Project overview

Azure is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800002018. Azure is located at Plot 11 Sector 8 Taloja Navi Mumbai. This is a Ongoing being developed by One Buildcon.

Azure has 2 BHK Apartments with carpet areas ranging from 383 to 421 Sq.ft. Carpet. The Project has total 40 of which 30 are currently available for sale.

Azure is being developed on a total land area of 11625 Sq.ft. Azure has 1 Wings / Towers Azure Building

ProjectDeveloperLocationPossession
Trinity Co Op Hsg Soc LtdPioneer EnterprisesCts No.64F630-12-2019 00:00:00
Redevelopment Of Tirandaz Subha Niketan Chs Ltd.Heritage Lifestyles & Developers Pvt. Ltd.10/8331-03-2019 00:00:00
AzureOne BuildconPlot 11 Sector 8 Taloja Navi Mumbai31-12-2019 00:00:00
Tungwa PowaiMhada118 119 D231-03-2018 00:00:00
Atlantis C WingHgp Community Pvt. Ltd.14C Pt And 16A Pt31-12-2019 00:00:00
Atlantis A And B WingHgp Community Pvt. Ltd.16A Pt31-12-2019 00:00:00
Project Details
  • Project:
    Azure
  • Location:
  • Plot 11 Sector 8 Taloja Navi Mumbai
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    One Buildcon
  • Phone:
  • Address:
  • Millenium Tower
Project RERA Details
MAHA REARA No: P51800002018
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Dimensions
Funding Bank THE COSMOS CO OPERATIVE BANK LIMITED
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Dec 2021
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 26 Jul 2025
Azure QR Code
Azure
MahaRERA - P51800002018
Apartment Details & Configuration
TypeArea
2 BHK35.54 Sq.mts. ( 383 Sq.ft. )
2 BHK39.07 Sq.mts. ( 421 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Azurelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
Wip
Energy management
Na
Fire Protection And Fire Safety Requirements90% completed
90% Complete
Wip
Landscaping & Tree Planting
Yet To Start
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)95% completed
95% Complete
Wip
Solid Waste Management And Disposal
Na
Storm Water Drains80% completed
80% Complete
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Yet To Start
Water Supply80% completed
80% Complete
Temporary From Cidco
Buildings / Wings in Azure
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Azure by One Buildconlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

11625 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

40 apartments in total
Total
40
Booked
10
Available
30

Saleable Area Statistics (Sq. ft.)

16062 Total
Total
16062
Booked
4054
Available
12009
Total 40 apartments in project. 10 apartments booked. 25% apartments booked.
Total 16062 Sq.ft. saleable area. 4054 saleable area booked.
25% area booked.

Azure Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Azure BuildingJan 1900211011022
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK35.54 Sq.mts. ( 383 Sq.ft. )20
4 Booked20% Booked
20% Booked
2 BHK39.07 Sq.mts. ( 421 Sq.ft. )20
6 Booked30% Booked
30% Booked
40 total apartments / 10 apartments booked. 25% apartments booked.
Work Description in Building Azure BuildingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress96% done
96% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress90% done
90% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
One Buildcon
for Project
Azure
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation