Project overview

Bafna Meadows Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000002364. Bafna Meadows Phase 2 is located at 409/3P 409/4P 827/16. This is a Ongoing being developed by Suvidha Realtors.

Bafna Meadows Phase 2 has 1 BHK, 2 BHK & SHOP Apartments with carpet areas ranging from 116 to 658 Sq.ft. Carpet. The Project has total 107 of which 21 are currently available for sale.

Bafna Meadows Phase 2 is being developed on a total land area of 60039 Sq.ft. out of which 6003 Sq.ft. i.e 10% is reserved for recreational purposes. Bafna Meadows Phase 2 has 3 Wings / Towers Iris,Ivy,Tulip

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Bafna Meadows Phase 2
  • Location:
  • 409/3P 409/4P 827/16
  • Const. Stage:
    Ongoing
  • Possession:
    01 Dec 2022
Developer Details

  • Developer:
    Suvidha Realtors
  • Phone:
  • Address:
  • Vadgadi
Project RERA Details
MAHA REARA No: P99000002364
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Sairachana
Funding Bank BANK OF BARODA
Proposed Possession 01 Dec 2022
Revised Possession 01 Dec 2022
Extended Possession 30 Jun 2023
Litigations No Litigations
Last Modified 30 Jan 2023
Last Retrived 28 Jul 2025
Bafna Meadows Phase 2 QR Code
Bafna Meadows Phase 2
MahaRERA - P99000002364
Apartment Details & Configuration
TypeArea
1 BHK38.24 Sq.mts. ( 412 Sq.ft. )
1 BHK38.38 Sq.mts. ( 413 Sq.ft. )
1 BHK41.06 Sq.mts. ( 442 Sq.ft. )
2 BHK47.03 Sq.mts. ( 506 Sq.ft. )
2 BHK49.28 Sq.mts. ( 530 Sq.ft. )
2 BHK51.13 Sq.mts. ( 550 Sq.ft. )
2 BHK51.15 Sq.mts. ( 551 Sq.ft. )
1 BHK44.41 Sq.mts. ( 478 Sq.ft. )
1 BHK46.85 Sq.mts. ( 504 Sq.ft. )
2 BHK50.28 Sq.mts. ( 541 Sq.ft. )
2 BHK54.47 Sq.mts. ( 586 Sq.ft. )
2 BHK59.05 Sq.mts. ( 636 Sq.ft. )
2 BHK61.14 Sq.mts. ( 658 Sq.ft. )
SHOP10.75 Sq.mts. ( 116 Sq.ft. )
SHOP12.31 Sq.mts. ( 133 Sq.ft. )
SHOP13.87 Sq.mts. ( 149 Sq.ft. )
SHOP13.91 Sq.mts. ( 150 Sq.ft. )
SHOP15.43 Sq.mts. ( 166 Sq.ft. )
SHOP16.8 Sq.mts. ( 181 Sq.ft. )
SHOP17.46 Sq.mts. ( 188 Sq.ft. )
SHOP18.47 Sq.mts. ( 199 Sq.ft. )
SHOP23.33 Sq.mts. ( 251 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Bafna Meadows Phase 2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Not Started
Community Buildings
Work Not Started
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Work Not Started
Landscaping & Tree Planting50% completed
50% Complete
Work In Progress
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Started
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Work Done
Street Lighting
Work Not Started
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Work Not Started
Water Supply50% completed
50% Complete
Work In Progress
Buildings / Wings in Bafna Meadows Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Bafna Meadows Phase 2 by Suvidha Realtorslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

60039 Sq. ft.

Project Area

6003 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

107 apartments in total
Total
107
Booked
86
Available
21

Saleable Area Statistics (Sq. ft.)

49097 Total
Total
49097
Booked
39236
Available
9861
Total 107 apartments in project. 86 apartments booked. 80% apartments booked.
Total 49097 Sq.ft. saleable area. 39236 saleable area booked.
80% area booked.

Iris

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
IrisJan 20217101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.24 Sq.mts. ( 412 Sq.ft. )24
19 Booked79% Booked
79% Booked
1 BHK38.38 Sq.mts. ( 413 Sq.ft. )18
16 Booked88% Booked
88% Booked
42 total apartments / 35 apartments booked. 83% apartments booked.
Work Description in Building IrisCompletion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
work-in-progress80% done
80% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress33% done
33% Booked
Stilt Floor
work-in-progress50% done
50% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress80% done
80% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress80% done
80% Booked

Ivy

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
IvyJan 20217101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.06 Sq.mts. ( 442 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK47.03 Sq.mts. ( 506 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK49.28 Sq.mts. ( 530 Sq.ft. )12
4 Booked33% Booked
33% Booked
2 BHK51.13 Sq.mts. ( 550 Sq.ft. )6
5 Booked83% Booked
83% Booked
2 BHK51.15 Sq.mts. ( 551 Sq.ft. )6
6 Booked100% Booked
100% Booked
32 total apartments / 21 apartments booked. 65% apartments booked.
Work Description in Building IvyCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Tulip

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
TulipJan 20215101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44.41 Sq.mts. ( 478 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK46.85 Sq.mts. ( 504 Sq.ft. )4
3 Booked75% Booked
75% Booked
2 BHK50.28 Sq.mts. ( 541 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK54.47 Sq.mts. ( 586 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK59.05 Sq.mts. ( 636 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK61.14 Sq.mts. ( 658 Sq.ft. )4
4 Booked100% Booked
100% Booked
SHOP10.75 Sq.mts. ( 116 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP12.31 Sq.mts. ( 133 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.87 Sq.mts. ( 149 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.91 Sq.mts. ( 150 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP15.43 Sq.mts. ( 166 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.8 Sq.mts. ( 181 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.46 Sq.mts. ( 188 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.47 Sq.mts. ( 199 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP23.33 Sq.mts. ( 251 Sq.ft. )1
1 Booked100% Booked
100% Booked
33 total apartments / 30 apartments booked. 90% apartments booked.
Work Description in Building TulipCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
work-in-progress90% done
90% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress68% done
68% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress57% done
57% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress57% done
57% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress57% done
57% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress57% done
57% Booked
Stilt Floor
work-in-progress60% done
60% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress68% done
68% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Suvidha Realtors
for Project
Bafna Meadows Phase 2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.