Project overview

Bait Us Salam is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900021783. Bait Us Salam is located at Ghass Gully. This is a New Project being developed by Y H Assoicates.

Bait Us Salam has 1 BHK Apartments with carpet areas ranging from 425 to 428 Sq.ft. Carpet. The Project has total 91 of which 73 are currently available for sale.

Bait Us Salam is being developed on a total land area of 14400 Sq.ft. out of which 1184 Sq.ft. i.e 8% is reserved for recreational purposes. Bait Us Salam has 2 Wings / Towers Wing - A,Wing - B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Bait Us Salam
  • Location:
  • Ghass Gully
  • Const. Stage:
    New Project
  • Possession:
    01 Jun 2026
Developer Details

  • Developer:
    Y H Assoicates
  • Phone:
  • Address:
  • 19, Patka Manzil, 10 S.V.P. Road, Opp Shalimar Restaurant, Bhendi Bazar, 400011
Project RERA Details
MAHA REARA No: P51900021783
Project Type Residential
RERA Project Status New Project
Funding Bank UNION BANK OF INDIA
Proposed Possession 01 Jun 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 02 May 2022
Last Retrived 28 Jul 2025
Bait Us Salam QR Code
Bait Us Salam
MahaRERA - P51900021783
Apartment Details & Configuration
TypeArea
1 BHK38.95 Sq.mts. ( 419 Sq.ft. )
1 BHK39.03 Sq.mts. ( 420 Sq.ft. )
1 BHK39.15 Sq.mts. ( 421 Sq.ft. )
1 BHK39.26 Sq.mts. ( 423 Sq.ft. )
1 BHK44.46 Sq.mts. ( 479 Sq.ft. )
2 BHK49.98 Sq.mts. ( 538 Sq.ft. )
1 BHK39.47 Sq.mts. ( 425 Sq.ft. )
1 BHK39.75 Sq.mts. ( 428 Sq.ft. )
1 BHK39.79 Sq.mts. ( 428 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Bait Us Salamlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Proposed In The Form Of Paved Rg
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Sub Station Is Proposed
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Cfo Remarks
Landscaping & Tree Planting
As Per Mcgm Remarks
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Mcgm Remarks
Solid Waste Management And Disposal
-
Storm Water Drains
As Per Mcgm Remarks
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Mcgm Remarks
Water Supply
As Per Mcgm Remarks
Buildings / Wings in Bait Us Salam
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Bait Us Salam by Y H Assoicateslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

14400 Sq. ft.

Project Area

1184 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

91 apartments in total
Total
91
Booked
18
Available
73

Saleable Area Statistics (Sq. ft.)

38870 Total
Total
38870
Booked
7709
Available
31161
Total 91 apartments in project. 18 apartments booked. 19% apartments booked.
Total 38870 Sq.ft. saleable area. 7709 saleable area booked.
20% area booked.

Wing - A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - AJan 202517100400
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.95 Sq.mts. ( 419 Sq.ft. )9
None Booked0% Booked
0% Booked
1 BHK39.03 Sq.mts. ( 420 Sq.ft. )9
None Booked0% Booked
0% Booked
1 BHK39.15 Sq.mts. ( 421 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK39.26 Sq.mts. ( 423 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK44.46 Sq.mts. ( 479 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK49.98 Sq.mts. ( 538 Sq.ft. )1
None Booked0% Booked
0% Booked
29 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing - ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress26% done
26% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
work-in-progress35% done
35% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress60% done
60% Booked
X number of Podiums
work-in-progress35% done
35% Booked
X number of Slabs of Super Structure

Wing - B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - BJan 2025241004054
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.47 Sq.mts. ( 425 Sq.ft. )11
None Booked0% Booked
0% Booked
1 BHK39.75 Sq.mts. ( 428 Sq.ft. )26
None Booked0% Booked
0% Booked
1 BHK39.79 Sq.mts. ( 428 Sq.ft. )25
18 Booked72% Booked
72% Booked
62 total apartments / 18 apartments booked. 29% apartments booked.
Work Description in Building Wing - BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
work-in-progress35% done
35% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress35% done
35% Booked
X number of Podiums
work-in-progress35% done
35% Booked
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Y H Assoicates
for Project
Bait Us Salam
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation