Project overview

Bhairaav Signature is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700003768. Bhairaav Signature is located at Plot No 7 And 8 Sector 30 /31. This is a Ongoing being developed by Sharpmind Infrastructure Private Limited.

Bhairaav Signature has 2 BHK & 3 BHK Apartments with carpet areas ranging from 577 to 693 Sq.ft. Carpet. The Project has total 56 of which 25 are currently available for sale.

Bhairaav Signature is being developed on a total land area of 24757 Sq.ft. Bhairaav Signature has 1 Wings / Towers Bhairaav Signature

ProjectDeveloperLocationPossession
Bhumiraj HillsBhumiraj Builders Pvt.Ltd.3,4,4A31-05-2023 00:00:00
Bhumiraj HillsBhumiraj Builders Pvt. Ltd.3,4,4A31-05-2023 00:00:00
Bhumiraj HillsBhumiraj Builders Pvt. Ltd.3,4,4A31-05-2023 00:00:00
Project Details
  • Project:
    Bhairaav Signature
  • Location:
  • Plot No 7 And 8 Sector 30 /31
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2018
Developer Details

  • Developer:
    Sharpmind Infrastructure Private Limited
  • Phone:
  • Address:
  • Bhairaav House, Muthaliya Residency
Project RERA Details
MAHA REARA No: P51700003768
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Lena Gosavi
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2018
Revised Possession 30 Jun 2018
Extended Possession 30 Jun 2019
Litigations No Litigations
Last Modified 16 Jul 2018
Last Retrived 26 Jul 2025
Bhairaav Signature QR Code
Bhairaav Signature
MahaRERA - P51700003768
Apartment Details & Configuration
TypeArea
2 BHK53.59 Sq.mts. ( 577 Sq.ft. )
3 BHK64.4 Sq.mts. ( 693 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Bhairaav Signaturelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management100% completed
95% Complete
Completed
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking100% completed
95% Complete
Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply90% completed
90% Complete
Permanent Connection Awaited
Buildings / Wings in Bhairaav Signature
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Bhairaav Signature by Sharpmind Infrastructure Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

24757 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

56 apartments in total
Total
56
Booked
31
Available
25

Saleable Area Statistics (Sq. ft.)

35561 Total
Total
35561
Booked
20093
Available
15468
Total 56 apartments in project. 31 apartments booked. 55% apartments booked.
Total 35561 Sq.ft. saleable area. 20093 saleable area booked.
57% area booked.

Bhairaav Signature

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bhairaav SignatureJun 2018151112151
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.59 Sq.mts. ( 577 Sq.ft. )28
12 Booked42% Booked
42% Booked
3 BHK64.4 Sq.mts. ( 693 Sq.ft. )28
19 Booked67% Booked
67% Booked
56 total apartments / 31 apartments booked. 55% apartments booked.
Work Description in Building Bhairaav SignatureCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress98% done
98% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Sharpmind Infrastructure Private Limited
for Project
Bhairaav Signature
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation