Project overview
Bhagwati Greens 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000006596. Bhagwati Greens 2 is located at Plot No.5. This is a Ongoing being developed by Bhagwati Developers.
Bhagwati Greens 2 has TYPE 1 & TYPE 2 Apartments with carpet areas ranging from 683 to 763 Sq.ft. Carpet. The Project has total 200 of which 0 are currently available for sale.
Bhagwati Greens 2 is being developed on a total land area of 89900 Sq.ft. Bhagwati Greens 2 has 4 Wings / Towers Shopping,Wing A,Wing B,Wing C
| Project | Developer | Location | Possession |
-
Project:
Bhagwati Greens 2
-
Location:
-
Plot No.5
-
Const. Stage:
Ongoing
-
Possession:
30 Jun 2023
-
Developer:
Bhagwati Developers
-
Phone:
-
Address:
-
Real Tech Park
| MAHA REARA No: |
P52000006596 |
| Project Type |
Others |
| RERA Project Status |
Ongoing |
| Architect |
Dimensions Architects Pvt Ltd |
| Funding Bank |
YES BANK |
| Proposed Possession |
30 Jun 2023 |
| Revised Possession |
30 Jun 2023 |
| Extended Possession |
31 Mar 2024 |
| Litigations |
No Litigations |
| Last Modified |
11 Jul 2024 |
| Last Retrived |
28 Jul 2025 |
Bhagwati Greens 2 QR Code
Bhagwati Greens 2
MahaRERA - P52000006596
| Type | Area |
| TYPE 1 | 73.03 Sq.mts. ( 786 Sq.ft. ) |
| TYPE 2 | 78.05 Sq.mts. ( 840 Sq.ft. ) |
| TYPE 3 | 72.55 Sq.mts. ( 781 Sq.ft. ) |
| TYPE 1 | 44.4 Sq.mts. ( 478 Sq.ft. ) |
| TYPE 2 | 44.95 Sq.mts. ( 484 Sq.ft. ) |
| TYPE 3 | 57.77 Sq.mts. ( 622 Sq.ft. ) |
| TYPE 4 | 51.92 Sq.mts. ( 559 Sq.ft. ) |
| TYPE 5 | 50.79 Sq.mts. ( 547 Sq.ft. ) |
| TYPE 6 | 64.13 Sq.mts. ( 690 Sq.ft. ) |
| TYPE 3 | 51.36 Sq.mts. ( 553 Sq.ft. ) |
| TYPE 5 | 51.45 Sq.mts. ( 554 Sq.ft. ) |
| TYPE 6 | 67.71 Sq.mts. ( 729 Sq.ft. ) |
| TYPE 7 | 70.8 Sq.mts. ( 762 Sq.ft. ) |
| TYPE 1 | 63.45 Sq.mts. ( 683 Sq.ft. ) |
| TYPE 2 | 70.92 Sq.mts. ( 763 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Bhagwati Greens 2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
In Later Scope Of Work |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station100% completed
|
|
In Later Scope Of Work |
|
|
|
In Later Scope Of Work |
Fire Protection And Fire Safety
Requirements100% completed
|
|
In Later Scope Of Work |
Landscaping & Tree Planting100% completed
|
|
Na |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
|
|
In Later Scope Of Work |
Solid Waste Management And Disposal100% completed
|
|
Provision For Owc |
Storm Water Drains100% completed
|
|
In Later Scope Of Work |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Provision For Stp |
Water Conservation, Rain water Harvesting100% completed
|
|
In Later Scope Of Work |
|
|
|
Temporary From Cidco |
Buildings / Wings in Bhagwati Greens 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Bhagwati Greens 2 by Bhagwati Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
200
apartments in total
Saleable Area Statistics (Sq. ft.)
125140
Total
Total 200 apartments in project. 200 apartments booked. 100% apartments booked.
Total 125140 Sq.ft. saleable area. 125140 saleable area booked.
100% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Shopping | Jun 2022 | 2 | 1 | 0 | 1 | 0 | 0 | 14 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| TYPE 1 | 73.03 Sq.mts. ( 786 Sq.ft. ) | 1 | |
| TYPE 2 | 78.05 Sq.mts. ( 840 Sq.ft. ) | 12 | |
| TYPE 3 | 72.55 Sq.mts. ( 781 Sq.ft. ) | 1 | |
14 total apartments / 14 apartments booked. 100% apartments booked. |
| Work Description in Building Shopping | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing A | Jun 2022 | 26 | 1 | 0 | 1 | 3 | 0 | 66 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| TYPE 1 | 44.4 Sq.mts. ( 478 Sq.ft. ) | 11 | |
| TYPE 2 | 44.95 Sq.mts. ( 484 Sq.ft. ) | 11 | |
| TYPE 3 | 57.77 Sq.mts. ( 622 Sq.ft. ) | 11 | |
| TYPE 4 | 51.92 Sq.mts. ( 559 Sq.ft. ) | 11 | |
| TYPE 5 | 50.79 Sq.mts. ( 547 Sq.ft. ) | 11 | |
| TYPE 6 | 64.13 Sq.mts. ( 690 Sq.ft. ) | 11 | |
66 total apartments / 66 apartments booked. 100% apartments booked. |
| Work Description in Building Wing A | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing B | Jun 2022 | 26 | 1 | 0 | 1 | 3 | 0 | 70 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| TYPE 1 | 44.4 Sq.mts. ( 478 Sq.ft. ) | 22 | |
| TYPE 2 | 57.77 Sq.mts. ( 622 Sq.ft. ) | 11 | |
| TYPE 3 | 51.36 Sq.mts. ( 553 Sq.ft. ) | 22 | |
| TYPE 4 | 64.13 Sq.mts. ( 690 Sq.ft. ) | 11 | |
| TYPE 5 | 51.45 Sq.mts. ( 554 Sq.ft. ) | 1 | |
| TYPE 6 | 67.71 Sq.mts. ( 729 Sq.ft. ) | 1 | |
| TYPE 7 | 70.8 Sq.mts. ( 762 Sq.ft. ) | 2 | |
70 total apartments / 70 apartments booked. 100% apartments booked. |
| Work Description in Building Wing B | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing C | Jun 2022 | 26 | 1 | 0 | 1 | 3 | 0 | 50 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| TYPE 1 | 63.45 Sq.mts. ( 683 Sq.ft. ) | 22 | |
| TYPE 2 | 70.92 Sq.mts. ( 763 Sq.ft. ) | 28 | |
50 total apartments / 50 apartments booked. 100% apartments booked. |
| Work Description in Building Wing C | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
Channel Partners Registered by Developer
Bhagwati Developers
for Project
Bhagwati Greens 2
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |