Uran Naka, Panvel30-09-2020 00:00:00
Eakadanta Sankul Phase-IEAKADANTA REALTORSSurvey No 27/230-12-2020 00:00:00
RAM SUBHADRARachana Construction955, 95631-03-2018 00:00:00
AMOL SAMARTHSACHIN TILAKCHAND KOTHARI532, 532/1, 532/230-01-2021 00:00:00
SHIVSHANKAR KALASHSURESH SHIVSHANKAR SHARMA0701-06-2018 00:00:00
DURGA RESIDENCYSHREE GANESH BUILDERS & DEVELOPERS10830-09-2018 00:00:00
SWASTIK ENTERPRISESM/S. SWASTIK ENTERPRISESFinal Plot 410/3 And 430-06-2019 00:00:00
Suryakant ResidencyAshwini R Constructions Pvt LtdHouse No - 11131-07-2018 00:00:00
SAI SARANGV B REALITIES850, 850/1, 849,849/1,849/2,849/331-03-2019 00:00:00
Mahalaxmi City Type EMahalaxmi BuildersVihighar31-12-2015 00:00:00
SHAMA VILLAROYAL ENTERPRISES524/2131-12-2018 00:00:00
JUNCTION 406MISHAL REALTY406 1/B 31-12-2017 00:00:00
CROWN EUREKAASGARALI HUSEINIBHAI CONTRACTORPlot No 62 , Sector 4 Karanjade01-01-2018 00:00:00
Mateshwari DesireMateshwari Housing LLPGut No. 102/2/105, Plot No31 And Gut No102/2/105, Plot No3231-12-2019 00:00:00
SHRI HIMGIRIPYRAMID DEVELOPERSFinal Plot No 119/130-05-2020 00:00:00
LEVANTEAVICON INFRA LLPPlot No 257 Sector 17 Ulwe30-09-2020 00:00:00
PRAGATI AVENUEPRAGATI REALTY85/8631-12-2018 00:00:00
Omkara HillsOmkara Builders & DevelopersPlot No 60, Sector 631-12-2019 00:00:00
NaivedyaKroopa PropertiesRaigarh15-12-2020 00:00:00
Ashiyana C.H.S RedevelopmentPUNIT ENTERPRISES107A31-03-2018 00:00:00
USHAPRABHA CHSSHASHIKANT GAJANAN POTECts No. 1367/A-1, Prabhu Ali31-12-2019 00:00:00
Mahalaxmi Nagar StandardMahalaxmi Developers410206, Raigarh31-12-2014 00:00:00
RUMEE REGENCYSHABBIR MOHIDDIN SHEIKH120/130-06-2021 00:00:00
AADITYA GURUKRUPAARVIND MAHADEV SAWLEKAR226/2,3,430-12-2021 00:00:00
NEELKANTH SURYODAYNEELKANTH CONSTRUCTIONSPlot No. 1715-12-2022 00:00:00
SHUBHASHREE APARTMENTRAMESH GULAB TUPE10431-12-2019 00:00:00
SAI SAFALYAPRASAD ESTATE65930-12-2021 00:00:00
PRIYANSHI RESIDENCYSHIVKRUPA BUILDERS AND DEVELOPERSS.No 12/1,230-06-2021 00:00:00
Esquire homes - AEsquire Realtors1169, 1169131-03-2018 00:00:00
Esquire Homes - BEsquire Realtors116831-03-2018 00:00:00
PARK PLAZAF K CONSTRUCTION214,214/1,215,21630-12-2021 00:00:00
APEX ADDRESSAPEX BUILDCONPlot No 221 Sector R430-06-2023 00:00:00
Rudra DhumravarnaSITARAM JANARDAN HUDDARFinal Plot No. 205/57, Plot No. 7131-01-2028 00:00:00
YASHOMANGAL C.H.S.Kedar BuildconSurvey No. 632 , 633 , 633/130-09-2028 00:00:00
AURA LUXISCAVISHWAKARMA BHAGYODAYA AARSH VENTURESPlot No - 630-03-2025 00:00:00
SAI ARJUNSWAPNIL MOHAN KALYANKARFinal Plot No 390 Sub Plot No 331-12-2026 00:00:00
Mauli DarshanGuru Sai Developer31-12-2028 00:00:00
Mangla NiwasNasir Mohammedsaid SayyedSurvey No- 715B, 715C, 715A/1, 715A/4, 714/1, 715A/231-03-2019 00:00:00
PRAYAG MEADOWS PHASE - lPRAYAG BUILDERS AND DEVELOPERS19/1A /325-12-2022 00:00:00
DECCAN SQUAREAFZAL UMER FURNITUREWALA18/1,18/2,20/430-10-2024 00:00:00
NAVANKUR CO-OPERATIVE HOUSING SOCIETY LTD.KEDAR BUILDCON PRIVATE LIMITEDFinal Plot No.-50/4/C31-03-2026 00:00:00
YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD.KEDAR BUILDCON PRIVATE LIMITEDFinal Plot No.- 228/531-03-2026 00:00:00
Sai AnantSai Anant EnterprisesF P No 409/A, 410/231-12-2026 00:00:00
PRAJAPATI OPAL PHASE - IIPRAJAPATI CONSTRUCTIONS LIMITEDPlot No. 172 To 174 & Plot No. 186 To 19030-06-2026 00:00:00
PRAJAPATI ORNATE PHASE - IIPRAJAPATI CONSTRUCTIONS LIMITEDPlot No 191 To 197 And Plot No 199 To 20630-06-2026 00:00:00
DEVASHREE AANGANSHASHIKANT MARUTI DISALERaigarh, 41020609-02-2023 00:00:00
Tricity CrestTricity Realty LLPPlot No. 13, Sector - 2031-12-2027 00:00:00
NILKANTH WISTERIANILKANTH SUPERSTRUCTURES LLP8A31-10-2028 00:00:00
Saras VatikaKT & LK SWEET HOMESPlot No 16 Sector 2031-12-2028 00:00:00
SHIVSAGARJIJAU HOUSINGPlot No 17 Sector 2031-05-2027 00:00:00
THE OLYMPIAKALPANA STRUCT CON INFRA LLP6E And 6F, Sector 16, Panvel West31-12-2028 00:00:00
EKDANT ENCLAVELandmark Builders And DevelopersPlot No 11411-08-2023 00:00:00
KUBER DARSHANJITENDRA GOVIND SOMASEPlot No 443, Sector 2430-03-2023 00:00:00
Satyam Le 36M/S Satyam Infra Realty Llp30-11-2029 00:00:00
Gurukrupa HeightsGurukrupa Reality31-12-2027 00:00:00
Vidyut Co-Operative Housing Society LtdJ.B. Construction31-08-2028 00:00:00
HirakunjPinnacle Builders And Developers30-06-2028 00:00:00
SunflowerKedar BuildconFinal Plot No.- 226/331-12-2025 00:00:00
Munot Vastu Exotica Phase -IIIVastu InfrastructureFinal Plot No. 16/331-03-2030 00:00:00
Building No. 2, Uptown AvenueSimran EnterprisesSurvey No. 743-2, 3A31-12-2017 00:00:00
Project Details
  • Project:
    BLDG C6/01, C6/02 AND C6/03 NEEL SIDHI PRIME
  • Location:
  • 2422Pt And 252Pt
  • Const. Stage:
    Ongoing
  • Possession:
    31 Mar 2018
Developer Details

  • Developer:
    NEEL SIDHI PROPERTIES LLP
  • Phone:
  • Address:
  • The Emerald
Project RERA Details
MAHA REARA No: P52000003241
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Soyuz Talib Architects Private Limited
Funding Bank STATE BANK OF INDIA
Proposed Possession 31 Mar 2018
Revised Possession 31 Mar 2018
Extended Possession
Litigations No Litigations
Last Modified 05 Aug 2017
Last Retrived 14 Feb 2026
BLDG C6/01, C6/02 AND C6/03 NEEL SIDHI PRIME QR Code
BLDG C6/01, C6/02 AND C6/03 NEEL SIDHI PRIME
MahaRERA - P52000003241
Apartment Details & Configuration
TypeArea
2.5 BHK50.67 Sq.mts. ( 545 Sq.ft. )
2.5 BHK50.82 Sq.mts. ( 547 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of BLDG C6/01, C6/02 AND C6/03 NEEL SIDHI PRIMElast updated on 14 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Done
Landscaping & Tree Planting100% completed
95% Complete
Done
Open Parking100% completed
95% Complete
Done
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Done
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Done
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Done
Water Supply100% completed
95% Complete
Done
Buildings / Wings in BLDG C6/01, C6/02 AND C6/03 NEEL SIDHI PRIME
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of BLDG C6/01, C6/02 AND C6/03 NEEL SIDHI PRIME by NEEL SIDHI PROPERTIES LLPlast updated on 14 Feb 2026 as per information obtained from MARA RERA.

20937 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

36 apartments in total
Total
36
Booked
36
Available
0

Saleable Area Statistics (Sq. ft.)

19664 Total
Total
19664
Booked
19664
Available
0
Total 36 apartments in project. 36 apartments booked. 100% apartments booked.
Total 19664 Sq.ft. saleable area. 19664 saleable area booked.
100% area booked.

C6/01 Neel Sidhi Prime

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C6/01 Neel Sidhi PrimeAug 20177101068
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK50.67 Sq.mts. ( 545 Sq.ft. )6
6 Booked100% Booked
100% Booked
2.5 BHK50.82 Sq.mts. ( 547 Sq.ft. )6
6 Booked100% Booked
100% Booked
12 total apartments / 12 apartments booked. 100% apartments booked.
Work Description in Building C6/01 Neel Sidhi PrimeCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

C6/02 Neel Sidhi Prime

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C6/02 Neel Sidhi PrimeAug 20177101077
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK50.67 Sq.mts. ( 545 Sq.ft. )6
6 Booked100% Booked
100% Booked
2.5 BHK50.82 Sq.mts. ( 547 Sq.ft. )6
6 Booked100% Booked
100% Booked
12 total apartments / 12 apartments booked. 100% apartments booked.
Work Description in Building C6/02 Neel Sidhi PrimeCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

C6/03 Neel Sidhi Prime

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C6/03 Neel Sidhi PrimeAug 20177101061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK50.67 Sq.mts. ( 545 Sq.ft. )6
6 Booked100% Booked
100% Booked
2.5 BHK50.82 Sq.mts. ( 547 Sq.ft. )6
6 Booked100% Booked
100% Booked
12 total apartments / 12 apartments booked. 100% apartments booked.
Work Description in Building C6/03 Neel Sidhi PrimeCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
NEEL SIDHI PROPERTIES LLP
for Project
BLDG C6/01, C6/02 AND C6/03 NEEL SIDHI PRIME
last updated on 14 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation