Project overview

Av Smart City Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000050740. Av Smart City Phase 1 is located at 1023/8. This is a New being developed by Aditya Realtors.

Av Smart City Phase 1 has Bungalow Apartments with carpet areas ranging from 571 to 571 Sq.ft. Carpet. The Project has total 278 of which 266 are currently available for sale.

Av Smart City Phase 1 is being developed on a total land area of 135626 Sq.ft. Av Smart City Phase 1 has 13 Wings / Towers Bldg No 1 Type A,Bldg No 1 Type B,Bldg No 2 Type C,Bldg No 3 Type D,Bldg No 4 Type C1,Bldg No 5 Type D1,Bldg No 6 Type E,Bldg No 7 Type E,Bldg No 7 Type E1,Bldg No 8 Type E,Bldg No 8 Type E1,Bldg No 9 Type E,Bldg No 9 Type E1

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Av Smart City Phase 1
  • Location:
  • 1023/8
  • Const. Stage:
    New
  • Possession:
    31 Dec 2027
Developer Details

  • Developer:
    Aditya Realtors
  • Phone:
  • Address:
  • Sanskruti Bldg
Project RERA Details
MAHA REARA No: P99000050740
Project Type Others
RERA Project Status New
Architect Vastu Shilp
Funding Bank AXIS BANK
Proposed Possession 31 Dec 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Apr 2023
Last Retrived 28 Jul 2025
Av Smart City Phase 1 QR Code
Av Smart City Phase 1
MahaRERA - P99000050740
Apartment Details & Configuration
TypeArea
1 BHK28.85 Sq.mts. ( 311 Sq.ft. )
1 BHK29.11 Sq.mts. ( 313 Sq.ft. )
1 BHK30.24 Sq.mts. ( 326 Sq.ft. )
1 BHK30.7 Sq.mts. ( 330 Sq.ft. )
2 BHK45.07 Sq.mts. ( 485 Sq.ft. )
Shop10.51 Sq.mts. ( 113 Sq.ft. )
Shop10.67 Sq.mts. ( 115 Sq.ft. )
Shop12.26 Sq.mts. ( 132 Sq.ft. )
Shop12.55 Sq.mts. ( 135 Sq.ft. )
Shop16.07 Sq.mts. ( 173 Sq.ft. )
Shop19.05 Sq.mts. ( 205 Sq.ft. )
Shop15.91 Sq.mts. ( 171 Sq.ft. )
Shop13.41 Sq.mts. ( 144 Sq.ft. )
Bungalow53.05 Sq.mts. ( 571 Sq.ft. )
Bungalow45.28 Sq.mts. ( 487 Sq.ft. )
Bungalow45.44 Sq.mts. ( 489 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Av Smart City Phase 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
Water Supply To Be Provided
Water Conservation, Rain water Harvesting
Rain Water Harvesting To Be Provided
Treatment And Disposal Of Sewage And Sullage Water
Na
Street Lighting
Street Lighting To Be Provided
Storm Water Drains
Storm Water Drains To Be Provided
Solid Waste Management And Disposal
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Sewerage To Be Provided
Open Parking
Na
Landscaping & Tree Planting
Tree Planting Has To Be Provided
Fire Protection And Fire Safety Requirements
Na
Energy management
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Room To Be Provided
Community Buildings
Na
Aggregate area of recreational Open Space
Na
Buildings / Wings in Av Smart City Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Av Smart City Phase 1 by Aditya Realtorslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

135626 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 13

Wings / Towers in Project

Apartments Statistics

278 apartments in total
Total
278
Booked
12
Available
266

Saleable Area Statistics (Sq. ft.)

94125 Total
Total
94125
Booked
3771
Available
90353
Total 278 apartments in project. 12 apartments booked. 4% apartments booked.
Total 94125 Sq.ft. saleable area. 3771 saleable area booked.
4% area booked.

Bldg No 1 Type A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 1 Type ADec 20277100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.85 Sq.mts. ( 311 Sq.ft. )9
1 BHK29.11 Sq.mts. ( 313 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK30.24 Sq.mts. ( 326 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK30.7 Sq.mts. ( 330 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK45.07 Sq.mts. ( 485 Sq.ft. )11
None Booked0% Booked
0% Booked
Shop10.51 Sq.mts. ( 113 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.67 Sq.mts. ( 115 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.26 Sq.mts. ( 132 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop12.55 Sq.mts. ( 135 Sq.ft. )4
1 Booked25% Booked
25% Booked
Shop16.07 Sq.mts. ( 173 Sq.ft. )9
None Booked0% Booked
0% Booked
Shop19.05 Sq.mts. ( 205 Sq.ft. )1
None Booked0% Booked
0% Booked
55 total apartments / 3 apartments booked. 5% apartments booked.
Work Description in Building Bldg No 1 Type ACompletion
Basement (if any)
work-in-progress50% done
50% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress50% done
50% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Bldg No 1 Type B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 1 Type BDec 20277100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.85 Sq.mts. ( 311 Sq.ft. )9
None Booked0% Booked
0% Booked
1 BHK29.11 Sq.mts. ( 313 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK30.24 Sq.mts. ( 326 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK30.7 Sq.mts. ( 330 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK45.07 Sq.mts. ( 485 Sq.ft. )9
None Booked0% Booked
0% Booked
Shop10.51 Sq.mts. ( 113 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.26 Sq.mts. ( 132 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.55 Sq.mts. ( 135 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop15.91 Sq.mts. ( 171 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.07 Sq.mts. ( 173 Sq.ft. )1
None Booked0% Booked
0% Booked
45 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 1 Type BCompletion
Basement (if any)
work-in-progress50% done
50% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress50% done
50% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Bldg No 2 Type C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 2 Type CDec 20277100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.85 Sq.mts. ( 311 Sq.ft. )9
None Booked0% Booked
0% Booked
1 BHK29.11 Sq.mts. ( 313 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK30.24 Sq.mts. ( 326 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK30.7 Sq.mts. ( 330 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK45.07 Sq.mts. ( 485 Sq.ft. )3
None Booked0% Booked
0% Booked
Shop10.67 Sq.mts. ( 115 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.26 Sq.mts. ( 132 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.55 Sq.mts. ( 135 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.41 Sq.mts. ( 144 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.07 Sq.mts. ( 173 Sq.ft. )4
None Booked0% Booked
0% Booked
33 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 2 Type CCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Bldg No 3 Type D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 3 Type DDec 20277100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.85 Sq.mts. ( 311 Sq.ft. )9
None Booked0% Booked
0% Booked
1 BHK29.11 Sq.mts. ( 313 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK30.24 Sq.mts. ( 326 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK30.7 Sq.mts. ( 330 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK45.07 Sq.mts. ( 485 Sq.ft. )11
None Booked0% Booked
0% Booked
Shop28.85 Sq.mts. ( 311 Sq.ft. )5
None Booked0% Booked
0% Booked
43 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 3 Type DCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Bldg No 4 Type C1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 4 Type C1Dec 20277100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.85 Sq.mts. ( 311 Sq.ft. )9
3 Booked33% Booked
33% Booked
1 BHK29.11 Sq.mts. ( 313 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK30.24 Sq.mts. ( 326 Sq.ft. )6
2 Booked33% Booked
33% Booked
1 BHK30.7 Sq.mts. ( 330 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK45.07 Sq.mts. ( 485 Sq.ft. )11
Shop10.67 Sq.mts. ( 115 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.26 Sq.mts. ( 132 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.55 Sq.mts. ( 135 Sq.ft. )3
None Booked0% Booked
0% Booked
Shop13.41 Sq.mts. ( 144 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.07 Sq.mts. ( 173 Sq.ft. )4
None Booked0% Booked
0% Booked
47 total apartments / 7 apartments booked. 14% apartments booked.
Work Description in Building Bldg No 4 Type C1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 5 Type D1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 5 Type D1Dec 20277100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.85 Sq.mts. ( 311 Sq.ft. )9
1 BHK29.11 Sq.mts. ( 313 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK30.24 Sq.mts. ( 326 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK30.7 Sq.mts. ( 330 Sq.ft. )5
1 Booked20% Booked
20% Booked
2 BHK45.07 Sq.mts. ( 485 Sq.ft. )9
None Booked0% Booked
0% Booked
39 total apartments / 2 apartments booked. 5% apartments booked.
Work Description in Building Bldg No 5 Type D1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress85% done
85% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress45% done
45% Booked
Stilt Floor

Bldg No 6 Type E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 6 Type EDec 20271100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow53.05 Sq.mts. ( 571 Sq.ft. )2
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 6 Type ECompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Bldg No 7 Type E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 7 Type EDec 20271100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow45.28 Sq.mts. ( 487 Sq.ft. )1
None Booked0% Booked
0% Booked
Bungalow45.44 Sq.mts. ( 489 Sq.ft. )1
None Booked0% Booked
0% Booked
Bungalow53.05 Sq.mts. ( 571 Sq.ft. )2
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 7 Type ECompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Bldg No 7 Type E1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 7 Type E1Dec 20271100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow45.28 Sq.mts. ( 487 Sq.ft. )1
None Booked0% Booked
0% Booked
Bungalow45.44 Sq.mts. ( 489 Sq.ft. )1
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 7 Type E1Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Bldg No 8 Type E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 8 Type EDec 20271100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow53.05 Sq.mts. ( 571 Sq.ft. )2
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 8 Type ECompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Bldg No 8 Type E1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 8 Type E1Dec 20271100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow53.05 Sq.mts. ( 571 Sq.ft. )2
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 8 Type E1Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Bldg No 9 Type E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 9 Type EDec 20271100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow53.05 Sq.mts. ( 571 Sq.ft. )2
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 9 Type ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 9 Type E1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 9 Type E1Dec 20271100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow53.05 Sq.mts. ( 571 Sq.ft. )2
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 9 Type E1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Aditya Realtors
for Project
Av Smart City Phase 1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation