Project overview

Bassein Tower is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000033137. Bassein Tower is located at Palghar. This is a New Project being developed by Bassein Infra Build.

Bassein Tower has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 145 to 568 Sq.ft. Carpet. The Project has total 39 of which 39 are currently available for sale.

Bassein Tower is being developed on a total land area of 10226 Sq.ft. Bassein Tower has 1 Wings / Towers Bassein Tower

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Bassein Tower
  • Location:
  • Palghar
  • Const. Stage:
    New Project
  • Possession:
    31 Dec 2024
Developer Details

  • Developer:
    Bassein Infra Build
  • Phone:
  • Address:
  • Rno 4,Sur No 746, Sayad House, Koliwada, Koliwada, Vasai, 401201
Project RERA Details
MAHA REARA No: P99000033137
Project Type Residential
RERA Project Status New Project
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK
Proposed Possession 31 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 20 Mar 2023
Last Retrived 28 Jul 2025
Bassein Tower QR Code
Bassein Tower
MahaRERA - P99000033137
Apartment Details & Configuration
TypeArea
1 BHK38.57 Sq.mts. ( 415 Sq.ft. )
2 BHK52.6 Sq.mts. ( 566 Sq.ft. )
2 BHK52.78 Sq.mts. ( 568 Sq.ft. )
Shop13.44 Sq.mts. ( 145 Sq.ft. )
Shop15.15 Sq.mts. ( 163 Sq.ft. )
Shop24.08 Sq.mts. ( 259 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Bassein Towerlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electric Room Shall Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
0
Open Parking
7 For Cars And 71 For Scooters Is Provided
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank Shall Be Provided Instead Of Stp
Solid Waste Management And Disposal
As Per Vvcmc Norms
Storm Water Drains
0
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Bassein Tower
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Bassein Tower by Bassein Infra Buildlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

10226 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

39 apartments in total
Total
39
Booked
0
Available
39

Saleable Area Statistics (Sq. ft.)

17339 Total
Total
17339
Booked
0
Available
17339
Total 39 apartments in project. 0 apartments booked. 0% apartments booked.
Total 17339 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Bassein Tower

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bassein TowerDec 2024161000780
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.57 Sq.mts. ( 415 Sq.ft. )24
None Booked0% Booked
0% Booked
2 BHK52.6 Sq.mts. ( 566 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK52.78 Sq.mts. ( 568 Sq.ft. )7
None Booked0% Booked
0% Booked
Shop13.44 Sq.mts. ( 145 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.15 Sq.mts. ( 163 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.08 Sq.mts. ( 259 Sq.ft. )1
None Booked0% Booked
0% Booked
39 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bassein TowerCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Bassein Infra Build
for Project
Bassein Tower
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation