Project overview

Ayan Residency - Phase - 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000006966. Ayan Residency - Phase - 1 is located at 195 H No 1 Part. This is a Ongoing being developed by Magnum Home Makers Pvt. Ltd..

Ayan Residency - Phase - 1 has 2 BHK Apartments with carpet areas ranging from 474 to 496 Sq.ft. Carpet. The Project has total 1098 of which 260 are currently available for sale.

Ayan Residency - Phase - 1 is being developed on a total land area of 454192 Sq.ft. Ayan Residency - Phase - 1 has 23 Wings / Towers Building 1 - 8Th To 16Th Floors,Building 1 - Stilt To 7Th Floor,Building 10 - 8Th To 16Th Floors,Building 10 - Stilt To 7Th Floors,Building 11 - 8Th To 16Th Floors,Building 11 - Stilt To 7Th Floors,Building 2 - 8Th To 16Th Floors,Building 2 - Stilt To 7Th Floors,Building 23 -,Building 3 - 8Th To 16Th Floors,Building 3 - Stilt To 7Th Floors,Building 4 - 8Th To 16Th Floors,Building 4 - Stilt To 7Th Floors,Building 5 - 8Th To 16Th Floors,Building 5 - Stilt To 7Th Floors,Building 6 - 8Th To 16Th Floors,Building 6 - Stilt To 7Th Floors,Building 7 - 8Th To 16Th Floors,Building 7 - Stilt To 7Th Floors,Building 8 - 8Th To 16Th Floors,Building 8 - Stilt To 7Th Floors,Building 9 - 8Th To 16Th Floors,Building 9 - Stilt To 7Th Floors

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Ayan Residency - Phase - 1
  • Location:
  • 195 H No 1 Part
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Magnum Home Makers Pvt. Ltd.
  • Phone:
  • Address:
  • A Wing
Project RERA Details
MAHA REARA No: P99000006966
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Dec 2024
Revised Possession 30 Dec 2024
Extended Possession
Litigations No Litigations
Last Modified 16 Aug 2017
Last Retrived 28 Jul 2025
Ayan Residency - Phase - 1 QR Code
Ayan Residency - Phase - 1
MahaRERA - P99000006966
Apartment Details & Configuration
TypeArea
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )
1RK12.15 Sq.mts. ( 131 Sq.ft. )
Shop28.11 Sq.mts. ( 303 Sq.ft. )
Shop28.75 Sq.mts. ( 309 Sq.ft. )
Shop35.54 Sq.mts. ( 383 Sq.ft. )
Shop40.77 Sq.mts. ( 439 Sq.ft. )
Shop77.5 Sq.mts. ( 834 Sq.ft. )
Shop89.97 Sq.mts. ( 968 Sq.ft. )
Shop21.44 Sq.mts. ( 231 Sq.ft. )
Shop21.66 Sq.mts. ( 233 Sq.ft. )
Shop24.26 Sq.mts. ( 261 Sq.ft. )
Shop32 Sq.mts. ( 344 Sq.ft. )
Shop14.45 Sq.mts. ( 156 Sq.ft. )
Shop18.62 Sq.mts. ( 200 Sq.ft. )
Shop19.13 Sq.mts. ( 206 Sq.ft. )
Shop15.93 Sq.mts. ( 171 Sq.ft. )
Shop18.58 Sq.mts. ( 200 Sq.ft. )
Shop26.9 Sq.mts. ( 290 Sq.ft. )
Shop104.78 Sq.mts. ( 1128 Sq.ft. )
Shop23.96 Sq.mts. ( 258 Sq.ft. )
00 Sq.mts. ( 0 Sq.ft. )
2 BHK44.46 Sq.mts. ( 479 Sq.ft. )
2 BHK44.83 Sq.mts. ( 483 Sq.ft. )
2 BHK45.59 Sq.mts. ( 491 Sq.ft. )
2 BHK46.5 Sq.mts. ( 501 Sq.ft. )
2 BHK46.55 Sq.mts. ( 501 Sq.ft. )
2 BHK55.44 Sq.mts. ( 597 Sq.ft. )
2 BHK44 Sq.mts. ( 474 Sq.ft. )
2 BHK46.05 Sq.mts. ( 496 Sq.ft. )
Shop46.31 Sq.mts. ( 498 Sq.ft. )
Shop72.17 Sq.mts. ( 777 Sq.ft. )
Shop100.77 Sq.mts. ( 1085 Sq.ft. )
Shop378.48 Sq.mts. ( 4074 Sq.ft. )
Shop13.88 Sq.mts. ( 149 Sq.ft. )
Shop16.62 Sq.mts. ( 179 Sq.ft. )
Shop29.61 Sq.mts. ( 319 Sq.ft. )
2 BHK56.36 Sq.mts. ( 607 Sq.ft. )
Shop11.07 Sq.mts. ( 119 Sq.ft. )
Shop15.23 Sq.mts. ( 164 Sq.ft. )
Shop18.31 Sq.mts. ( 197 Sq.ft. )
Shop25.28 Sq.mts. ( 272 Sq.ft. )
Shop32.55 Sq.mts. ( 350 Sq.ft. )
Shop25.26 Sq.mts. ( 272 Sq.ft. )
1RK14.66 Sq.mts. ( 158 Sq.ft. )
Shop25.55 Sq.mts. ( 275 Sq.ft. )
Shop14.79 Sq.mts. ( 159 Sq.ft. )
Shop15.51 Sq.mts. ( 167 Sq.ft. )
Shop24.15 Sq.mts. ( 260 Sq.ft. )
Shop25.3 Sq.mts. ( 272 Sq.ft. )
Shop11.32 Sq.mts. ( 122 Sq.ft. )
Shop15.49 Sq.mts. ( 167 Sq.ft. )
Shop18.57 Sq.mts. ( 200 Sq.ft. )
Shop25.49 Sq.mts. ( 274 Sq.ft. )
2 BHK54.31 Sq.mts. ( 585 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ayan Residency - Phase - 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Yet Started
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station4% completed
4% Complete
In Progress
Energy management
Not Yet Started
Fire Protection And Fire Safety Requirements
Not Yet Started
Landscaping & Tree Planting
Not Yet Started
Open Parking
Not Yet Started
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Yet Started
Solid Waste Management And Disposal
Not Yet Started
Storm Water Drains
Not Yet Started
Street Lighting
Not Yet Started
Treatment And Disposal Of Sewage And Sullage Water
Not Yet Started
Water Conservation, Rain water Harvesting
Not Yet Started
Water Supply
Not Yet Started
Buildings / Wings in Ayan Residency - Phase - 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ayan Residency - Phase - 1 by Magnum Home Makers Pvt. Ltd.last updated on 28 Jul 2025 as per information obtained from MARA RERA.

454192 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 23

Wings / Towers in Project

Apartments Statistics

1098 apartments in total
Total
1098
Booked
838
Available
260

Saleable Area Statistics (Sq. ft.)

384932 Total
Total
384932
Booked
293001
Available
91931
Total 1098 apartments in project. 838 apartments booked. 76% apartments booked.
Total 384932 Sq.ft. saleable area. 293001 saleable area booked.
76% area booked.

Building 1 - 8Th To 16Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 1 - 8Th To 16Th FloorsDec 202390000011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )49
20 Booked40% Booked
40% Booked
1RK12.15 Sq.mts. ( 131 Sq.ft. )1
1 Booked100% Booked
100% Booked
50 total apartments / 21 apartments booked. 42% apartments booked.
Work Description in Building Building 1 - 8Th To 16Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress54% done
54% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress54% done
54% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress60% done
60% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 1 - Stilt To 7Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 1 - Stilt To 7Th FloorDec 20237101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )56
56 Booked100% Booked
100% Booked
Shop28.11 Sq.mts. ( 303 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop28.75 Sq.mts. ( 309 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop35.54 Sq.mts. ( 383 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop40.77 Sq.mts. ( 439 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop77.5 Sq.mts. ( 834 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop89.97 Sq.mts. ( 968 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop21.44 Sq.mts. ( 231 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.66 Sq.mts. ( 233 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.26 Sq.mts. ( 261 Sq.ft. )1
1 Booked100% Booked
100% Booked
65 total apartments / 58 apartments booked. 89% apartments booked.
Work Description in Building Building 1 - Stilt To 7Th FloorCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress99% done
99% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 10 - 8Th To 16Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 10 - 8Th To 16Th FloorsDec 202390000011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )69
44 Booked63% Booked
63% Booked
1RK12.15 Sq.mts. ( 131 Sq.ft. )1
None Booked0% Booked
0% Booked
70 total apartments / 44 apartments booked. 62% apartments booked.
Work Description in Building Building 10 - 8Th To 16Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress57% done
57% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress57% done
57% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress60% done
60% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 10 - Stilt To 7Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 10 - Stilt To 7Th FloorsDec 20237101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )56
55 Booked98% Booked
98% Booked
Shop32 Sq.mts. ( 344 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.45 Sq.mts. ( 156 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.62 Sq.mts. ( 200 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.13 Sq.mts. ( 206 Sq.ft. )1
None Booked0% Booked
0% Booked
60 total apartments / 55 apartments booked. 91% apartments booked.
Work Description in Building Building 10 - Stilt To 7Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress99% done
99% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 11 - 8Th To 16Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 11 - 8Th To 16Th FloorsDec 202390000011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )69
47 Booked68% Booked
68% Booked
1RK12.15 Sq.mts. ( 131 Sq.ft. )1
None Booked0% Booked
0% Booked
70 total apartments / 47 apartments booked. 67% apartments booked.
Work Description in Building Building 11 - 8Th To 16Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress54% done
54% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress54% done
54% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress60% done
60% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 11 - Stilt To 7Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 11 - Stilt To 7Th FloorsDec 20237101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )56
53 Booked94% Booked
94% Booked
Shop15.93 Sq.mts. ( 171 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.58 Sq.mts. ( 200 Sq.ft. )3
None Booked0% Booked
0% Booked
Shop26.9 Sq.mts. ( 290 Sq.ft. )1
None Booked0% Booked
0% Booked
61 total apartments / 53 apartments booked. 86% apartments booked.
Work Description in Building Building 11 - Stilt To 7Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress99% done
99% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 2 - 8Th To 16Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 2 - 8Th To 16Th FloorsDec 202390000011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )69
49 Booked71% Booked
71% Booked
1RK12.15 Sq.mts. ( 131 Sq.ft. )1
1 Booked100% Booked
100% Booked
70 total apartments / 50 apartments booked. 71% apartments booked.
Work Description in Building Building 2 - 8Th To 16Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress57% done
57% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress57% done
57% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress63% done
63% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress60% done
60% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 2 - Stilt To 7Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 2 - Stilt To 7Th FloorsDec 20237101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )56
56 Booked100% Booked
100% Booked
Shop104.78 Sq.mts. ( 1128 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.96 Sq.mts. ( 258 Sq.ft. )1
None Booked0% Booked
0% Booked
58 total apartments / 56 apartments booked. 96% apartments booked.
Work Description in Building Building 2 - Stilt To 7Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress99% done
99% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 23 -

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 23 -Jan 19000000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Building 23 -Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building 3 - 8Th To 16Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 3 - 8Th To 16Th FloorsDec 202390000011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.46 Sq.mts. ( 479 Sq.ft. )9
7 Booked77% Booked
77% Booked
2 BHK44.83 Sq.mts. ( 483 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK45.59 Sq.mts. ( 491 Sq.ft. )7
5 Booked71% Booked
71% Booked
2 BHK46.5 Sq.mts. ( 501 Sq.ft. )9
7 Booked77% Booked
77% Booked
2 BHK46.55 Sq.mts. ( 501 Sq.ft. )7
4 Booked57% Booked
57% Booked
2 BHK55.44 Sq.mts. ( 597 Sq.ft. )2
2 Booked100% Booked
100% Booked
41 total apartments / 32 apartments booked. 78% apartments booked.
Work Description in Building Building 3 - 8Th To 16Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress66% done
66% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress57% done
57% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress57% done
57% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress66% done
66% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 3 - Stilt To 7Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 3 - Stilt To 7Th FloorsDec 20237101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44 Sq.mts. ( 474 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK44.83 Sq.mts. ( 483 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK46.05 Sq.mts. ( 496 Sq.ft. )7
7 Booked100% Booked
100% Booked
Shop46.31 Sq.mts. ( 498 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop72.17 Sq.mts. ( 777 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop100.77 Sq.mts. ( 1085 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop378.48 Sq.mts. ( 4074 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.88 Sq.mts. ( 149 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.62 Sq.mts. ( 179 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop29.61 Sq.mts. ( 319 Sq.ft. )1
None Booked0% Booked
0% Booked
35 total apartments / 28 apartments booked. 80% apartments booked.
Work Description in Building Building 3 - Stilt To 7Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress99% done
99% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 4 - 8Th To 16Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 4 - 8Th To 16Th FloorsDec 202390000011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.46 Sq.mts. ( 479 Sq.ft. )7
4 Booked57% Booked
57% Booked
2 BHK45.59 Sq.mts. ( 491 Sq.ft. )9
4 Booked44% Booked
44% Booked
2 BHK46.5 Sq.mts. ( 501 Sq.ft. )7
5 Booked71% Booked
71% Booked
2 BHK46.55 Sq.mts. ( 501 Sq.ft. )9
4 Booked44% Booked
44% Booked
2 BHK56.36 Sq.mts. ( 607 Sq.ft. )2
1 Booked50% Booked
50% Booked
34 total apartments / 18 apartments booked. 52% apartments booked.
Work Description in Building Building 4 - 8Th To 16Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress66% done
66% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress57% done
57% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress57% done
57% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress66% done
66% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 4 - Stilt To 7Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 4 - Stilt To 7Th FloorsDec 20237101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44 Sq.mts. ( 474 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK44.83 Sq.mts. ( 483 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK46.05 Sq.mts. ( 496 Sq.ft. )7
7 Booked100% Booked
100% Booked
Shop11.07 Sq.mts. ( 119 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.23 Sq.mts. ( 164 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.31 Sq.mts. ( 197 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.28 Sq.mts. ( 272 Sq.ft. )1
None Booked0% Booked
0% Booked
32 total apartments / 29 apartments booked. 90% apartments booked.
Work Description in Building Building 4 - Stilt To 7Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress99% done
99% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 5 - 8Th To 16Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 5 - 8Th To 16Th FloorsDec 202390000011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )69
46 Booked66% Booked
66% Booked
1RK12.15 Sq.mts. ( 131 Sq.ft. )1
None Booked0% Booked
0% Booked
70 total apartments / 46 apartments booked. 65% apartments booked.
Work Description in Building Building 5 - 8Th To 16Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress57% done
57% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress57% done
57% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress63% done
63% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress60% done
60% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 5 - Stilt To 7Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 5 - Stilt To 7Th FloorsDec 20237101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )56
56 Booked100% Booked
100% Booked
Shop32.55 Sq.mts. ( 350 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop25.26 Sq.mts. ( 272 Sq.ft. )1
None Booked0% Booked
0% Booked
59 total apartments / 56 apartments booked. 94% apartments booked.
Work Description in Building Building 5 - Stilt To 7Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress99% done
99% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 6 - 8Th To 16Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 6 - 8Th To 16Th FloorsDec 202390000011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )52
32 Booked61% Booked
61% Booked
1RK14.66 Sq.mts. ( 158 Sq.ft. )18
8 Booked44% Booked
44% Booked
70 total apartments / 40 apartments booked. 57% apartments booked.
Work Description in Building Building 6 - 8Th To 16Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress57% done
57% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress57% done
57% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress63% done
63% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress60% done
60% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 6 - Stilt To 7Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 6 - Stilt To 7Th FloorsDec 20237101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.19 Sq.mts. ( 293 Sq.ft. )42
42 Booked100% Booked
100% Booked
1RK14.66 Sq.mts. ( 158 Sq.ft. )14
14 Booked100% Booked
100% Booked
Shop25.55 Sq.mts. ( 275 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop32.55 Sq.mts. ( 350 Sq.ft. )2
None Booked0% Booked
0% Booked
59 total apartments / 56 apartments booked. 94% apartments booked.
Work Description in Building Building 6 - Stilt To 7Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress99% done
99% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 7 - 8Th To 16Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 7 - 8Th To 16Th FloorsDec 202390000011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.46 Sq.mts. ( 479 Sq.ft. )9
7 Booked77% Booked
77% Booked
2 BHK45.59 Sq.mts. ( 491 Sq.ft. )7
3 Booked42% Booked
42% Booked
2 BHK46.5 Sq.mts. ( 501 Sq.ft. )9
6 Booked66% Booked
66% Booked
2 BHK46.55 Sq.mts. ( 501 Sq.ft. )7
4 Booked57% Booked
57% Booked
2 BHK56.36 Sq.mts. ( 607 Sq.ft. )2
2 Booked100% Booked
100% Booked
34 total apartments / 22 apartments booked. 64% apartments booked.
Work Description in Building Building 7 - 8Th To 16Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress66% done
66% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress57% done
57% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress57% done
57% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress66% done
66% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 7 - Stilt To 7Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 7 - Stilt To 7Th FloorsDec 20237101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44 Sq.mts. ( 474 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK44.83 Sq.mts. ( 483 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK46.05 Sq.mts. ( 496 Sq.ft. )7
7 Booked100% Booked
100% Booked
Shop14.79 Sq.mts. ( 159 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.51 Sq.mts. ( 167 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.15 Sq.mts. ( 260 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.3 Sq.mts. ( 272 Sq.ft. )1
None Booked0% Booked
0% Booked
32 total apartments / 28 apartments booked. 87% apartments booked.
Work Description in Building Building 7 - Stilt To 7Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress99% done
99% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 8 - 8Th To 16Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 8 - 8Th To 16Th FloorsDec 202390000011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.46 Sq.mts. ( 479 Sq.ft. )7
5 Booked71% Booked
71% Booked
2 BHK45.59 Sq.mts. ( 491 Sq.ft. )9
6 Booked66% Booked
66% Booked
2 BHK46.5 Sq.mts. ( 501 Sq.ft. )7
4 Booked57% Booked
57% Booked
2 BHK46.55 Sq.mts. ( 501 Sq.ft. )9
6 Booked66% Booked
66% Booked
2 BHK56.36 Sq.mts. ( 607 Sq.ft. )2
2 Booked100% Booked
100% Booked
34 total apartments / 23 apartments booked. 67% apartments booked.
Work Description in Building Building 8 - 8Th To 16Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress66% done
66% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress57% done
57% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress57% done
57% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress66% done
66% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 8 - Stilt To 7Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 8 - Stilt To 7Th FloorsDec 20237101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44 Sq.mts. ( 474 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK44.83 Sq.mts. ( 483 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK46.05 Sq.mts. ( 496 Sq.ft. )7
7 Booked100% Booked
100% Booked
Shop11.32 Sq.mts. ( 122 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.49 Sq.mts. ( 167 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.57 Sq.mts. ( 200 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.49 Sq.mts. ( 274 Sq.ft. )1
None Booked0% Booked
0% Booked
32 total apartments / 28 apartments booked. 87% apartments booked.
Work Description in Building Building 8 - Stilt To 7Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress99% done
99% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 9 - 8Th To 16Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 9 - 8Th To 16Th FloorsDec 202390000011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.46 Sq.mts. ( 479 Sq.ft. )7
3 Booked42% Booked
42% Booked
2 BHK45.59 Sq.mts. ( 491 Sq.ft. )9
7 Booked77% Booked
77% Booked
2 BHK46.5 Sq.mts. ( 501 Sq.ft. )7
4 Booked57% Booked
57% Booked
2 BHK46.55 Sq.mts. ( 501 Sq.ft. )9
6 Booked66% Booked
66% Booked
2 BHK54.31 Sq.mts. ( 585 Sq.ft. )2
1 Booked50% Booked
50% Booked
34 total apartments / 21 apartments booked. 61% apartments booked.
Work Description in Building Building 9 - 8Th To 16Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress66% done
66% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress57% done
57% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress57% done
57% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress66% done
66% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 9 - Stilt To 7Th Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 9 - Stilt To 7Th FloorsNov 20227101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44 Sq.mts. ( 474 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK44.83 Sq.mts. ( 483 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK46.05 Sq.mts. ( 496 Sq.ft. )7
6 Booked85% Booked
85% Booked
28 total apartments / 27 apartments booked. 96% apartments booked.
Work Description in Building Building 9 - Stilt To 7Th FloorsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress99% done
99% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress99% done
99% Booked
Sanitary Fittings within the flats / premises
work-in-progress99% done
99% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress99% done
99% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress99% done
99% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Magnum Home Makers Pvt. Ltd.
for Project
Ayan Residency - Phase - 1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.