Project overview

Bhoomi Classic Building No. 02 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000030044. Bhoomi Classic Building No. 02 is located at 143, 145, 161. This is a New being developed by Apna Sai Builders And Developers.

Bhoomi Classic Building No. 02 has Proposed Apartments with carpet areas ranging from 0 to 0 Sq.ft. Carpet. The Project has total 215 of which 117 are currently available for sale.

Bhoomi Classic Building No. 02 is being developed on a total land area of 24477 Sq.ft. out of which 8574 Sq.ft. i.e 35% is reserved for recreational purposes. Bhoomi Classic Building No. 02 has 2 Wings / Towers C D Wing,D Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Bhoomi Classic Building No. 02
  • Location:
  • 143, 145, 161
  • Const. Stage:
    New
  • Possession:
    31 Dec 2028
Developer Details

  • Developer:
    Apna Sai Builders And Developers
  • Phone:
  • Address:
  • Bhoomi Classic,
Project RERA Details
MAHA REARA No: P99000030044
Project Type Residential / Group Housing
RERA Project Status New
Architect Shyam R Kashid
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 31 Dec 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Mar 2024
Last Retrived 28 Jul 2025
Bhoomi Classic Building No. 02 QR Code
Bhoomi Classic Building No. 02
MahaRERA - P99000030044
Apartment Details & Configuration
TypeArea
1 BHK27.59 Sq.mts. ( 297 Sq.ft. )
1 BHK28.41 Sq.mts. ( 306 Sq.ft. )
1 BHK28.52 Sq.mts. ( 307 Sq.ft. )
1 BHK28.8 Sq.mts. ( 310 Sq.ft. )
1 BHK28.82 Sq.mts. ( 310 Sq.ft. )
1 BHK28.87 Sq.mts. ( 311 Sq.ft. )
1 BHK28.93 Sq.mts. ( 311 Sq.ft. )
1 BHK29.41 Sq.mts. ( 317 Sq.ft. )
1 BHK30.63 Sq.mts. ( 330 Sq.ft. )
1 BHK33.31 Sq.mts. ( 359 Sq.ft. )
1 BHK35.5 Sq.mts. ( 382 Sq.ft. )
1 BHK24.87 Sq.mts. ( 268 Sq.ft. )
1RK21.16 Sq.mts. ( 228 Sq.ft. )
1RK24.12 Sq.mts. ( 260 Sq.ft. )
2 BHK39.6 Sq.mts. ( 426 Sq.ft. )
2 BHK42.02 Sq.mts. ( 452 Sq.ft. )
2 BHK42.04 Sq.mts. ( 453 Sq.ft. )
2 BHK39.27 Sq.mts. ( 423 Sq.ft. )
2 BHK45.62 Sq.mts. ( 491 Sq.ft. )
3 BHK49.16 Sq.mts. ( 529 Sq.ft. )
Proposed0 Sq.mts. ( 0 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Bhoomi Classic Building No. 02last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
260 Sq Mt Cfc As Shown In Plan
Electrical Meter Room, Sub-Station, Receiving Station
As Per Norms
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Fire Noc
Landscaping & Tree Planting
As Per Tree Noc
Lift
As Per Plan
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)30% completed
30% Complete
As Per Norms
Solid Waste Management And Disposal
Waste Will Be Collected Separate Dustbin
Storm Water Drains
As Per Norms
Street Lighting
After Oc
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Norms
Water Supply
Vvmc Will Give Water Connection After Oc
Buildings / Wings in Bhoomi Classic Building No. 02
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Bhoomi Classic Building No. 02 by Apna Sai Builders And Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

24477 Sq. ft.

Project Area

8574 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

215 apartments in total
Total
215
Booked
98
Available
117

Saleable Area Statistics (Sq. ft.)

73160 Total
Total
73160
Booked
35718
Available
37442
Total 215 apartments in project. 98 apartments booked. 45% apartments booked.
Total 73160 Sq.ft. saleable area. 35718 saleable area booked.
49% area booked.

C D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C D WingDec 202816000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.59 Sq.mts. ( 297 Sq.ft. )16
1 BHK28.41 Sq.mts. ( 306 Sq.ft. )32
9 Booked28% Booked
28% Booked
1 BHK28.52 Sq.mts. ( 307 Sq.ft. )9
8 Booked88% Booked
88% Booked
1 BHK28.8 Sq.mts. ( 310 Sq.ft. )16
None Booked0% Booked
0% Booked
1 BHK28.82 Sq.mts. ( 310 Sq.ft. )14
7 Booked50% Booked
50% Booked
1 BHK28.87 Sq.mts. ( 311 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK28.93 Sq.mts. ( 311 Sq.ft. )16
9 Booked56% Booked
56% Booked
1 BHK29.41 Sq.mts. ( 317 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK30.63 Sq.mts. ( 330 Sq.ft. )7
3 Booked42% Booked
42% Booked
1 BHK33.31 Sq.mts. ( 359 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK35.5 Sq.mts. ( 382 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK24.87 Sq.mts. ( 268 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK24.87 Sq.mts. ( 268 Sq.ft. )13
5 Booked38% Booked
38% Booked
1RK21.16 Sq.mts. ( 228 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK24.12 Sq.mts. ( 260 Sq.ft. )16
2 BHK39.6 Sq.mts. ( 426 Sq.ft. )16
14 Booked87% Booked
87% Booked
2 BHK42.02 Sq.mts. ( 452 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK42.04 Sq.mts. ( 453 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK39.27 Sq.mts. ( 423 Sq.ft. )13
12 Booked92% Booked
92% Booked
2 BHK45.62 Sq.mts. ( 491 Sq.ft. )4
2 Booked50% Booked
50% Booked
3 BHK45.62 Sq.mts. ( 491 Sq.ft. )3
None Booked0% Booked
0% Booked
3 BHK49.16 Sq.mts. ( 529 Sq.ft. )7
4 Booked57% Booked
57% Booked
3 BHK39.27 Sq.mts. ( 423 Sq.ft. )3
1 Booked33% Booked
33% Booked
3 BHK42.04 Sq.mts. ( 453 Sq.ft. )3
1 Booked33% Booked
33% Booked
215 total apartments / 98 apartments booked. 45% apartments booked.
Work Description in Building C D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress30% done
30% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress71% done
71% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingDec 20280000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Proposed0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress20% done
20% Booked
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
work-in-progress46% done
46% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress46% done
46% Booked
Channel Partners
Channel Partners Registered by Developer
Apna Sai Builders And Developers
for Project
Bhoomi Classic Building No. 02
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation