Project overview

Balaji Estate is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700027980. Balaji Estate is located at Survey No 17. This is a New being developed by M/S. Sai Balaji Buildcon.

Balaji Estate has 1 BHK Apartments with carpet areas ranging from 309 to 443 Sq.ft. Carpet. The Project has total 396 of which 90 are currently available for sale.

Balaji Estate is being developed on a total land area of 54681 Sq.ft. out of which 10740 Sq.ft. i.e 20% is reserved for recreational purposes. Balaji Estate has 3 Wings / Towers Balaji Estate - Blossom,Balaji Estate - Icon,Balaji Estate - Joy

ProjectDeveloperLocationPossession
ArinGoraksh Builders9589, 9590, 959131-10-2024 00:00:00
Swami ChetanaOm Sai Builders And DevelopersVishnu Nagar, Dombivli West30-04-2025 00:00:00
Devram SmrutiPatil And Associates651 To 661 And 662B30-06-2022 00:00:00
UtkarshMadhav Bhalchandra ParanjapeCts No 10042To 1004731-12-2017 00:00:00
Varsha PalmShree Umiya Developers4843,4875,488231-12-2019 00:00:00
VighnahartaJd Aasociations1387 To 139130-04-2026 00:00:00
Haresh NiwasKuldevi Developers6641 To 664531-03-2025 00:00:00
AshtavinayakParisparsh98015-04-2025 00:00:00
Nascon MatoshreeOmkar Developers2105 To 211031-12-2026 00:00:00
Vasant ComplexShree Sai Malhar ConstructionGandhinagar31-12-2026 00:00:00
Bank Of Maharashtra Employees Manisha Co-Operative Housing Society LimitedJ B ConstructionsCts No. 10428 To 1043231-01-2025 00:00:00
Mahavir Sarvoday PlazaVira Theatres Pvt Ltd1678, 1691 To 169530-03-2026 00:00:00
Maitri Rukmini SadanMaitri CreationsCts No 6399 To 640230-05-2024 00:00:00
Rudra HeightsA.S.D. EnterprisesDeendayal Road30-12-2023 00:00:00
Indira TowersKshitij Developers10960A,10961,1096231-12-2018 00:00:00
Yugandhar SudamaChaturthi Vastu DevelopersCts 10848 T0 10904 And 10906 To 10916/Survey No. 7201-07-2026 00:00:00
Nayantara AssociatesNayantara Associates4282 To 428520-12-2021 00:00:00
Mangalmurti ArcadeShree Hanuman Krupa EnterprisesS No Old 65 New 7 H No 1/1, 1/2, 1/330-06-2019 00:00:00
Balaji ResidencyOm Swayambhu Siddhivinayak Builders And DevelopersOld Survey No 135 New Survey No92 Old Survey 136 New Survey No 91 Old Survey No 81 New Survey No 9330-12-2023 00:00:00
Ayodhya ImperialNirmaan Realty511019-10-2025 00:00:00
Maitri Narayan BhuvanMaitri Ganadhish42120131-12-2028 00:00:00
Mandarmala Co-Operative Housing Society LimitedRachana EmpireCts Nos 2495/A/1 And 2496/A31-12-2027 00:00:00
Mangalmurti HomesSarvodaya Land DevelopersdevelopersS No 194 Old 78 New H No 331-12-2019 00:00:00
Shree ApartmetnAdik Jayaram Mhatre16/A/2/A/2/A31-03-2019 00:00:00
SuyogMadhav Bhalchandra ParanjapePlot No.4 Cts No.10700To10704. S.No.59/4Pt31-12-2017 00:00:00
Om MaitriOscar Infrastructure Pvt LtdCts No 8265 To 8269 And 8279 To 828430-06-2025 00:00:00
AdishaktiAdimaya Enterprise11049 To 1105703-06-2023 00:00:00
Amber BlissM/S. Amber CombinesCts No 3552 To 355731-12-2025 00:00:00
Rajas LeelaNakhye's Everest Estate Private LimitedC.T.S. 1616 To 1619, 191431-05-2026 00:00:00
Shree Ram Radha DamodarAditya Buildcon6139 6140 7359 To 736231-03-2026 00:00:00
Sai Ganesh Co-Operative Housing Society LtdShree Vyankatesh EnterprisesPlot No 24 Old Survey No 326/A (Part) New Survey No 229 (Part)31-05-2026 00:00:00
Sarvoday AanandOm Sai Land DevelopersSurvey No 345 Old 31 New Hissa No 1230-12-2020 00:00:00
Ekdant DevelopersEkdant DevelopersCts No 368 To 37430-06-2022 00:00:00
Amar OrchidAmar RealtyS.No.130,129630-06-2018 00:00:00
Marathon Nexworld NovaSunset Spaces Pvt. Ltd.16/3,16/4,17/3,17/131-12-2026 00:00:00
Neel Krishna Chs ProposedSplendor Shelters Pvt LtdCts No 5253 525431-10-2024 00:00:00
Ascent GalaxyNestscout Buildcon Private Limited138 To 146 And 181 To 19105-12-2025 00:00:00
Varad CastleVarad EnterprisesS No. 113/1 Cts No. 4013 & 4014 Moujedombivali31-12-2026 00:00:00
Mahek MeadowsM/S Riddhi Siddhi InfraprojectsSurvey No.84/2, Gau. Plot No.4631-12-2026 00:00:00
Hira-KrishnaShree Kesarinandan Developers91(A) & 91(B), H.No.3131-07-2027 00:00:00
Sarthi SerenitySarthi DevelopersS No-264, H No-20 , Plot No.1830-06-2026 00:00:00
Shree Krishna PlazaShree Hanuman EnterprisesSurvey No 26, Hissa No 430-12-2019 00:00:00
Sarvoday SnehEkta Land DevelopersSurvey No 101 New, 86 Old30-09-2020 00:00:00
NirmalBhalchandra Vinayak Wadnerkar338 Cts 11910 To 1191331-12-2017 00:00:00
Joshi Datta NagarBhalchandra Vinayak Wadnerkar343/ 11870 To 1187331-12-2017 00:00:00
Maitri PrasadMaitri ConstructionCts No 11957 To 1196221-11-2018 00:00:00
Ravichandra Chs ProposedSplendor Shelters Private LimitedS No 46 1 D 62 2 B 4 Cts No 9878 9879 988030-09-2027 00:00:00
Trinity - Shashank SaptshrungRadhika Construction CompanyCts No 3084, S No 65, Hissa No 531-08-2028 00:00:00
Gajanan PrideBalaji InfraCts No. 11563/131-12-2027 00:00:00
Satis ChsPacific ImpressionS No 18-4, Plot No. 2 To 11 And 1431-01-2021 00:00:00
Vaishnai CoplexSangita Singh421201, Thane31-03-2018 00:00:00
Madhu PremShree Developers58 , Hissa No 2P31-12-2018 00:00:00
Varija ApartmentGanesha Developers4215 To 422730-03-2021 00:00:00
Yashraj HomesA J Om Enterprises421201, Thane01-01-2021 00:00:00
Sarvoday HillAashish CombinesSurvey New 6 Old 211 Hisa No 1 And 231-01-2021 00:00:00
Samruddhi GuruprasadSamruddhi DevelopersCts No 3579 To 361425-08-2018 00:00:00
Aai Chs LtdKalash DevelopersCts No 826431-12-2017 00:00:00
Shuban SocietyShrikrishna Marathe119 Hissa No. Part Old Survey No.177B28-02-2019 00:00:00
Pushkaraj Chs ProposedSplendor Shelters Pvt LtdCts 1362 1363 And 1364 S No 93A18231-03-2025 00:00:00
Sudarshan Co-Op. Hsg. Soc. Ltd.Gayatri FoundationCts No-9528(Pt), 9529 To 953231-05-2026 00:00:00
Nandadeep Chs LtdAditya Buildcon6739 To 674731-03-2028 00:00:00
Shree Sai AshirwadShree Sai Ashirwad EnterprisesSurvey No 121 / Hissa No. 19/1 Mouje -Dawadi28-02-2025 00:00:00
Snehbandhan ChsAyushi Infra Enterprise Private Limited8198 To 820730-09-2020 00:00:00
Parth SkyoneParth ParikhRh 212 Rh213 Rh214 Rh21530-12-2023 00:00:00
SaptashrungiPadmavati Builders2192 To 220031-12-2026 00:00:00
Maitri Siddha SadanMokashi Jadhav & AssociatesCts 2321 To 232531-01-2025 00:00:00
Nascon InspireVighnaharta Developers2806 A, 281931-12-2024 00:00:00
Tsp HeightsAshwamegh Assoicates67, H.No.131-07-2022 00:00:00
Manjiri HeightsYash InfrastructureSurvey No 185, Hissa No 1 And 730-06-2018 00:00:00
Jai Santoshi Mata HeightsRajiv Thakur & AssociatesS.No.243 H.No.10 Old S.No.2 Ho.No.10 New31-03-2018 00:00:00
Srinivasa NilayamNilaya EnterprisesS . No. 59 H.No .4/L Plot No 1230-06-2026 00:00:00
Patels PearlPramukh DevelopersSurvey No 61 Hissa No9 P Cts No 185 And 18631-10-2026 00:00:00
Devansh HeightsNilaya EnterprisesS. No 59 H.No - 4/P /Plot No -1130-06-2026 00:00:00
Indira GalaxyShree DevelopersS No 327 H No 1/A Plot No 23 Cts No 2190 To 219631-12-2026 00:00:00
Bamubai SadanSamarth DevelopersSurvey No 164 Old Survey No 29 New Hissa No 2 And 3 And 431-10-2019 00:00:00
Maitri Indira SadanMaitri ConstructionCts No 6874 To 687621-11-2018 00:00:00
Saraswati CastleBhumika DevelopersSurvey No 23, Hissa No 5/1/2 Part, C T S No 9018 To 902230-04-2018 00:00:00
Yash SarthakAkshay EnterprisesPlot No.15 Survey No. 81 Part31-12-2019 00:00:00
Mahalaxmi KrupaMahalaxmi EnterprisesS No 82/231-05-2019 00:00:00
Kanha ResidencyKanha Motiram Kene5724 To 5735 And 5742 To 575031-12-2017 00:00:00
Balaji EstateM/S. Sai Balaji BuildconSurvey No 1730-06-2025 00:00:00
Nakshatra AshviniNakshatra DeveloperCts No 3651 To 365531-12-2024 00:00:00
Radha - The Divine MysteryPacific Innovations Llp31515-10-2024 00:00:00
Jai Shree Swami Samarth Bhalchandra Vinayak WadnerkarCts 9945 To 995331-12-2018 00:00:00
Shree Sai Raj Park Building No 3 C WingSarvodayrajconstructioncompanyS No 42 43 99 Hissa No 1 Cts No 2335 To 2337 2373 2386 To 2395 2470 To 253131-12-2019 00:00:00
Omkar EnclaveOmkar EnterprisesSr 67 Pr Card No 11269To1128930-12-2023 00:00:00
Sunrise GalaxySunrise DevelopersGhanshyam Gupte Road31-01-2020 00:00:00
Solitaire Industrial EstateShelter ConstructionTs - 131-12-2018 00:00:00
Sona ParadiseSona Enterprises421201, Thane31-12-2016 00:00:00
Mahavir Heights NxVira Theatres Pvt LtdCts No 707331-01-2021 00:00:00
Purushottam Kshitij Abhijit Bhaskar KelkarC.T.S. No 11007 To 11010. S.No.64/1 P Plot No 408-12-2019 00:00:00
Shailjeet HeightsMandakini Keshav Tokre6390 To 639331-12-2018 00:00:00
Rambhuvan ResidencyAbhay Anant KamatPlot No 42, Survey No 91A/1/1 And 91B / C T S No 8388 To 839331-12-2017 00:00:00
Suchit SquareImpressionsPlot No 01, Dombivli Chs Ltd27-02-2018 00:00:00
Sumati SkylineSubhash Skyline InfraCts No 1392, 139330-09-2026 00:00:00
Sarvoday ShwetaRachana Enterprises2324A, 253630-06-2021 00:00:00
RekhazR Nutan Builders Private Limited101731-03-2027 00:00:00
Project Details
  • Project:
    Balaji Estate
  • Location:
  • Survey No 17
  • Const. Stage:
    New
  • Possession:
    30 Jun 2025
Developer Details

  • Developer:
    M/S. Sai Balaji Buildcon
  • Phone:
  • Address:
  • Ratan Galaxie
Project RERA Details
MAHA REARA No: P51700027980
Project Type Residential / Group Housing
RERA Project Status New
Architect Sthapatya Nirmaan
Funding Bank IDBI BANK
Proposed Possession 30 Jun 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 21 Jan 2021
Last Retrived 26 Jul 2025
Balaji Estate QR Code
Balaji Estate
MahaRERA - P51700027980
Apartment Details & Configuration
TypeArea
1 BHK36.14 Sq.mts. ( 389 Sq.ft. )
1 BHK41.16 Sq.mts. ( 443 Sq.ft. )
2 BHK53.98 Sq.mts. ( 581 Sq.ft. )
Shop13.31 Sq.mts. ( 143 Sq.ft. )
Shop13.61 Sq.mts. ( 146 Sq.ft. )
Shop16.63 Sq.mts. ( 179 Sq.ft. )
1 BHK28.71 Sq.mts. ( 309 Sq.ft. )
1 BHK29.54 Sq.mts. ( 318 Sq.ft. )
1 BHK30.66 Sq.mts. ( 330 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Balaji Estatelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements50% completed
50% Complete
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
Kdmc
Buildings / Wings in Balaji Estate
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Balaji Estate by M/S. Sai Balaji Buildconlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

54681 Sq. ft.

Project Area

10740 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

396 apartments in total
Total
396
Booked
306
Available
90

Saleable Area Statistics (Sq. ft.)

169582 Total
Total
169582
Booked
134742
Available
34840
Total 396 apartments in project. 306 apartments booked. 77% apartments booked.
Total 169582 Sq.ft. saleable area. 134742 saleable area booked.
79% area booked.

Balaji Estate - Blossom

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Balaji Estate - BlossomDec 2024191010101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.14 Sq.mts. ( 389 Sq.ft. )18
13 Booked72% Booked
72% Booked
1 BHK41.16 Sq.mts. ( 443 Sq.ft. )52
43 Booked82% Booked
82% Booked
2 BHK41.16 Sq.mts. ( 443 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK53.98 Sq.mts. ( 581 Sq.ft. )35
35 Booked100% Booked
100% Booked
Shop13.31 Sq.mts. ( 143 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.61 Sq.mts. ( 146 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop16.63 Sq.mts. ( 179 Sq.ft. )6
None Booked0% Booked
0% Booked
118 total apartments / 92 apartments booked. 77% apartments booked.
Work Description in Building Balaji Estate - BlossomCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress45% done
45% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Balaji Estate - Icon

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Balaji Estate - IconDec 2024191010121
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.14 Sq.mts. ( 389 Sq.ft. )18
7 Booked38% Booked
38% Booked
1 BHK41.16 Sq.mts. ( 443 Sq.ft. )52
19 Booked36% Booked
36% Booked
2 BHK41.16 Sq.mts. ( 443 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK53.98 Sq.mts. ( 581 Sq.ft. )35
34 Booked97% Booked
97% Booked
106 total apartments / 61 apartments booked. 57% apartments booked.
Work Description in Building Balaji Estate - IconCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress45% done
45% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Balaji Estate - Joy

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Balaji Estate - JoyDec 2024231010121
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.71 Sq.mts. ( 309 Sq.ft. )20
13 Booked65% Booked
65% Booked
1 BHK29.54 Sq.mts. ( 318 Sq.ft. )20
20 Booked100% Booked
100% Booked
1 BHK30.66 Sq.mts. ( 330 Sq.ft. )44
44 Booked100% Booked
100% Booked
1 BHK36.14 Sq.mts. ( 389 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK41.16 Sq.mts. ( 443 Sq.ft. )87
75 Booked86% Booked
86% Booked
172 total apartments / 153 apartments booked. 88% apartments booked.
Work Description in Building Balaji Estate - JoyCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
M/S. Sai Balaji Buildcon
for Project
Balaji Estate
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation