Project overview

Bhoomi Classic Building No. 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000004505. Bhoomi Classic Building No. 2 is located at S No. 143, S No. 145 H No. 2, S No. 161 H No 1Plus2/7. This is a Ongoing being developed by Apna Sai Builders And Developers.

Bhoomi Classic Building No. 2 has FLAT Apartments with carpet areas ranging from 25228 to 25228 Sq.ft. Carpet. The Project has total 178 of which 148 are currently available for sale.

Bhoomi Classic Building No. 2 is being developed on a total land area of 38089 Sq.ft. out of which 2153 Sq.ft. i.e 6% is reserved for recreational purposes. Bhoomi Classic Building No. 2 has 4 Wings / Towers A Wing,B Wing,C Wing Proposed,D Wing Proposed

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Bhoomi Classic Building No. 2
  • Location:
  • S No. 143, S No. 145 H No. 2, S No. 161 H No 1Plus2/7
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2026
Developer Details

  • Developer:
    Apna Sai Builders And Developers
  • Phone:
  • Address:
  • Bhoomi Classic
Project RERA Details
MAHA REARA No: P99000004505
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Shree Consultants
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 30 Dec 2026
Revised Possession 30 Dec 2026
Extended Possession
Litigations No Litigations
Last Modified 09 Aug 2017
Last Retrived 28 Jul 2025
Bhoomi Classic Building No. 2 QR Code
Bhoomi Classic Building No. 2
MahaRERA - P99000004505
Apartment Details & Configuration
TypeArea
1 BHK43.93 Sq.mts. ( 473 Sq.ft. )
1 BHK34.08 Sq.mts. ( 367 Sq.ft. )
1 BHK34.68 Sq.mts. ( 373 Sq.ft. )
1 BHK36 Sq.mts. ( 388 Sq.ft. )
1 BHK36.02 Sq.mts. ( 388 Sq.ft. )
1 BHK36.89 Sq.mts. ( 397 Sq.ft. )
1RK24.03 Sq.mts. ( 259 Sq.ft. )
1RK28.18 Sq.mts. ( 303 Sq.ft. )
1RK25.92 Sq.mts. ( 279 Sq.ft. )
1RK28.53 Sq.mts. ( 307 Sq.ft. )
SHOP6.64 Sq.mts. ( 71 Sq.ft. )
SHOP7.12 Sq.mts. ( 77 Sq.ft. )
SHOP7.76 Sq.mts. ( 84 Sq.ft. )
SHOP8.72 Sq.mts. ( 94 Sq.ft. )
SHOP8.88 Sq.mts. ( 96 Sq.ft. )
SHOP9.85 Sq.mts. ( 106 Sq.ft. )
STORE10.03 Sq.mts. ( 108 Sq.ft. )
FLAT2343.7 Sq.mts. ( 25228 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Bhoomi Classic Building No. 2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space50% completed
50% Complete
200 Sq.Mt. Garden
Community Buildings
260 Sq. Mt. Cfc
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Meter Room Installed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Fire Noc
Landscaping & Tree Planting100% completed
95% Complete
As Per Norms
LIFT100% completed
95% Complete
Lift Installed
Open Parking100% completed
95% Complete
27 Nos.
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Norms
Solid Waste Management And Disposal
Waste Will Be Collected In Separate Dustbins
Storm Water Drains100% completed
95% Complete
As Per Norms
Street Lighting
After Oc
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Norms
Water Supply50% completed
50% Complete
Vvcmc Will Give After Oc
Buildings / Wings in Bhoomi Classic Building No. 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Bhoomi Classic Building No. 2 by Apna Sai Builders And Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

38089 Sq. ft.

Project Area

2153 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

178 apartments in total
Total
178
Booked
30
Available
148

Saleable Area Statistics (Sq. ft.)

3045438 Total
Total
3045438
Booked
9940
Available
3035498
Total 178 apartments in project. 30 apartments booked. 16% apartments booked.
Total 3045438 Sq.ft. saleable area. 9940 saleable area booked.
0% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 2025111000130
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK43.93 Sq.mts. ( 473 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK34.08 Sq.mts. ( 367 Sq.ft. )6
2 Booked33% Booked
33% Booked
1 BHK34.68 Sq.mts. ( 373 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK36 Sq.mts. ( 388 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK36.02 Sq.mts. ( 388 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK36.89 Sq.mts. ( 397 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHKPROPOSED36.89 Sq.mts. ( 397 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK24.03 Sq.mts. ( 259 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK28.18 Sq.mts. ( 303 Sq.ft. )6
2 Booked33% Booked
33% Booked
1RKPROPOSEDRA28.18 Sq.mts. ( 303 Sq.ft. )1
None Booked0% Booked
0% Booked
20 total apartments / 11 apartments booked. 55% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 2025111000140
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.68 Sq.mts. ( 373 Sq.ft. )7
4 Booked57% Booked
57% Booked
1 BHK36 Sq.mts. ( 388 Sq.ft. )7
4 Booked57% Booked
57% Booked
1 BHK36.02 Sq.mts. ( 388 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK36.89 Sq.mts. ( 397 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK25.92 Sq.mts. ( 279 Sq.ft. )7
5 Booked71% Booked
71% Booked
1RK28.18 Sq.mts. ( 303 Sq.ft. )7
3 Booked42% Booked
42% Booked
1RK28.53 Sq.mts. ( 307 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP6.64 Sq.mts. ( 71 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP7.12 Sq.mts. ( 77 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP7.76 Sq.mts. ( 84 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP8.72 Sq.mts. ( 94 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP8.88 Sq.mts. ( 96 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP9.85 Sq.mts. ( 106 Sq.ft. )1
None Booked0% Booked
0% Booked
STORE10.03 Sq.mts. ( 108 Sq.ft. )1
None Booked0% Booked
0% Booked
38 total apartments / 19 apartments booked. 50% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C Wing ProposedJan 190011101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT2343.7 Sq.mts. ( 25228 Sq.ft. )60
None Booked0% Booked
0% Booked
60 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C Wing ProposedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

D Wing Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D Wing ProposedJan 190011101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT2343.7 Sq.mts. ( 25228 Sq.ft. )60
None Booked0% Booked
0% Booked
60 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building D Wing ProposedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Apna Sai Builders And Developers
for Project
Bhoomi Classic Building No. 2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation