Project overview

Azad Laxmi Nagar Sra Chs is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800004539. Azad Laxmi Nagar Sra Chs is located at Cts No 1A/178/2 Survey No 161. This is a New being developed by Goodbuild (India) Private Limited.

Azad Laxmi Nagar Sra Chs has 1 BHK Apartments with carpet areas ranging from 313 to 313 Sq.ft. Carpet. The Project has total 105 of which 20 are currently available for sale.

Azad Laxmi Nagar Sra Chs is being developed on a total land area of 31216 Sq.ft. out of which 2497 Sq.ft. i.e 8% is reserved for recreational purposes. Azad Laxmi Nagar Sra Chs has 2 Wings / Towers A Wing,B-Wing

ProjectDeveloperLocationPossession
Redevelopment Of Ganpati Niwas ChslBharat Realty Venture Private LimitedCts No 99931-07-2025 00:00:00
Kalpataru Radiance DKeyana Estate LlpCts No.260/5A -Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Kalpataru Radiance AKeyana Estate LlpCts No.260/5A -Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Kalpataru Radiance BKeyana Estate LlpCts No.260/5A Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Navkar AshrayNavkar Builder &Amp; DevvelopersTilak Nagar30-04-2016 00:00:00
Anmol Fortune - IiWadhwa Realty Pvt Ltd. Cts No-58 Part 1 To 7631-12-2019 00:00:00
Sharad Apartments Chs LtdAakar Constructions20331-12-2017 00:00:00
Constrution Of 24 Lig Ts On Cts No 356 P At Siddharth Nagar Goregaon West Mumbai 400062Mumbai Housing And Area Development BoardCts No 356 Part30-06-2019 00:00:00
Raj - BaijuRaj Arcade Pvt. Ltd.Cts 456/ Plot No 32431-12-2019 00:00:00
Plot No 88Jitesh Bhawarlal Jain716, 7161 To 1131-05-2018 00:00:00
Mayadevi/ VikuthdhamHome Today Renovation India Pvt.Ltd584, 584/1 To 831-12-2018 00:00:00
Om Shubh LabhBali Realty Llp695, 695/1 To 695/630-06-2018 00:00:00
Aum HeightsAbhismit EnterprisesPlot No 30 Cts No 221 Pt31-12-2018 00:00:00
Goregaon Makarand Chs, ParagGolden Land16731-05-2019 00:00:00
Siddharth Nagar Sukhvilla Chs LtdDilip Hiralal DoshiPlot No 6 - Cts No 350 Part 350/ 13 To 1630-06-2018 00:00:00
34 Park EstateM/S Reddy Builders & Developers50 A Part, 55 Part, 49 Part31-07-2028 00:00:00
Laxmi HeightsLaxmidevi DevelopersPlot No 30731-12-2018 00:00:00
Swati C.H.S. LtdDilip Hiralal DoshiCts No 348 P 348 70 To 7230-06-2018 00:00:00
Kalpataru Radiance EKeyana Estate LlpCts No.260/5A Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Samarth ResidencyAjay Sitaram Surve560, 1 To 630-12-2022 00:00:00
Jairajratna Chs LtdMumbai Shelter Project Jairajratan LlpMumbai Suburban30-06-2019 00:00:00
HimbinduM/S. Sahajanand Developers292/21 To 30, 292 Pt31-12-2018 00:00:00
Raj PantheonRajesh Surti40010403-07-2015 00:00:00
Vaibhav Chs LtdSwastik Realty Pvt Ltd22030-06-2018 00:00:00
Siddarth Nagar Arunodaya Chs LtdChiraginfraprojectspvt LtdMumbai Suburban, 40006231-03-2018 00:00:00
Ariisto Sommet-RetailAtithi Builders And Constructors Private Limited236/A/5 Of Village Pahadi Goregaon Tal. Borivali Msd, Notionally Divided Part Of Cts No 236/A/130-12-2023 00:00:00
Goregaon Rasik Co Op Hsg Society LtdAakar Real Estate DevelopersCts No. 208 Plot No 11431-03-2019 00:00:00
Dridhena Developers And RealtorsDridhena Developers And Realtors662, 662/1 To 528-02-2019 00:00:00
Dharmanath KrupaBali Landmarks Llp679/1 To 679/7, 67931-12-2018 00:00:00
Building On Sub Plot - D, Cts No 101/B Of Village GoregaonSkyline Construction Co.Part Of Sub Plot D Cts No 101 B Of Village Goregaon At Oshiwara District Centre Goregaon W Mumbai31-10-2019 00:00:00
Diwaprabhu ResidencyDiwaprabhu HomesCts No. 521.521/1 To 416-07-2018 00:00:00
Dineshkunj Chs LtdSwastik Realty Pvt Ltd188 Cts No.60730-06-2018 00:00:00
Shri Ganesh ApartmentsMatushree Real Estate Developers Private LimitedCity Survey Number 22231-12-2017 00:00:00
Meeras Empire And Meeras CrownRushabh Real Estate Developers Private Limited50Pt28-11-2023 00:00:00
Pahhal AvenueUmmang Realtors Llp799/1 To 8, 79931-12-2019 00:00:00
Redevelopment Of Navchandrakunj ChslPranav Constructions LimitedPlot No.42, Cts No.734/A, 734/1 To 630-03-2022 00:00:00
Redevelopment Of Goregaon Prakash C.H.S.Ltd.M/S. Madhav Enterprises194/1 And 231-12-2018 00:00:00
Goregaon Janseva Chs Ltd Wing A And BKarwa And Kewal Kiran RealtorsCs No. 267 Part30-12-2021 00:00:00
Asmi DreamzAjay Malshi Dedhia340 Pt, 33931-03-2018 00:00:00
Anmol Fortune - IiiWadhwa Realty Pvt Ltd. Cts No 58 Part 1 To 7630-12-2022 00:00:00
Sethia Sea View C And D WingPrathamesh Land DevelopersCts 2231-03-2019 00:00:00
AsmiSia Developers Llp1046821 To 531-12-2019 00:00:00
Siddharth Nagar SatyadeepSai Developers400104, Mumbai Suburban31-12-2019 00:00:00
Ariisto Sommet-ResidentialAshvi Developers Private LimitedNotionally Divided Part Of Cts No 236/A/1, 236/A/5 Of Village Pahadi Goregaon Tal. Borivali Msd30-12-2023 00:00:00
Redevlopment Of Sundresh Chs LtdRaj Corporation27431-12-2017 00:00:00
C Link Chandrama Co-Op. Housing Society LimitedConcrete Lifestyles &Amp; Infrastructure Private LimitedMumbai Suburban, 40010415-06-2018 00:00:00
Siddharth Nagar Gulmohar Chs LtdShivam Parivar Developers Pvt Ltd2630-12-2024 00:00:00
Viniyog Chs Ltd.Vinayak Developers190, 190/1 To 430-07-2020 00:00:00
AnandiSadhna Global Construction400062, Mumbai Suburban31-12-2017 00:00:00
Raj SpacesRajesh SurtiMumbai Suburban, 40006203-03-2010 00:00:00
S N Sahayog ChslUmang Construction CoBorivali, 400104, Mumbai Suburban31-03-2018 00:00:00
Prithvi ApartmentHitendra Nimbalkar113, 1 To 325-12-2020 00:00:00
Shiv GangaAnjani Kumar Co Pvt Ltd696, 696/130-06-2023 00:00:00
Siddharth Nagar Sukhvilla Chs Ltd Phase- 2Dilip Hiralal DoshiPlot No 6 Cts No 350 Part 350/13 To 1630-03-2022 00:00:00
Ashish Building Of Emticibom Employees Chs LtdKarwa And Kewal Kiran Realtors8362, 8363, 836430-09-2024 00:00:00
Shastri Nagar Prerna C.H.S.Ltd.Confiable ConstructionsCts No. 219 Pt30-06-2025 00:00:00
Siddharth Nagar SamataWhite Water Developers35330-04-2023 00:00:00
Siddharth Nagar Abhiman Chs Ltd Building No-25Mumbai Shelter Housing Development Pvt Ltd347 Part31-12-2019 00:00:00
Palai TowersN D Developers90230-06-2021 00:00:00
Laxmi NagarReliable ConstructionsPlot No B-1 Cts 1A170-B Pahadi Goregaon W Tal Borivali Dist Mumbai 40009030-12-2023 00:00:00
Laxmi CallistaLaxmidevi Developers283A01-09-2019 00:00:00
Siddharth Nagar Paschim Jagruti Chs LtdShivam Parivar Developers Pvt LtdCts 365 Part30-12-2026 00:00:00
The MeadowsGuruashish Construction Private LimitedPlot No.R-10, Cts No-260/9A19-11-2019 00:00:00
Redevlopment Of GovadhangiriTaksha Spaces Private Limited14- A /992/161 Part30-10-2022 00:00:00
Samosaran ApartmentsMahavir Construction Company400062, Mumbai Suburban31-12-2020 00:00:00
Vallabh Krupa ChslGun Rajan Constructions644/A/131-10-2026 00:00:00
Kabra DiamanteKabra And Associates73, 73 / 1 To 6531-12-2025 00:00:00
Satra OneBleu Noir Infrastructure Development Pvt. Ltd.217A Pt31-12-2024 00:00:00
Chandan HiraBali Shelters LlpCts No 703 Plot No 8130-09-2024 00:00:00
Siddharth Nagar Siddhivinayak Chs LtdInfinity ConstructionsCts 348/62 To 6531-12-2027 00:00:00
Luxury Chsl LtdLaxmidevi DevelopersBehind Filmistan30-06-2025 00:00:00
Project Details
  • Project:
    Azad Laxmi Nagar Sra Chs
  • Location:
  • Cts No 1A/178/2 Survey No 161
  • Const. Stage:
    New
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Goodbuild (India) Private Limited
  • Phone:
  • Address:
  • God Gift Tower
Project RERA Details
MAHA REARA No: P51800004539
Project Type Residential / Group Housing
RERA Project Status New
Architect Yusuf Khan
Funding Bank STATE BANK OF INDIA
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 21 Mar 2025
Last Retrived 26 Jul 2025
Azad Laxmi Nagar Sra Chs QR Code
Azad Laxmi Nagar Sra Chs
MahaRERA - P51800004539
Apartment Details & Configuration
TypeArea
1 BHK34.37 Sq.mts. ( 370 Sq.ft. )
1 BHK46.08 Sq.mts. ( 496 Sq.ft. )
2 BHK63.08 Sq.mts. ( 679 Sq.ft. )
2 BHK64.01 Sq.mts. ( 689 Sq.ft. )
2 BHK70.98 Sq.mts. ( 764 Sq.ft. )
2 BHK74.69 Sq.mts. ( 804 Sq.ft. )
3 BHK85.66 Sq.mts. ( 922 Sq.ft. )
Shop256.5 Sq.mts. ( 2761 Sq.ft. )
Shop1101.6 Sq.mts. ( 11858 Sq.ft. )
Shop6.97 Sq.mts. ( 75 Sq.ft. )
Shop12.55 Sq.mts. ( 135 Sq.ft. )
Shop13.1 Sq.mts. ( 141 Sq.ft. )
Shop14.86 Sq.mts. ( 160 Sq.ft. )
Shop16.73 Sq.mts. ( 180 Sq.ft. )
Shop17.47 Sq.mts. ( 188 Sq.ft. )
Shop22.53 Sq.mts. ( 243 Sq.ft. )
Shop23.04 Sq.mts. ( 248 Sq.ft. )
Shop27.14 Sq.mts. ( 292 Sq.ft. )
Shop28.99 Sq.mts. ( 312 Sq.ft. )
Shop29.08 Sq.mts. ( 313 Sq.ft. )
Shop30.29 Sq.mts. ( 326 Sq.ft. )
Shop31.68 Sq.mts. ( 341 Sq.ft. )
Shop32.05 Sq.mts. ( 345 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Azad Laxmi Nagar Sra Chslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Started The Work
Community Buildings
Not Started The Work
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
100% Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
100% Completed
Landscaping & Tree Planting
Not Started The Work
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)80% completed
80% Complete
80% Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
100 % Completed
Street Lighting
Not Started The Work
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
100 % Completed
Water Supply100% completed
95% Complete
100% Completed
Buildings / Wings in Azad Laxmi Nagar Sra Chs
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Azad Laxmi Nagar Sra Chs by Goodbuild (India) Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

31216 Sq. ft.

Project Area

2497 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

105 apartments in total
Total
105
Booked
85
Available
20

Saleable Area Statistics (Sq. ft.)

70752 Total
Total
70752
Booked
62940
Available
7812
Total 105 apartments in project. 85 apartments booked. 80% apartments booked.
Total 70752 Sq.ft. saleable area. 62940 saleable area booked.
89% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 202321100300
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.37 Sq.mts. ( 370 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK46.08 Sq.mts. ( 496 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK63.08 Sq.mts. ( 679 Sq.ft. )26
21 Booked80% Booked
80% Booked
2 BHK64.01 Sq.mts. ( 689 Sq.ft. )11
10 Booked90% Booked
90% Booked
2 BHK70.98 Sq.mts. ( 764 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK74.69 Sq.mts. ( 804 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK85.66 Sq.mts. ( 922 Sq.ft. )11
10 Booked90% Booked
90% Booked
Shop256.5 Sq.mts. ( 2761 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop1101.6 Sq.mts. ( 11858 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop6.97 Sq.mts. ( 75 Sq.ft. )5
None Booked0% Booked
0% Booked
Shop12.55 Sq.mts. ( 135 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.1 Sq.mts. ( 141 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.86 Sq.mts. ( 160 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop16.73 Sq.mts. ( 180 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.47 Sq.mts. ( 188 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop22.53 Sq.mts. ( 243 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop23.04 Sq.mts. ( 248 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop27.14 Sq.mts. ( 292 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop28.99 Sq.mts. ( 312 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop29.08 Sq.mts. ( 313 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop30.29 Sq.mts. ( 326 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop31.68 Sq.mts. ( 341 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop32.05 Sq.mts. ( 345 Sq.ft. )1
None Booked0% Booked
0% Booked
85 total apartments / 68 apartments booked. 80% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B-Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B-WingDec 202321100300
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.08 Sq.mts. ( 313 Sq.ft. )20
17 Booked85% Booked
85% Booked
20 total apartments / 17 apartments booked. 85% apartments booked.
Work Description in Building B-WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Goodbuild (India) Private Limited
for Project
Azad Laxmi Nagar Sra Chs
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation