Project overview

Beaumonde is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700049442. Beaumonde is located at Survey No 311 (Old), 43 (New), Hissa No.4. This is a New being developed by Kanungo Property.

Beaumonde has 1 BHK & 2 BHK Apartments with carpet areas ranging from 486 to 731 Sq.ft. Carpet. The Project has total 114 of which 77 are currently available for sale.

Beaumonde is being developed on a total land area of 27233 Sq.ft. Beaumonde has 1 Wings / Towers Beaumonde

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Beaumonde
  • Location:
  • Survey No 311 (Old), 43 (New), Hissa No.4
  • Const. Stage:
    New
  • Possession:
    31 Mar 2026
Developer Details

  • Developer:
    Kanungo Property
  • Phone:
  • Address:
  • Panchsheel Plaza
Project RERA Details
MAHA REARA No: P51700049442
Project Type Residential / Group Housing
RERA Project Status New
Architect D N Patel & Associates
Funding Bank IDBI BANK
Proposed Possession 31 Mar 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 14 Feb 2023
Last Retrived 26 Jul 2025
Beaumonde QR Code
Beaumonde
MahaRERA - P51700049442
Apartment Details & Configuration
TypeArea
1 BHK45.17 Sq.mts. ( 486 Sq.ft. )
2 BHK63.5 Sq.mts. ( 684 Sq.ft. )
2 BHK67.44 Sq.mts. ( 726 Sq.ft. )
2 BHK67.89 Sq.mts. ( 731 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Beaumondelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
-
Energy management
-
Fire Protection And Fire Safety Requirements22% completed
22% Complete
Ground Floor
Landscaping & Tree Planting9% completed
9% Complete
-
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)10% completed
10% Complete
Chamber Ground Floor
Solid Waste Management And Disposal
-
Storm Water Drains50% completed
50% Complete
-
Street Lighting22% completed
22% Complete
Compound Wall
Treatment And Disposal Of Sewage And Sullage Water
-
Water Conservation, Rain water Harvesting90% completed
90% Complete
-
Water Supply
-
Buildings / Wings in Beaumonde
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Beaumonde by Kanungo Propertylast updated on 26 Jul 2025 as per information obtained from MARA RERA.

27233 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

114 apartments in total
Total
114
Booked
37
Available
77

Saleable Area Statistics (Sq. ft.)

73618 Total
Total
73618
Booked
23748
Available
49871
Total 114 apartments in project. 37 apartments booked. 32% apartments booked.
Total 73618 Sq.ft. saleable area. 23748 saleable area booked.
32% area booked.

Beaumonde

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
BeaumondeMar 20261910010144
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK45.17 Sq.mts. ( 486 Sq.ft. )38
13 Booked34% Booked
34% Booked
2 BHK63.5 Sq.mts. ( 684 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK67.44 Sq.mts. ( 726 Sq.ft. )72
23 Booked31% Booked
31% Booked
2 BHK67.89 Sq.mts. ( 731 Sq.ft. )3
1 Booked33% Booked
33% Booked
114 total apartments / 37 apartments booked. 32% apartments booked.
Work Description in Building BeaumondeCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress32% done
32% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress60% done
60% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress32% done
32% Booked
Slabs of Super Structure
work-in-progress91% done
91% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress59% done
59% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress91% done
91% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress60% done
60% Booked
X number of Slabs of Super Structure
work-in-progress59% done
59% Booked
Channel Partners
Channel Partners Registered by Developer
Kanungo Property
for Project
Beaumonde
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation