Project overview

Avenue 15 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900032165. Avenue 15 is located at Plot No. 5C/172. This is a New being developed by Ramesh Barrel Supplying Co.

Avenue 15 has 1 BHK, 1.5 Bhk, 1RK, 2 BHK & Commercial Apartments with carpet areas ranging from 264 to 871 Sq.ft. Carpet. The Project has total 127 of which 110 are currently available for sale.

Avenue 15 is being developed on a total land area of 23085 Sq.ft. out of which 2024 Sq.ft. i.e 9% is reserved for recreational purposes. Avenue 15 has 1 Wings / Towers Avenue 15

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Avenue 15
  • Location:
  • Plot No. 5C/172
  • Const. Stage:
    New
  • Possession:
    31 Mar 2025
Developer Details

  • Developer:
    Ramesh Barrel Supplying Co
  • Phone:
  • Address:
  • K.T. Gupta Wadi
Project RERA Details
MAHA REARA No: P51900032165
Project Type Others
RERA Project Status New
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 31 Mar 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 19 Jan 2023
Last Retrived 26 Jul 2025
Avenue 15 QR Code
Avenue 15
MahaRERA - P51900032165
Apartment Details & Configuration
TypeArea
1 BHK38.7 Sq.mts. ( 417 Sq.ft. )
1 BHK40.05 Sq.mts. ( 431 Sq.ft. )
1 BHK40.35 Sq.mts. ( 434 Sq.ft. )
1 BHK40.75 Sq.mts. ( 439 Sq.ft. )
1.5 Bhk49.39 Sq.mts. ( 532 Sq.ft. )
1RK24.49 Sq.mts. ( 264 Sq.ft. )
2 BHK60.68 Sq.mts. ( 653 Sq.ft. )
Commercial80.92 Sq.mts. ( 871 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Avenue 15last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Approved Plan
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Approved Plan
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Norms
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Approved Plan
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Approved Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Approved Plan
Water Supply
As Per Approved Plan
Buildings / Wings in Avenue 15
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Avenue 15 by Ramesh Barrel Supplying Colast updated on 26 Jul 2025 as per information obtained from MARA RERA.

23085 Sq. ft.

Project Area

2024 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

127 apartments in total
Total
127
Booked
17
Available
110

Saleable Area Statistics (Sq. ft.)

61807 Total
Total
61807
Booked
8500
Available
53307
Total 127 apartments in project. 17 apartments booked. 13% apartments booked.
Total 61807 Sq.ft. saleable area. 8500 saleable area booked.
14% area booked.

Avenue 15

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Avenue 15Mar 20252310000126
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.7 Sq.mts. ( 417 Sq.ft. )21
1 BHK40.05 Sq.mts. ( 431 Sq.ft. )21
1 BHK40.35 Sq.mts. ( 434 Sq.ft. )20
1 BHK40.75 Sq.mts. ( 439 Sq.ft. )20
1.5 Bhk49.39 Sq.mts. ( 532 Sq.ft. )22
1RK24.49 Sq.mts. ( 264 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK60.68 Sq.mts. ( 653 Sq.ft. )21
Commercial80.92 Sq.mts. ( 871 Sq.ft. )1
None Booked0% Booked
0% Booked
127 total apartments / 17 apartments booked. 13% apartments booked.
Work Description in Building Avenue 15Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress45% done
45% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress45% done
45% Booked
Channel Partners
Channel Partners Registered by Developer
Ramesh Barrel Supplying Co
for Project
Avenue 15
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation