Project overview

Ayesha Tower is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700049825. Ayesha Tower is located at Plot No. 11/ Gat No.11/ Old Survey No. 125/1/2. This is a New being developed by Asrar Ahmed Abdul Rasid Chowkar.

Ayesha Tower has 1 BHK & 1RK Apartments with carpet areas ranging from 1717 to 8400 Sq.ft. Carpet. The Project has total 28 of which 16 are currently available for sale.

Ayesha Tower is being developed on a total land area of 5770 Sq.ft. Ayesha Tower has 1 Wings / Towers Ayesha Tower

ProjectDeveloperLocationPossession
Ayesha TowerAsrar Ahmed Abdul Rasid ChowkarPlot No. 11/ Gat No.11/ Old Survey No. 125/1/226-01-2026 00:00:00
Sunita PalaceShree Ganesh BuildconSurvey No 33 Hissa No 1 Plot No 1531-12-2026 00:00:00
Tulsi VrundavanTulsi Builders And DevelopersGut No.13 & 1430-09-2026 00:00:00
Project Details
  • Project:
    Ayesha Tower
  • Location:
  • Plot No. 11/ Gat No.11/ Old Survey No. 125/1/2
  • Const. Stage:
    New
  • Possession:
    26 Jan 2026
Developer Details

  • Developer:
    Asrar Ahmed Abdul Rasid Chowkar
  • Phone:
  • Address:
  • Kalanagar
Project RERA Details
MAHA REARA No: P51700049825
Project Type Residential / Group Housing
RERA Project Status New
Architect Arvind Shankar Khanwalkar
Funding Bank STATE BANK OF INDIA
Proposed Possession 26 Jan 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 24 Feb 2023
Last Retrived 26 Jul 2025
Ayesha Tower QR Code
Ayesha Tower
MahaRERA - P51700049825
Apartment Details & Configuration
TypeArea
1 BHK780.36 Sq.mts. ( 8400 Sq.ft. )
1RK159.53 Sq.mts. ( 1717 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ayesha Towerlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Ayesha Tower
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ayesha Tower by Asrar Ahmed Abdul Rasid Chowkarlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5770 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

28 apartments in total
Total
28
Booked
12
Available
16

Saleable Area Statistics (Sq. ft.)

188416 Total
Total
188416
Booked
80750
Available
107666
Total 28 apartments in project. 12 apartments booked. 42% apartments booked.
Total 188416 Sq.ft. saleable area. 80750 saleable area booked.
43% area booked.

Ayesha Tower

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ayesha TowerJan 2026710101147
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK780.36 Sq.mts. ( 8400 Sq.ft. )21
9 Booked42% Booked
42% Booked
1RK159.53 Sq.mts. ( 1717 Sq.ft. )7
3 Booked42% Booked
42% Booked
28 total apartments / 12 apartments booked. 42% apartments booked.
Work Description in Building Ayesha TowerCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress21% done
21% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress79% done
79% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress72% done
72% Booked
Channel Partners
Channel Partners Registered by Developer
Asrar Ahmed Abdul Rasid Chowkar
for Project
Ayesha Tower
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation