Project overview

Bhagwati Eleganza is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700003864. Bhagwati Eleganza is located at Plot No 12. This is a Ongoing being developed by Bhagwati Developers.

Bhagwati Eleganza has TYPE 1 Apartments with carpet areas ranging from 377 to 377 Sq.ft. Carpet. The Project has total 284 of which 14 are currently available for sale.

Bhagwati Eleganza is being developed on a total land area of 104369 Sq.ft. out of which 61130 Sq.ft. i.e 59% is reserved for recreational purposes. Bhagwati Eleganza has 5 Wings / Towers Shopping,Wing A,Wing B,Wing C,Wing D

ProjectDeveloperLocationPossession
Ng Grand Plaza Phase IOm Namah Shivay Developers Private LimitedPlot Number 915-12-2019 00:00:00
Juhi SerenityVijaykumar Baldev BajajPlot No. 2425-12-2023 00:00:00
Cloud 36 -Phase IGeecee Ventures LimitedPlot No. 6 Sector 11. Ghansoli Node31-12-2018 00:00:00
Goldcrest Residency - Phase 2Savita Homemakers LlpPlot No 730-06-2021 00:00:00
Goldcrest Residency - Phase 1Savita Homemakers LlpPlot No 731-12-2019 00:00:00
Project Details
  • Project:
    Bhagwati Eleganza
  • Location:
  • Plot No 12
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Bhagwati Developers
  • Phone:
  • Address:
  • Real Tech Park
Project RERA Details
MAHA REARA No: P51700003864
Project Type Others
RERA Project Status Ongoing
Architect Soyuz Talib Architects Pvt Ltd
Funding Bank BANK OF INDIA
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession
Litigations No Litigations
Last Modified 06 Aug 2017
Last Retrived 26 Jul 2025
Bhagwati Eleganza QR Code
Bhagwati Eleganza
MahaRERA - P51700003864
Apartment Details & Configuration
TypeArea
SHOP TYPE 155.42 Sq.mts. ( 597 Sq.ft. )
SHOP TYPE 260.73 Sq.mts. ( 654 Sq.ft. )
SHOP TYPE 366.81 Sq.mts. ( 719 Sq.ft. )
TYPE 144.49 Sq.mts. ( 479 Sq.ft. )
TYPE 257.17 Sq.mts. ( 615 Sq.ft. )
TYPE 143.01 Sq.mts. ( 463 Sq.ft. )
TYPE 134.99 Sq.mts. ( 377 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Bhagwati Eleganzalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
In Later Scope Of Work
Community Buildings100% completed
95% Complete
Clubhouse At 2Nd Floor Podium Level Proposed
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Approved Plan
Energy management100% completed
95% Complete
Solar Water Heater Provision
Fire Protection And Fire Safety Requirements100% completed
95% Complete
In Later Scope Of Work
Landscaping & Tree Planting100% completed
95% Complete
In Later Scope Of Work
Open Parking100% completed
95% Complete
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Approved Plans
Solid Waste Management And Disposal100% completed
95% Complete
Provision For Owc
Storm Water Drains100% completed
95% Complete
In Later Scope Of Work
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Rcc Work Done
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rain Water Harvesting Tank Provided
Water Supply100% completed
95% Complete
Temporary Municipal Water Connection In Place
Buildings / Wings in Bhagwati Eleganza
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Bhagwati Eleganza by Bhagwati Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

104369 Sq. ft.

Project Area

61130 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

284 apartments in total
Total
284
Booked
270
Available
14

Saleable Area Statistics (Sq. ft.)

142808 Total
Total
142808
Booked
136327
Available
6481
Total 284 apartments in project. 270 apartments booked. 95% apartments booked.
Total 142808 Sq.ft. saleable area. 136327 saleable area booked.
95% area booked.

Shopping

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ShoppingDec 201821010031
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SHOP TYPE 155.42 Sq.mts. ( 597 Sq.ft. )16
16 Booked100% Booked
100% Booked
SHOP TYPE 260.73 Sq.mts. ( 654 Sq.ft. )5
5 Booked100% Booked
100% Booked
SHOP TYPE 366.81 Sq.mts. ( 719 Sq.ft. )3
3 Booked100% Booked
100% Booked
24 total apartments / 24 apartments booked. 100% apartments booked.
Work Description in Building ShoppingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 20183710130105
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 144.49 Sq.mts. ( 479 Sq.ft. )35
35 Booked100% Booked
100% Booked
TYPE 257.17 Sq.mts. ( 615 Sq.ft. )35
35 Booked100% Booked
100% Booked
70 total apartments / 70 apartments booked. 100% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BMar 20183710130105
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 143.01 Sq.mts. ( 463 Sq.ft. )70
56 Booked80% Booked
80% Booked
70 total apartments / 56 apartments booked. 80% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CMar 20183710130105
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 144.49 Sq.mts. ( 479 Sq.ft. )35
35 Booked100% Booked
100% Booked
TYPE 257.17 Sq.mts. ( 615 Sq.ft. )35
35 Booked100% Booked
100% Booked
70 total apartments / 70 apartments booked. 100% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DMar 2018271013054
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPE 134.99 Sq.mts. ( 377 Sq.ft. )50
50 Booked100% Booked
100% Booked
50 total apartments / 50 apartments booked. 100% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Bhagwati Developers
for Project
Bhagwati Eleganza
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation