Project overview

Baldevsingh Thakur Sra Coop Hsg Soc Ltd is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800008254. Baldevsingh Thakur Sra Coop Hsg Soc Ltd is located at 489 489 1 To 35. This is a New being developed by Krishna Narsingrao Pimple.

Baldevsingh Thakur Sra Coop Hsg Soc Ltd has 1 BHK Apartments with carpet areas ranging from 317 to 415 Sq.ft. Carpet. The Project has total 102 of which 67 are currently available for sale.

Baldevsingh Thakur Sra Coop Hsg Soc Ltd is being developed on a total land area of 15134 Sq.ft. Baldevsingh Thakur Sra Coop Hsg Soc Ltd has 2 Wings / Towers Atlantic Laxmi Residency,Baldevsingh Thakur Sra Coop Hsg Soc Ltd

ProjectDeveloperLocationPossession
Centrona Zen-AElevated Avenue Realty Llp194 Part30-12-2026 00:00:00
Ghatkopar Mahavir PalacePramod Mathurbhai DhabariaFp No 250 Tps 331-12-2017 00:00:00
Trafalgar TowerM/S. Akshay Radha Kishan ConstructionIn T.P Scheme No.Iii In Cts No 5984, Plot Of Land Bearing No.5831-12-2019 00:00:00
Jyoti PalaceWestbury Construction Private LimitedCts No. 5019 To 5034 F.P. No.16 Of Tps 131-12-2018 00:00:00
Parvati HeritageAmi & M.D. DevelopersNew Cts No 703A 703B01-03-2020 00:00:00
Dhiren Co Operative Housing SocietyUtkarsh ConstructionPlot No 30 Cts No 194 A 13 Survey No 236A31-12-2017 00:00:00
Kalika Heights Phase IiSanjay Shreenath PandeyF.P.No 36631-12-2019 00:00:00
Subham BileshwarSubham Developers592331-12-2018 00:00:00
Ghatkopar Park View Chs LimitedEv And Saraf Realty473431-12-2019 00:00:00
Sheth ExoticaM/S Sheth Properties Pvt Ltd4762B, 4758, 4759, 475731-10-2018 00:00:00
Heritage Ahura ResidencyKersi Jamshed Randeria177730-12-2022 00:00:00
Vrushali VillaAditya AssociatesMumbai Suburban, 40008930-06-2008 00:00:00
Anchor ResidencyAnchor Sky Scrapers Llp3386 To 341431-12-2019 00:00:00
Rajshree OrchidLaxmiechand Devji DedhiaBuilding Number 42, Cts Number 5661 Part31-12-2019 00:00:00
9 CrystalKeyland Developers353/330-12-2025 00:00:00
Redevelopment Of Chandini ChsPunjalal G Dave Realtors LlpCts No - 5743/22, Plot No 353/2230-06-2021 00:00:00
Smita Nagar Chs LtdExcel EnterprisesR.B Mehta Marg18-11-2022 00:00:00
Sai DarshanSai Darshan587830-12-2021 00:00:00
Dharmapratap Chs LtdSai Life RealtorsCts No 195/92 Final Plot No 8030-03-2019 00:00:00
Siddh DarshanDeep Associates5105 - 5120 / 30-3131-12-2018 00:00:00
Radhakrishnan Redevelopment ProjectVibrant Properties400077, Mumbai Suburban31-12-2018 00:00:00
Shree Sati Ashish Co Op Housing SocietySun-VubPlot No 39 Cts No 195/3431-07-2018 00:00:00
Kailas NagarDkp Designers & Creators Pvt. Ltd.Cts No 595530-03-2023 00:00:00
Shanti NiwasD.G. Patel & Co.12 / 596731-12-2018 00:00:00
Sai PrajaktaSunil Mangilal JainOld Sno 372 New Sno 79 Hno 231-12-2027 00:00:00
SamarpanHs ConstructionC.T.S.No.184 (Pt.)30-06-2025 00:00:00
Alag AnantaAlag Square Llp19730-09-2024 00:00:00
The Baya JunctionM/S. Unique Property Enterprises Pvt. Ltd.Pestom Sagar Rd No 630-12-2023 00:00:00
Skye GrandeurV K Developers4756 B28-02-2022 00:00:00
KakkadSilver Land Developers Private Limited464731-12-2026 00:00:00
Palazzo 90Blue Crest Developers Llp195/6530-06-2025 00:00:00
Shubham Avalon Co-Operative Housing Society LimitedAvvad Housing LlpFinal Plot No. - 311 (Pt), Plot Bearing Survey No. - 236-A, Cts No. - 5662 (Pt)31-12-2024 00:00:00
Bhaveshwar Nagar Building No. 3Yog RealityCts No. 5953, Final Plot No. 2531-03-2019 00:00:00
Centrona Zest- AElevated Avenue Realty Llp194 Part30-12-2026 00:00:00
The PalmsTanishq Builders1269A30-06-2021 00:00:00
Sapphire Business AnnexeSapphire Developers42 And 42 A30-11-2020 00:00:00
Baldevsingh Thakur Sra Coop Hsg Soc LtdKrishna Narsingrao Pimple489 489 1 To 3515-08-2023 00:00:00
Jai Savitri Chs LtdA&Amp;A Aristocrat Realty Private Limited400077, Mumbai Suburban31-03-2019 00:00:00
Nav VaniGiriraj Builders And DevelopersPlot No 35328 Tps 3 Cts No 57432030-12-2020 00:00:00
Dream Arihant OasisDream Arihant Infrastructure CompanyF P No 83, Cts No 591330-12-2023 00:00:00
Sai Orchid And Sai Fortune Business CentreM/S Sai Shakti Realtors594830-06-2028 00:00:00
Rajshree StatusJetalaal Laxmiechand DedhiaBuilding Number 15 Cts No. 5681 Part30-12-2020 00:00:00
Odhav K K ResidencyK. K. Patel & Sons182 182 1 To 8030-09-2024 00:00:00
Viki HeightsDivij Developers 586730-11-2018 00:00:00
Maithili Residency Phase-1Global Oricon Developers1004 Part31-12-2019 00:00:00
Skyline StatusSkyline Enterprises5551 To 556031-12-2018 00:00:00
Shaswat ResidencyShaswat Realty470215-04-2018 00:00:00
One CrystalGoldnest Spaces LlpFp 149 150 151 Of Tps Iii31-12-2025 00:00:00
One ApolloGoldnest Spaces LlpFp No 149 150 151 Of Tps Iii31-12-2025 00:00:00
Sudarshan Chs LtdSudarshan Co-Operative Housing Society Limited195/18330-06-2026 00:00:00
Om ShyamDhirajlal Narsidas KamdarCts. No. 195/147, Plot No. 17214-04-2021 00:00:00
Skyline Viha Wing BAnkit Overseas460 A Pt 460 3 To 731-12-2018 00:00:00
Value Platinum Redevelopment Project For Rajawadi Arunoday ChslValue Projects Private Limited400077, Mumbai Suburban20-01-2018 00:00:00
AnandAastha EnterprisesM. G. Road31-12-2018 00:00:00
Redevelopment Of The State Bank Of India Siddheshwar Co Op Housing Soc LtdOrra Realtors Private Limited5939 Plot No 10231-12-2017 00:00:00
SaptashringiSiroya Developers Pvt LtdCts No 623A/631-12-2019 00:00:00
Poonam CelestePl7 Realty Pvt. Ltd.583530-11-2024 00:00:00
Rajshree AashiyanaGanesh Chhaya Construction Llp8030-06-2025 00:00:00
Shree Balaji AvenueShree Balaji & Co469/1 Village Of Kirol Vidyavihar East Mumbai 40007730-06-2025 00:00:00
Devi ClassicD M RealityF.P. No. 110 Of T.P.S. Iii Of Ghatkopar, Cts No. 590330-06-2018 00:00:00
Sai GrandeurShree Sai RealtorsCts No 5952 Fp No 3030-03-2021 00:00:00
Bindu / VidyaviharDhirajlal Narsidas KamdarFinal Plot No. 169 Tps Iii Ghatkopar Cts No 5831 Village Ghatkopar Kirol31-12-2018 00:00:00
Integrated AhanaIntegrated Spaces Limited814 To 816 817/A And 817/B31-12-2018 00:00:00
Centrona Zest- BElevated Avenue Realty Llp194 Part30-12-2026 00:00:00
Aaradhya OneparkMicl Creators Llp353/5, 353/7, 353/8, 353/9, 353/46, 353/17, 353/11, 353/1231-07-2028 00:00:00
Milan Milap Co Op Housing Society LtdMilan Milap Co Op Housing Society Limited195/131, 195/13731-12-2026 00:00:00
PalatinaTanishq BuildersC.T.S. No.194A(Pt.)28-02-2026 00:00:00
HemkunjMahendra Ravjibhai Makwana132+133A30-06-2025 00:00:00
The Ghatkopar Nilkantha Chs LtdSchemaaticsFinal Plot No. 25A31-01-2021 00:00:00
Ishaan EnclaveIshaan Developers40008031-05-2020 00:00:00
Avis ResidencyAvi Housing Realtors22231-12-2019 00:00:00
New Sangeeta Chs/ Valdariya ConstructionsPinkesh Jain400077, Mumbai Suburban31-07-2019 00:00:00
Basil ResidencyPoseidon Realtors619A3, 623A1001-12-2026 00:00:00
Shri Krishin Co-Operative Housing Society LimitedMishal Construction Private LimitedPlot No.72 Cts No.195/6430-06-2019 00:00:00
AashrinaM/S. Vira Realspace LlpCts No. 4731, Plot No. 28, S.S. No. Xviii30-09-2022 00:00:00
Terraform Dwarka - Wing CMoney Magnum Nest Pvt Ltd5808Pt Corr Final Plot No274a Pt Of Tps Iii Of Ghatkopar Kirol Adj 18.3 Mtr Wide Jawahar Rd At North30-12-2024 00:00:00
Auroville Wing C And DArya ConstructionSurvey No 46 Hissa No 8/1, Survey No 234 Hissa No A/9/1, Survey No 233 Hissa No 3/2 And 431-12-2026 00:00:00
Aaradhya ResidencyMan Aaradhya Infraconstruction Llp885A/130-04-2018 00:00:00
Mahavir SolitaireInfinity Construction Co.Final Plot No 353-5B31-05-2018 00:00:00
Mahavir AriaMilestone DevelopersFinal Plot No 353-2531-12-2017 00:00:00
Mahavir AquilaMilestone DevelopersFinal Plot No 163B-131-05-2019 00:00:00
VasundharaInfinity Construction Co.Final Plot No 1431-12-2018 00:00:00
Jeerawali ResidencyGopuram DevelopersCts No 5229 To 524331-07-2018 00:00:00
Shree Pinal Project APinal Realty LlpCts No - 4614A, 4615 To 462421-11-2024 00:00:00
Kevli Plaza – A Wing And Kevli Darshan – B WingM/S R K And Company Pvt Ltd5105 To 5111, F.P No 30 Tps-I Ghatkopar (E) In N Ward, 5120 (Pt) Of Village Ghatkopar Kirol31-12-2028 00:00:00
AurusM/S. B Chopda Realtors195/17831-03-2027 00:00:00
Rdk VivantaRdk ConstructionsCts No 195/191 Plot No 19331-05-2029 00:00:00
Om NeeldharaD. D. Dezines Group228, 229 And 24430-06-2028 00:00:00
Nav Ashish Premises Co-Operative Society LtdS K Developers218 Ghatkopar - Kirol26-04-2029 00:00:00
Nav IndralokNav Indralok Co-Operative Housing. Society Limited195/17731-12-2026 00:00:00
Dhoot Sapphire ResidencyDhoot Developers Pvt. Ltd.587231-12-2028 00:00:00
Sidhivinayak OrchidSidhivinayak Developers186 Part31-12-2026 00:00:00
Jai Arihant Nakoda Infrastructure194A31-12-2026 00:00:00
Garodia Nagar Mahavir Dham Chs LtdGarodia Nagar Mahavir Dham Chs Ltd195/4731-12-2025 00:00:00
Kush AvenueeNutan Sandesh Chsl195/2130-04-2026 00:00:00
Kyraa ParkKyraa Infra Projects Private Limited192/3/C And 192/430-12-2023 00:00:00
Skyline MagnusSkyline VenturesCts No 5121 To 5129 And 5151/A31-12-2024 00:00:00
Solstice Phase- INeelam Finance (Bombay ) Pvt Ltd195 Part30-12-2022 00:00:00
Sky CasaV K Developers195/15231-12-2028 00:00:00
Manju Apartment ChsAyaansh Buildcon Llp23101-04-2027 00:00:00
Nidhaan Corporate ParkNidhaan Properties Llp479730-12-2027 00:00:00
Damji Shamji ZenithChandrakant And Co3358 ,3359 ,3360 ,3377 ,3361 ,3362 ,3363 ,3364 ,3365 ,3378 ,3369 ,3370 ,3371 ,3372 ,3373 ,3374 ,3375 ,337631-12-2027 00:00:00
Senghani ParadiseMansukhlal Velji Senghani1830-06-2026 00:00:00
Maithili Residency Phase-2Global Oricon Developers1004 Part31-12-2019 00:00:00
Integrated ArcadeSadgurukrupa Developers181 And 18231-03-2019 00:00:00
Centrona Nova BElevated Avenue Realty Llp194 Part30-12-2026 00:00:00
Suvidha Chs LtdAmi & Monika Developers501 V31-03-2018 00:00:00
Rajshree CloverRajshree CreationsBuilding Number 110 Cts No 1A Part31-12-2019 00:00:00
Shubham SarayuShubham RealtyCts No 195/16130-06-2019 00:00:00
Shanti SolitaireMarvel Developers400077, Mumbai City31-07-2017 00:00:00
Project Details
  • Project:
    Baldevsingh Thakur Sra Coop Hsg Soc Ltd
  • Location:
  • 489 489 1 To 35
  • Const. Stage:
    New
  • Possession:
    15 Aug 2023
Developer Details

  • Developer:
    Krishna Narsingrao Pimple
  • Phone:
  • Address:
  • Varun Apartments
Project RERA Details
MAHA REARA No: P51800008254
Project Type Residential / Group Housing
RERA Project Status New
Architect D Facto Designers
Funding Bank STATE BANK OF INDIA
Proposed Possession 15 Aug 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Oct 2024
Last Retrived 26 Jul 2025
Baldevsingh Thakur Sra Coop Hsg Soc Ltd QR Code
Baldevsingh Thakur Sra Coop Hsg Soc Ltd
MahaRERA - P51800008254
Apartment Details & Configuration
TypeArea
1 BHK40.97 Sq.mts. ( 441 Sq.ft. )
1 BHK41.02 Sq.mts. ( 442 Sq.ft. )
1 BHK41.53 Sq.mts. ( 447 Sq.ft. )
1 BHK41.56 Sq.mts. ( 447 Sq.ft. )
2 BHK59.81 Sq.mts. ( 644 Sq.ft. )
2 BHK59.82 Sq.mts. ( 644 Sq.ft. )
2 BHK60.11 Sq.mts. ( 647 Sq.ft. )
2 BHK62.15 Sq.mts. ( 669 Sq.ft. )
2 BHK62.18 Sq.mts. ( 669 Sq.ft. )
1 BHK29.45 Sq.mts. ( 317 Sq.ft. )
1 BHK29.48 Sq.mts. ( 317 Sq.ft. )
1 BHK29.73 Sq.mts. ( 320 Sq.ft. )
1 BHK29.79 Sq.mts. ( 321 Sq.ft. )
1 BHK29.82 Sq.mts. ( 321 Sq.ft. )
1 BHK30.1 Sq.mts. ( 324 Sq.ft. )
1 BHK30.75 Sq.mts. ( 331 Sq.ft. )
1 BHK30.8 Sq.mts. ( 332 Sq.ft. )
1 BHK30.84 Sq.mts. ( 332 Sq.ft. )
1 BHK31.08 Sq.mts. ( 335 Sq.ft. )
1 BHK31.12 Sq.mts. ( 335 Sq.ft. )
1 BHK31.31 Sq.mts. ( 337 Sq.ft. )
1 BHK31.32 Sq.mts. ( 337 Sq.ft. )
1 BHK38.47 Sq.mts. ( 414 Sq.ft. )
1 BHK38.56 Sq.mts. ( 415 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Baldevsingh Thakur Sra Coop Hsg Soc Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
Will Be Done Before Occupation Certificate (O.C)
Energy management
Na
Fire Protection And Fire Safety Requirements80% completed
80% Complete
Will Be Done Before Occupation Certificate (O.C) O
Landscaping & Tree Planting
Will Be Done Before Occupation Certificate (O.C) O
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)95% completed
95% Complete
Will Be Done Before Occupation Certificate (O.C) O
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting50% completed
50% Complete
Will Be Done Before Occupation Certificate (O.C) O
Water Supply75% completed
75% Complete
Will Be Done Before Occupation Certificate (O.C) O
Buildings / Wings in Baldevsingh Thakur Sra Coop Hsg Soc Ltd
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Baldevsingh Thakur Sra Coop Hsg Soc Ltd by Krishna Narsingrao Pimplelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

15134 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

102 apartments in total
Total
102
Booked
35
Available
67

Saleable Area Statistics (Sq. ft.)

45783 Total
Total
45783
Booked
15373
Available
30410
Total 102 apartments in project. 35 apartments booked. 34% apartments booked.
Total 45783 Sq.ft. saleable area. 15373 saleable area booked.
34% area booked.

Atlantic Laxmi Residency

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Atlantic Laxmi ResidencyAug 2023150010111
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.97 Sq.mts. ( 441 Sq.ft. )11
3 Booked27% Booked
27% Booked
1 BHK41.02 Sq.mts. ( 442 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK41.53 Sq.mts. ( 447 Sq.ft. )13
4 Booked30% Booked
30% Booked
1 BHK41.56 Sq.mts. ( 447 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK59.81 Sq.mts. ( 644 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK59.82 Sq.mts. ( 644 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK60.11 Sq.mts. ( 647 Sq.ft. )11
3 Booked27% Booked
27% Booked
2 BHK62.15 Sq.mts. ( 669 Sq.ft. )13
4 Booked30% Booked
30% Booked
2 BHK62.18 Sq.mts. ( 669 Sq.ft. )1
None Booked0% Booked
0% Booked
55 total apartments / 19 apartments booked. 34% apartments booked.
Work Description in Building Atlantic Laxmi ResidencyCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress84% done
84% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Baldevsingh Thakur Sra Coop Hsg Soc Ltd

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Baldevsingh Thakur Sra Coop Hsg Soc LtdAug 2023141010151
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.45 Sq.mts. ( 317 Sq.ft. )3
2 Booked66% Booked
66% Booked
1 BHK29.48 Sq.mts. ( 317 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK29.73 Sq.mts. ( 320 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK29.79 Sq.mts. ( 321 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK29.82 Sq.mts. ( 321 Sq.ft. )11
5 Booked45% Booked
45% Booked
1 BHK30.1 Sq.mts. ( 324 Sq.ft. )4
1 Booked25% Booked
25% Booked
1 BHK30.75 Sq.mts. ( 331 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK30.8 Sq.mts. ( 332 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK30.84 Sq.mts. ( 332 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK31.08 Sq.mts. ( 335 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK31.12 Sq.mts. ( 335 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK31.31 Sq.mts. ( 337 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK31.32 Sq.mts. ( 337 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38.47 Sq.mts. ( 414 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK38.56 Sq.mts. ( 415 Sq.ft. )1
None Booked0% Booked
0% Booked
47 total apartments / 16 apartments booked. 34% apartments booked.
Work Description in Building Baldevsingh Thakur Sra Coop Hsg Soc LtdCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress97% done
97% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress84% done
84% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Krishna Narsingrao Pimple
for Project
Baldevsingh Thakur Sra Coop Hsg Soc Ltd
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation