Project overview

Baug E Umar is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900007117. Baug E Umar is located at 41764. This is a Ongoing being developed by Mahanagar Constructions Private Limited.

Baug E Umar has 1 BHK Apartments with carpet areas ranging from 300 to 445 Sq.ft. Carpet. The Project has total 25 of which 14 are currently available for sale.

Baug E Umar is being developed on a total land area of 4587 Sq.ft. Baug E Umar has 1 Wings / Towers Baug E Umar

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Baug E Umar
  • Location:
  • 41764
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Mahanagar Constructions Private Limited
  • Phone:
  • Address:
  • A-19 Al Namirah
Project RERA Details
MAHA REARA No: P51900007117
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Abid Rizvi
Funding Bank UNION BANK OF INDIA
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession 10 Dec 2023
Litigations No Litigations
Last Modified 08 Jun 2023
Last Retrived 26 Jul 2025
Baug E Umar QR Code
Baug E Umar
MahaRERA - P51900007117
Apartment Details & Configuration
TypeArea
1 BHK27.87 Sq.mts. ( 300 Sq.ft. )
1 BHK29.73 Sq.mts. ( 320 Sq.ft. )
1 BHK36.79 Sq.mts. ( 396 Sq.ft. )
1 BHK41.34 Sq.mts. ( 445 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Baug E Umarlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Baug E Umar
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Baug E Umar by Mahanagar Constructions Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

4587 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

25 apartments in total
Total
25
Booked
11
Available
14

Saleable Area Statistics (Sq. ft.)

8306 Total
Total
8306
Booked
3500
Available
4806
Total 25 apartments in project. 11 apartments booked. 44% apartments booked.
Total 8306 Sq.ft. saleable area. 3500 saleable area booked.
42% area booked.

Baug E Umar

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Baug E UmarJun 202220100508
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.87 Sq.mts. ( 300 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK29.73 Sq.mts. ( 320 Sq.ft. )21
10 Booked47% Booked
47% Booked
1 BHK36.79 Sq.mts. ( 396 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK41.34 Sq.mts. ( 445 Sq.ft. )2
None Booked0% Booked
0% Booked
25 total apartments / 11 apartments booked. 44% apartments booked.
Work Description in Building Baug E UmarCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress81% done
81% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress65% done
65% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress81% done
81% Booked
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Mahanagar Constructions Private Limited
for Project
Baug E Umar
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation