Project overview

Avani Hillview is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000018279. Avani Hillview is located at 1011 1421. This is a New being developed by Avani Hill View.

Avani Hillview has 1 BHK, 1 BHK LANDLORD & 1 BHK LANDLORD1 Apartments with carpet areas ranging from 250 to 287 Sq.ft. Carpet. The Project has total 23 of which 22 are currently available for sale.

Avani Hillview is being developed on a total land area of 10483 Sq.ft. Avani Hillview has 1 Wings / Towers B No 2 Wing A B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Avani Hillview
  • Location:
  • 1011 1421
  • Const. Stage:
    New
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Avani Hill View
  • Phone:
  • Address:
  • Chedda Complex
Project RERA Details
MAHA REARA No: P99000018279
Project Type Residential / Group Housing
RERA Project Status New
Architect Morph Design Studio
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 30 Dec 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 22 Oct 2018
Last Retrived 28 Jul 2025
Avani Hillview QR Code
Avani Hillview
MahaRERA - P99000018279
Apartment Details & Configuration
TypeArea
1 BHK26.67 Sq.mts. ( 287 Sq.ft. )
1 BHK23.21 Sq.mts. ( 250 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Avani Hillviewlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Meter Room To Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
As Per Layout
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank To Be Provided
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Layout
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Yet To Be Provided
Buildings / Wings in Avani Hillview
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Avani Hillview by Avani Hill Viewlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

10483 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

23 apartments in total
Total
23
Booked
1
Available
22

Saleable Area Statistics (Sq. ft.)

6268 Total
Total
6268
Booked
287
Available
5980
Total 23 apartments in project. 1 apartments booked. 4% apartments booked.
Total 6268 Sq.ft. saleable area. 287 saleable area booked.
5% area booked.

B No 2 Wing A B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B No 2 Wing A BDec 20213100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.67 Sq.mts. ( 287 Sq.ft. )13
1 BHK23.21 Sq.mts. ( 250 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK LANDLORD23.21 Sq.mts. ( 250 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK LANDLORD126.67 Sq.mts. ( 287 Sq.ft. )1
None Booked0% Booked
0% Booked
23 total apartments / 1 apartments booked. 4% apartments booked.
Work Description in Building B No 2 Wing A BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Avani Hill View
for Project
Avani Hillview
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation