Project overview

Bhavani Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800003594. Bhavani Heights is located at 99/4. This is a Ongoing being developed by Kalyani Enterprises.

Bhavani Heights has 1 BHK & 2 BHK Apartments with carpet areas ranging from 404 to 576 Sq.ft. Carpet. The Project has total 107 of which 24 are currently available for sale.

Bhavani Heights is being developed on a total land area of 48223 Sq.ft. Bhavani Heights has 2 Wings / Towers A Wing,B Wing

ProjectDeveloperLocationPossession
Arham VatikaArham EnterprisesS No.140 H. No. 8A31-07-2018 00:00:00
Shiv-GauriShivam Developers32/1/A/8/Plot No 830-12-2021 00:00:00
Om VatikaOm Shiv EnterprisesS No.105, H No.3P30-06-2018 00:00:00
PalmPranjee Properties Pvt. LtdPlot No. 528-05-2021 00:00:00
Vishnu Vatika Nx Wing C1 E1 E2 Phase 1Vishnu GroupS No. 131 /1 And 132/230-10-2023 00:00:00
Wing D- DurvankurM K Patil DevelopersGut No 8 P19-08-2019 00:00:00
Shubh AarambhPacific Construction & Developers105A, 3P, 830-04-2018 00:00:00
Hill Side Residency Wing A B And CSupreme Developers421503, Thane30-12-2022 00:00:00
Vedant Nakshatra Abc Phase 1Mohan Hardasmal TharwaniS No 70/1/2 And S No 70/5/B31-12-2017 00:00:00
Samruddhi Evergreens Phase-4CPoddar Housing And Development LimitedThane, 421503, -31-03-2020 00:00:00
Maple City Phase IShree Chintamani EnterprisesS No 141 S No143 H No 4A S No 144 H No 1A And 230-12-2021 00:00:00
Vastu SquareVastu BuildersS No 28A Hissa No 3/1P Plot No 7A31-03-2018 00:00:00
Samarth VatikaShree Samarth Associates122Asurvey No 32 Shirgaon Badlapur30-12-2018 00:00:00
Om Savai NiketanSagar Super Structures Private LimitedPlot Bearing S.No.143, H.No.5-631-05-2018 00:00:00
AsawariAshish Waman GoleSurvey No 38 Hissa No 2A1 And 2A2 , Plot No 3 And 531-03-2018 00:00:00
Tulsi AahanRaj GroupS. No.39 , H No. 1,2,331-12-2019 00:00:00
Kondilkar ResidencyAditi Construction50/6P01-01-2019 00:00:00
Amrut Vishwa Phase 2Sai Shradha DevelopersSurvey No. 173 Hissa No. 331-12-2019 00:00:00
Jadhav MarketS J Construction CoS No 48 Hissa No 11P And Hissa No 14 And Hissa No 15P20-12-2021 00:00:00
Aruna UlhasGaondevi Developers49/10/3,431-08-2018 00:00:00
ShulpaniShree Balaji Builders & DevelopersS No 53 H No 1531-08-2018 00:00:00
Satish Oak HeightShree Sai Prathamesh DevelopersS No 66 H No 911 B And C, S No 66 H No 1031-03-2026 00:00:00
Trident Tower Type DShri Krishna HomesS No 15 H No 1 Plot No C31-03-2025 00:00:00
Sarvesh Dream City Wing DSai Shradha DevelopersS No 76 H No 1531-12-2025 00:00:00
Swanand Treo Building No 3 -Swami GannayakSwanand HeightsSurvey No 13, Hissa No 231-12-2017 00:00:00
Ekdanta ApartmemtEashanya Builder And Developers421503, Thane31-12-2019 00:00:00
Sai Aangan - C WingShree Sai Chatra DevelopersS No 87 H No 5 P No 1 S No 87 H No 12 And 1331-12-2018 00:00:00
Shubh VatikaShubh Enterprises7A, H No 230-11-2018 00:00:00
BhagatiniwasShri Sadguru ConstructionSurvey No 42 P30-12-2018 00:00:00
Ravindranath Tagore NiketanSai City DevelopersSurvey No 45 Hissa No 4 Plot No 630-12-2020 00:00:00
Apte HomesShree Siddhi DevelopersSurvey No-44, Hissa No-1/A/331-12-2018 00:00:00
Pranjee Garden City Phase -IiPranjee Properties Pvt. LtdPlot No 330-11-2018 00:00:00
Sonal Co-Op Housing SocietySoham Developers4918231-01-2019 00:00:00
Thanekar ParadiseAjay Madhukar Thanekar81/1A30-12-2019 00:00:00
Motiram PuramNayan Dilip DalalSurvey No 183 H.No 9 Survey No 184 Hissa No 2A30-05-2022 00:00:00
Evergreen Residency C WingBalaji ConstructionS No 25 Hissa No 5 And 6 And S No 24 Hissa No 130-12-2022 00:00:00
Shree Datta Narhari ApartmentOmkar EnterprisesSurvey No 32,Hissa No 2,Plot No 901-12-2025 00:00:00
Amrut ManjilSai Shradha DevelopersS No 120 H No 4 & S No 120 H No 731-01-2028 00:00:00
Krishna DarshanKrishna BuildconSurvey No. 148, Hissa No. 20/A31-12-2025 00:00:00
Sai ShrutiPinnacle ConstructionsSurveyno 331-03-2018 00:00:00
Rubyana Residency Phase 1Sudhir Damodar GhatnekarSurvey No. 8930-06-2018 00:00:00
Vedant Imperial Abc Phase 1Mohan Hardasmal TharwaniS No 56/3 57/1P 57/330-11-2019 00:00:00
Ekdant SmaranPrashant Tukaram BaeetSurvey No. 41, H.No. 1, Plot No. 116-03-2021 00:00:00
Shivam GreensM.K.DevelopersGut No 5 Hissa No 6, 11 And 1330-12-2023 00:00:00
Madhumalti Apartment B WingShree Datta EnterprisesS No 105A, H No 4/2,3,431-03-2018 00:00:00
Avantika ResidencySanchita Construction28A/2/1P27-08-2018 00:00:00
Murlidhar PlazaSaipoojan EnterprisesGut No 40 Hissa No 1619-12-2021 00:00:00
ParshvadharaParshvanath Developers38 Hissa No 630-04-2019 00:00:00
Aditi PlazaChintamani Construction53/13P30-06-2018 00:00:00
Shree Sai PoojaM/S Mahalaxmi Construction Co.15/331-12-2019 00:00:00
Blue Diamond ResidencyKimaya ConstructionSurvey No 61 Hissa No 331-12-2019 00:00:00
Satvik E WingJigar EnterprisesS No 39 H No 6 Pt Plot No 1 And 1201-12-2019 00:00:00
Sai AanganPinnacle RealtorsSurvey No 181/2/3/4A30-01-2023 00:00:00
Khatri NxAashiyana ConstructionsGut No 111 Hissa No 3, 41, 4231-12-2019 00:00:00
Samarth ParadiseS P DevelopersS No 21 H No 1331-12-2026 00:00:00
Nav Avani ChsMangalya InfraS. No. 51, H. No. 3/A/30, Plot No. 3031-01-2025 00:00:00
Mangalam ArcadeMangalam EnterprisesSurvey No 7 Hissa No 1(P) Plot No 4224-04-2024 00:00:00
Sky HillSeven Hill Buildcon100/5A30-04-2019 00:00:00
LeelaanganPravin Kashinath Haware135/230-12-2022 00:00:00
Swami HighlandsShree Swami Samarth AssociatesSurvey No 10A Hissa No 5P,Plot No 10, 9A31-12-2019 00:00:00
Viraj IconicBonzer OrbitGut No.53/5, Plot No.1, Gut No.53/6,Plot No.2, Gut No.53/731-12-2026 00:00:00
Shreeji GreensDeep Laxmi AssociatesS No 70 H No 6A S No 70 H No 6B S No 73 H No 2 S No 73 H No 531-07-2026 00:00:00
Vinayak Kondilkar ArcadeVinayak Builders & Developers83/Part 131-12-2017 00:00:00
Swaroop OrchidSwaroop ConstructionS No 87 Hissa No 1130-06-2018 00:00:00
Shubh AanganShubh EnterprisesSurvey No 52 H No 3131-12-2019 00:00:00
Nirmala ParadisePokhriyal And AssociatesS No 12730-09-2024 00:00:00
Bingo Dham Co-Op Hsg Soc LtdSai ConstructionsThane, 421503, Badlapur31-12-2022 00:00:00
Daksh PalaceThakur DevelopersManjarli30-09-2024 00:00:00
AlankapuriAshish Waman GoleS.No 17/H.No 1 & H.No 8/Plot No. 101-05-2027 00:00:00
Shrihari Chandan ApartmentAbhishek Shelters LimitedCts No 1269, 127031-03-2028 00:00:00
Shivshakti PrimeShivshakti BuildconSurvey No-53 Hissa No- 4/130-09-2027 00:00:00
Spring Wood ParkSkyline Developers421503, Thane30-06-2018 00:00:00
The Address Ph-1 Wing ASadguru Associate421503, Thane, Badlapur31-08-2020 00:00:00
Parijat Plaza Type BM/S Parijat ConstructionsS No 49 H No 20 P No 10 S No 50 H No 731-05-2018 00:00:00
Nav Sai Chhaya Chs LtdNiket EnterprisesS No. 30 Final Plot No. H. No. 1/B1631-01-2020 00:00:00
Shubh AshishShubh BuildersS No 82 Hissa No 14-231-12-2019 00:00:00
Mohan Greenwoods Building 1Mohan Lifespaces LlpGut No 1Pt And 5Pt31-12-2019 00:00:00
Vastu Swapnapurty ResidencyVastu Builders And Developers3831-07-2023 00:00:00
Maitri HillsEshwar EnterprisesSurvey No 7 A H No 4 P Plo No 9 And 1030-06-2019 00:00:00
Sai HighlandShree Saikrupa DevelopersGat No 91 Hissa No 330-03-2022 00:00:00
Patil Hill ViewEkdant DevelopersS No 42 Hissa No 5 S No 57 Hissa 330-06-2018 00:00:00
Neelkanth DeepKeshav RealtySno-7A, H No-1/2 Plot-2 Moje Belavali30-06-2019 00:00:00
Bhakti Park B WingBhakti CorporationSurvey No 83 Hissa No 12A31-03-2018 00:00:00
Entilla By DevDev Konark CorporationSurvey No 98 Hissa No 4A30-09-2018 00:00:00
Bahinai BhuvanManoj Vasudev VaidyaCts No 22230-12-2020 00:00:00
NilgiriShivam DeveloperSurvey No 46 Hissa No 6A 19 Plot No 3230-05-2018 00:00:00
Olive - Phase Iii - Pranjee Garden CityPranjee Properties Pvt. LtdPlot No. 5 Part30-06-2024 00:00:00
Prapti HeritageTridev Enterprises1/730-06-2025 00:00:00
Laxmi Shankar ComplexAditi Buildwell175 P30-06-2028 00:00:00
Shreshtha Swapna Co-Op Housing Society LtdOm Shree Sai Builders And DevelopersTaluka Ambarnath31-12-2024 00:00:00
Uma Kunj Cooperative Housing Society LimitedPravin Arvind ApteSurvey No 50, H No.2B, S No. 51 H No.4/A/36 Plot No 35B15-12-2025 00:00:00
Siddhivinayak ResidencySairaj DevelopersS No 48 H No 2 P No 831-12-2024 00:00:00
Shubh HillsVardhman Enterprises1273C31-07-2018 00:00:00
Nirmal DharaSiddhivinayak EnterprisesS No. 4831-12-2019 00:00:00
Krishna ResidencyKrishna EnterprisesSurvey No 23, Hissa No 7/1,7/230-11-2018 00:00:00
Mahalaxmi ResidenceShree Mahalaxmi DevelopersCs No 1263 C.No. 19 Cs No 1264 C.No. 3931-12-2024 00:00:00
Vitthai Anant PlazaSharad GaikwadBadlapur31-12-2026 00:00:00
Shree Datta Samartha ChslShree Sai Swami EnterprisesS No-40 H No-6 P No-630-06-2023 00:00:00
Patels HorizonParamyogi Developers LlpSurvey No 52 Hissa No3/318-11-2027 00:00:00
Shree Ganraj ResidencyOm Sai ConstructionS No 4,H No 1, P No 731-12-2025 00:00:00
Shri Jiveshwar ApartmentOmkar EnterprisesSurvey No. 33,Hissa No. 7,Plot No.8 & 906-12-2028 00:00:00
Fulora Co-Op Housing Society LtdPinnacle CreatorsSurvey No 13 Hissa No 6 A 1731-07-2025 00:00:00
Shiv Tirth B WingGajraj EnterprisesSr No 36 Hissa No 3P Cts No 37931-12-2025 00:00:00
Balaji HeritageBalaji DevelopersSurvey No.28A, Hissa No. 2/2C31-12-2024 00:00:00
Sai FloraM/S Mitra Reality59, Hissa No 1 B Part31-12-2026 00:00:00
Vishwa Sky HighVineet InfrastructureSr No 7/A Hissa No 6/33,6/29,7/C,6/30/Kh,6/30/A Plot No 33,2924-11-2027 00:00:00
Shivam Paradise Phase IM K EnterprisesGut No 53 Hissa No 10 Plot No 7 And 831-12-2024 00:00:00
The Address Wing C Phase IiiSadguru AssociateGut No. 1 Hissa No 1/2, 3 & 3A31-12-2026 00:00:00
Project Details
  • Project:
    Bhavani Heights
  • Location:
  • 99/4
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Kalyani Enterprises
  • Phone:
  • Address:
  • Anita Kutir
Project RERA Details
MAHA REARA No: P51800003594
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Manan Dedhia
Funding Bank
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession
Litigations No Litigations
Last Modified 10 Oct 2017
Last Retrived 26 Jul 2025
Bhavani Heights QR Code
Bhavani Heights
MahaRERA - P51800003594
Apartment Details & Configuration
TypeArea
1 BHK29.08 Sq.mts. ( 313 Sq.ft. )
1 BHK34.59 Sq.mts. ( 372 Sq.ft. )
1 BHK34.63 Sq.mts. ( 373 Sq.ft. )
1 BHK35.05 Sq.mts. ( 377 Sq.ft. )
2 BHK43.77 Sq.mts. ( 471 Sq.ft. )
2 BHK44.5 Sq.mts. ( 479 Sq.ft. )
1 BHK37.54 Sq.mts. ( 404 Sq.ft. )
1 BHK39.22 Sq.mts. ( 422 Sq.ft. )
1 BHK41.6 Sq.mts. ( 448 Sq.ft. )
2 BHK50.8 Sq.mts. ( 547 Sq.ft. )
2 BHK51.32 Sq.mts. ( 552 Sq.ft. )
2 BHK53.52 Sq.mts. ( 576 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Bhavani Heightslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
Not Yet Started
Water Conservation, Rain water Harvesting
Not Yet Started
Treatment And Disposal Of Sewage And Sullage Water
Na
Street Lighting
Na
Storm Water Drains
Not Yet Started
Solid Waste Management And Disposal
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Yet Started
Open Parking
Not Yet Started
Landscaping & Tree Planting
Not Yet Started
Fire Protection And Fire Safety Requirements
Not Yet Started
Energy management
Not Yet Started
Electrical Meter Room, Sub-Station, Receiving Station
Not Yet Started
Community Buildings
Na
Aggregate area of recreational Open Space
Na
Buildings / Wings in Bhavani Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Bhavani Heights by Kalyani Enterpriseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

48223 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

107 apartments in total
Total
107
Booked
83
Available
24

Saleable Area Statistics (Sq. ft.)

43807 Total
Total
43807
Booked
32010
Available
11797
Total 107 apartments in project. 83 apartments booked. 77% apartments booked.
Total 43807 Sq.ft. saleable area. 32010 saleable area booked.
73% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 2022131010250
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.08 Sq.mts. ( 313 Sq.ft. )24
24 Booked100% Booked
100% Booked
1 BHK34.59 Sq.mts. ( 372 Sq.ft. )11
11 Booked100% Booked
100% Booked
1 BHK34.63 Sq.mts. ( 373 Sq.ft. )12
12 Booked100% Booked
100% Booked
1 BHK35.05 Sq.mts. ( 377 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK43.77 Sq.mts. ( 471 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK44.5 Sq.mts. ( 479 Sq.ft. )12
12 Booked100% Booked
100% Booked
83 total apartments / 83 apartments booked. 100% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingJan 1900131010201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.54 Sq.mts. ( 404 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK39.22 Sq.mts. ( 422 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK41.6 Sq.mts. ( 448 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK50.8 Sq.mts. ( 547 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK51.32 Sq.mts. ( 552 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK53.52 Sq.mts. ( 576 Sq.ft. )4
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Kalyani Enterprises
for Project
Bhavani Heights
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation