Project overview

Beachcroft is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900012029. Beachcroft is located at 2-377. This is a Ongoing being developed by Shree Yashraj Developers.

Beachcroft has Comm Toilet, Dormetory, Library, Mandir Murti, Medical Room, MP Room & Pantry Apartments with carpet areas ranging from 137 to 584 Sq.ft. Carpet. The Project has total 36 of which 10 are currently available for sale.

Beachcroft is being developed on a total land area of 19800 Sq.ft. out of which 2273 Sq.ft. i.e 11% is reserved for recreational purposes. Beachcroft has 2 Wings / Towers Beachcroft,Mandir

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Beachcroft
  • Location:
  • 2-377
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2023
Developer Details

  • Developer:
    Shree Yashraj Developers
  • Phone:
  • Address:
  • Buona Casa
Project RERA Details
MAHA REARA No: P51900012029
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Sandeep Shikre
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2023
Revised Possession 30 Jun 2023
Extended Possession
Litigations No Litigations
Last Modified 01 Sep 2017
Last Retrived 26 Jul 2025
Beachcroft QR Code
Beachcroft
MahaRERA - P51900012029
Apartment Details & Configuration
TypeArea
1 BHK38.81 Sq.mts. ( 418 Sq.ft. )
1 BHK46.47 Sq.mts. ( 500 Sq.ft. )
2 BHK69.93 Sq.mts. ( 753 Sq.ft. )
3 BHK116.42 Sq.mts. ( 1253 Sq.ft. )
3 BHK298.41 Sq.mts. ( 3212 Sq.ft. )
3 BHK151.94 Sq.mts. ( 1635 Sq.ft. )
3 BHK152.4 Sq.mts. ( 1640 Sq.ft. )
4 BHK140.71 Sq.mts. ( 1515 Sq.ft. )
4 BHK149.74 Sq.mts. ( 1612 Sq.ft. )
4 BHK212.44 Sq.mts. ( 2287 Sq.ft. )
4 BHK212.5 Sq.mts. ( 2287 Sq.ft. )
4 BHK212.93 Sq.mts. ( 2292 Sq.ft. )
4 BHK213.32 Sq.mts. ( 2296 Sq.ft. )
4 BHK213.4 Sq.mts. ( 2297 Sq.ft. )
5 BHK195.6 Sq.mts. ( 2105 Sq.ft. )
6 BHK330.56 Sq.mts. ( 3558 Sq.ft. )
6 BHK377.85 Sq.mts. ( 4067 Sq.ft. )
6 BHK381.34 Sq.mts. ( 4105 Sq.ft. )
Comm Toilet48.89 Sq.mts. ( 526 Sq.ft. )
Dormetory54.27 Sq.mts. ( 584 Sq.ft. )
Library143 Sq.mts. ( 1539 Sq.ft. )
Mandir Murti30.87 Sq.mts. ( 332 Sq.ft. )
Medical Room19 Sq.mts. ( 205 Sq.ft. )
MP Room26.18 Sq.mts. ( 282 Sq.ft. )
MP Room12.75 Sq.mts. ( 137 Sq.ft. )
MP Room144 Sq.mts. ( 1550 Sq.ft. )
Pantry15 Sq.mts. ( 161 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Beachcroftlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Paved Rg
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Proposed Substation
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
Paved Rg And Tree Planting
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp
Solid Waste Management And Disposal
Stp
Storm Water Drains
As Per Swd Remarks
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Stp
Water Conservation, Rain water Harvesting20% completed
20% Complete
Ring-Well
Water Supply
Plumbing Downtake And Terrace Looping.
Buildings / Wings in Beachcroft
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Beachcroft by Shree Yashraj Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

19800 Sq. ft.

Project Area

2273 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

36 apartments in total
Total
36
Booked
26
Available
10

Saleable Area Statistics (Sq. ft.)

63736 Total
Total
63736
Booked
39730
Available
24006
Total 36 apartments in project. 26 apartments booked. 72% apartments booked.
Total 63736 Sq.ft. saleable area. 39730 saleable area booked.
62% area booked.

Beachcroft

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
BeachcroftJan 1900361015065
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.81 Sq.mts. ( 418 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK46.47 Sq.mts. ( 500 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK69.93 Sq.mts. ( 753 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK116.42 Sq.mts. ( 1253 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK298.41 Sq.mts. ( 3212 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK151.94 Sq.mts. ( 1635 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK152.4 Sq.mts. ( 1640 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK140.71 Sq.mts. ( 1515 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK149.74 Sq.mts. ( 1612 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK212.44 Sq.mts. ( 2287 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK212.5 Sq.mts. ( 2287 Sq.ft. )10
2 Booked20% Booked
20% Booked
4 BHK212.93 Sq.mts. ( 2292 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK213.32 Sq.mts. ( 2296 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK213.4 Sq.mts. ( 2297 Sq.ft. )1
1 Booked100% Booked
100% Booked
5 BHK195.6 Sq.mts. ( 2105 Sq.ft. )1
1 Booked100% Booked
100% Booked
6 BHK330.56 Sq.mts. ( 3558 Sq.ft. )1
1 Booked100% Booked
100% Booked
6 BHK377.85 Sq.mts. ( 4067 Sq.ft. )1
None Booked0% Booked
0% Booked
6 BHK381.34 Sq.mts. ( 4105 Sq.ft. )1
1 Booked100% Booked
100% Booked
27 total apartments / 17 apartments booked. 62% apartments booked.
Work Description in Building BeachcroftCompletion
Basement (if any)
work-in-progress25% done
25% Booked
Excavation
work-in-progress50% done
50% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress25% done
25% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress25% done
25% Booked
X number of Podiums
X number of Slabs of Super Structure

Mandir

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
MandirJan 190041010016
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Comm Toilet48.89 Sq.mts. ( 526 Sq.ft. )1
1 Booked100% Booked
100% Booked
Dormetory54.27 Sq.mts. ( 584 Sq.ft. )1
1 Booked100% Booked
100% Booked
Library143 Sq.mts. ( 1539 Sq.ft. )1
1 Booked100% Booked
100% Booked
Mandir Murti30.87 Sq.mts. ( 332 Sq.ft. )1
1 Booked100% Booked
100% Booked
Medical Room19 Sq.mts. ( 205 Sq.ft. )1
1 Booked100% Booked
100% Booked
MP Room26.18 Sq.mts. ( 282 Sq.ft. )1
1 Booked100% Booked
100% Booked
MP Room12.75 Sq.mts. ( 137 Sq.ft. )1
1 Booked100% Booked
100% Booked
MP Room144 Sq.mts. ( 1550 Sq.ft. )1
1 Booked100% Booked
100% Booked
Pantry15 Sq.mts. ( 161 Sq.ft. )1
1 Booked100% Booked
100% Booked
9 total apartments / 9 apartments booked. 100% apartments booked.
Work Description in Building MandirCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
work-in-progress90% done
90% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress90% done
90% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shree Yashraj Developers
for Project
Beachcroft
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation